| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.3 LAccepted-AOC BIRSINGHPUR PALI WARD NO 13 DISTRICT UMARIA MADHYA PRADESH 484551 | UMARIA | MADHYA PRADESH | 484551 | ₹18.3 L | L1 | Accepted-AOC L1 Bidder |
| 2 | Rejected-Technical | - | - | Rejected-Technical Not eligibility as per NIT |
| Sl No | Description | Qty | Unit | Shri Bhupendra Singh L1 |
|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||
| 1.01 | Cleaning/removal of spillage coal in UG from belt conveyor structure, loading points, tailend drum, transfer point of belt conveyor and direct loading the same on to belt conveyor. | 50.44 | Per Cum | 500 ₹25,220 |
| 1.02 | Groove cutting manually by using chised/pick-axe in solid coal/stone for foundation, manhole/duggi hole /pits and excavated material to be removed and stacked separately within 50 Mtr. distance.
(In Soft stone) | 13.69 | Per Cum | 4,000 ₹54,760 |
| 1.03 | Groove cutting manually by using chised/pick-axe in solid coal/stone for foundation, manhole/duggi hole /pits and excavated material to be removed and stacked separately within 50 Mtr. distance.
(In coal) | 26.85 | Per Cum | 1,241.2 ₹33,326.22 |
| 1.04 | Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.)
For Lime : | 0.05 | Per Cum | 330 ₹16.50 |
| 1.05 | Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.)
For Sand : | 48.15 | Per Cum | 400 ₹19,260 |
| 1.06 | Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.)
For Stone aggregate below 40mm nominal size : | 71.27 | Per Cum | 350 ₹24,944.50 |
| 1.07 | Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.)
For Cement : | 571 | Per Bag (50 Kg) | 12 ₹6,852 |
| 1.08 | Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.)
For Steel : | 3,253 | Per Kg | 0.5 ₹1,626.50 |
| 1.09 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
Cold twisted bars | 3,253 | Per Kg | 20 ₹65,060 |
Updated dates
Tender Value
₹21.9 L
EMD Value
₹27,400
Closing Date
9 Mar 2026, 5:00 pmClosed
Area Survey Officer Johilla Area SECL
Area Survey Dept. GM Office Johilla Area Nowrozabad Dstt. Umaria (MP) Pin-484555
Construction of 13 Nos. Sectionalisation Stoppings in Johilla Top Seam and Johilla Bottom Seam at Pali Colliery, Pali Sub Area, Johilla Area.
2026_SECL_353678_1
SECL/GM/JOH/Survey/ eTender/25-26/15 Dt. 19.02.2026
Open Tender
Civil Works - Others
180 days
Pali Colliery
4 documents required · 4 mandatory
₹27,400
25 Apr 2026
20 Feb 2026
10 Mar 2026
20 Feb 2026
9 Mar 2026
21 Feb 2026
20 Feb 2026 - 28 Feb 2026
Item Description/ Heading
Cleaning/removal of spillage coal in UG from belt conveyor structure, loading points, tailend drum, transfer point of belt conveyor and direct loading the same on to belt conveyor.
Groove cutting manually by using chised/pick-axe in solid coal/stone for foundation, manhole/duggi hole /pits and excavated material to be removed and stacked separately within 50 Mtr. distance. (In Soft stone)
Groove cutting manually by using chised/pick-axe in solid coal/stone for foundation, manhole/duggi hole /pits and excavated material to be removed and stacked separately within 50 Mtr. distance. (In coal)
Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Lime :
Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Sand :
Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Stone aggregate below 40mm nominal size :
Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Cement :
Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Steel :
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Cold twisted bars
Centring and shuttering including strutting, propping etc. and removal of form for : walls (any thickness) including attached plisters, buttresses, plinth and string courses etc.
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforecement & all Maerial Cost- all work upto plinth level : 1:2:4 (1 Cement : 2 Coarse sand : 4 Graded stone aggregate 20 mm nominal size)
12 mm thick cement plaster (1:6, 1 Cement: 6 coarse sand) on brick work up to 5 mtr. And above in UG including curing etc. complete. (excluding cost of materials)
6 mm thick cement plaster (1:4, 1 Cement: 4 coarse sand) on RCC/PCC work up to 5 Mtr. and above in UG including curing etc. complete. (excluding cost of materials)
White washing in UG with lime to give an even shade on Old work/new work. (One coat). (excluding cost of materials)
Material rate for : Coarse Sand :
Material rate for : Metal/ Graded Stone aggregate 20mm nominal size :
Material rate for : Cement :
Material rate for : Twisted Steel bar/ Steel (10mm) :
Material rate for : Lime :
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB