Loading…
Loading…
Tender ID
Tender Value
₹23.6 L
EMD Value
₹47,200
Closing Date
15 Apr 2026, 6:00 pmClosed
EXECUTIVE ENGINEER-ELECT.
UDA Office Udaipur
SITC of Unified Regulation System (URS) for Street Light with Automated Load Control and Monitoring in UDA, Udaipur. 9403
2026_UITUD_549403_1
NIT_94_03
Open Tender
Electrical Works
Item Rate
90 days
Udaipur
Please Refer Tender Document
3 documents required · 3 mandatory
₹590
Refer Tender Document
₹47,200
Yes
UDA Office Udaipur
1 Apr 2026
1 Apr 2026
16 Apr 2026
1 Apr 2026
15 Apr 2026
1 Apr 2026
10 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supply, Installation, Testing & Commissioning of a Unified Regulation System (URS) for existing street lights that meets the following specifications: The system must feature a 240 MHz dual-core processor with GSM/GPRS communication capabilities and support for OTA firmware updates. It should come with an internal class 1.0 energy metering system that can provide real-time data of crucial electric load parameters along with fault and theft alerts capable of measuring voltage, current, power factor, kWh and load parameters. The URS must include remote load scheduling and control functionalities with a feedback time of less than 15 seconds. The enclosure conforms to IP65 standards, and be fire-retardant, weatherproof, and rustproof. The system should use a lightweight protocol MQTT / HTTPS based lightweight communication protocol for secure, real-time communication and include cloud-based software for comprehensive device management and remote control Web based central monitoring dashboard and mobile application. It should be able to control three phase street light load upto 8.5 KW and should come with 4 pole MCB upto 40A at Input and individual MCBs upto 40A at output for short circuit protection. Include the cost of SIM cards with a pre-paid data/voice plan for the entire 03-year warranty/subscription period & all necessary industrial-grade cables (input/output), glands, lugs, and mounting hardware required for SITC at the switching point & 03 years of Comprehensive On-site Warranty (DLP) and Operation & Maintenance (O&M). URS will be installed at site as per direction of engineering Incharge. Three phase load up to 8.5 kW | |||||
| 1.01 | Three phase load up to 8.5 kW | - | Nos. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
BOQ_979393.xls
BOQ • 0.27 MB
Conditions_03.pdf
Tender Documents • 5.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .