| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹21.0 LAdmitted-Finance 40 NETAI NAGAR GREEN PARK KOLKATA 700099 | KOLKATA | WEST BENGAL | 700099 | +0.00% | ₹21.0 L | L1 | Admitted-Finance |
| 2 | L2₹21.6 LAdmitted-Finance 119 A 1 BAGHAJATIN REGENT ESTATE SOUTH 24 PARGANAS KOLKATA WEST BENGAL 700092 | KOLKATA | WEST BENGAL | 700092 | +2.98% | ₹21.6 L | L2 | Admitted-Finance |
| 3 | L3₹22.1 LAdmitted-Finance 87 31 BOSE PUKUR ROAD KOLKATA 700042 | KOLKATA | WEST BENGAL | 700042 | +5.10% | ₹22.1 L | L3 | Admitted-Finance |
Tender Value
₹21.0 L
EMD Value
₹42,000
Closing Date
21 Mar 2026, 2:00 pmClosed
D.G.(S_D)
5, S.N. BANERJEE ROAD Kolkata-700 013
IMPROVEMENT OF BOX DRAIN NEAR DAS PARA BRIDGE IN WARD NO. 109 UNDER BR. XII
2026_KMC_1016801_1
KMC/(S_D)/109/2/25-26
Open Tender
CIVIL WORKS
90 days
DAS PARA BRIDGE IN WARD NO. 109
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹42,000
11 May 2026
6 Mar 2026
23 Mar 2026
6 Mar 2026
21 Mar 2026
6 Mar 2026
Removal of silt, slush, musks or any other foul materials from covered nikashi / box drain of any size and depth by any method approved of impure / inflammable /asphyxiating gases from the drains etc. with staging if necessary, stacking of the materials properly away from traffic lane as far as practicable lead upto 75 mtr. with all labour and materials and hire charges of tools and plants as per direction of Engineer-in-Charge. For Covered Nikashi or Box Drain.Transportation of silt, slush or other foul materials from the working site anddisposal of the same beyond the area of Municipal Corporation / Municipality/ Notified Area Authority / Industrial Township Authority including the cost of loading, unloading, transportation and making arrangement of necessary land for disposal, spreading and leveling as necessary etc. complete (Land for disposal to be arranged by the contractor).(Payment to be made on the basis of stack measurement after deducting sinkage/shrinkage at the rate of 1/9th of volume). For Day :
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 2. Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m In ground floor including roof. (a) upto 150 mm. thick
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 3. Dismantling R.C. floor, roof, beams etc including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.(a) In ground floor including roof.
BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( 3rd Corrigenda & addenda dated 04.06.2018)
BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion. ( 3rd Corrigenda & addenda dated 04.06.2018)
ORDINARY CEMENT CONCRETE ( MIX 1:1.5:3 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES (BASED ON PWD SCHEDULE OF RATES, W.E.F. 01.11.2017 WITH CORRIGENDA DT.04.06.2018)
BUILDING WORKS ( C ) Brickworks,Concrete Works etc.40..Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m.(i) Tor steel/Mild Steel.II. JSW/JSPL/SHYAM/SRMB/BMASL/ELECTRO STEEL/SSL (10th Corrigenda & addenda dated 22.01.2020)
BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. III. EVENT MANAGEMENT : 2) Hire and labour charges for 100 mm dia bamboo railing on Jhau/Eucalyptus post 1.40 m above G.L and 0.60 m below G.L tied strongly with bamboo railing with coir rope, digging holes for posts in any sort of soil or concrete surface packing the sides etc including cost of carriage of all materials and labour complete including cost of restoration to the damages of the ground to its original condition as per direction of Engineer- in- charge after removing the barricade. (Cost of restoration to be paid separately). (a) 100 mm. dia bamboo railing and 150 mm. dia. Jhaubullah/Eucalyptus posts @ 1.80 m. apart. (i) Railing with 4 rows.
BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36...Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by 150%.
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (b) In superstructure, ground floor. ( 3rd Corrigenda & addenda dated 04.06.2018)
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster(3rd Corrigenda & addenda dated 04.06.2018)
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring
PROTECTIVE AND LINING WORKS IN CANALS & CHANNELS AND OTHER FLOOD PROTECTIVE MEASURES 2.24.Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg).
PROTECTIVE AND LINING WORKS IN CANALS & CHANNELS AND OTHER FLOOD PROTECTIVE MEASURES 2.27.Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/bag
PROTECTIVE AND LINING WORKS IN CANALS & CHANNELS AND OTHER FLOOD PROTECTIVE MEASURES 2.29.Dumping in position earth / sand filled gunny / poly bags (capacity 50kg) within a lead of 30 metre inclusive of all lifts.
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 3. Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.
CHAPTER - VII MISCELLANEOUS ITEMS Dewatering by pumps including all leads, lifts and making all arrangements of disposal. where continuous flow of water from a source other than natural or ground water is encountered in case of emergency maintenance works related to leakage. breakage and making wet connections. [Note ;- In case of any other situation demanding such emergency dewatering. use of this item is to be approved by the Superintending Engineer/Tender Accepting Authority. This item shall be executed on the specific direction duly supported by proper clarification of the E.I.C. who will be satisfied in absolute discretion that such work has not been necessitated due to any natural source of water or any fault of the Contractor]
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 13. Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
Hire and labour charges for 3.75cm. thick close timbering with planks, battens,runners,struts etc. complete removing them incl. penetration of shoring as per direction of the Engineer-in-Charge upto 1 M. trench width. (Vertical surface of contact area with supporting earth to be measured, payment for penetration will not be allowed) a) Depth upto 3.00 M below G.L.
Estimated amount
Add:18%GST
Add: 1%CESS
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_2498032.xls
BOQ • 0.31 MB
form.pdf
Tender Documents • 0.50 MB
Download all tender documents and submit your bid