Loading…
Loading…
Tender Value
₹2.8 Cr
EMD Value
₹5.5 L
Closing Date
31 Aug 2026, 6:00 pm4d left
SE
Udaipur
Construction of Hawna Kui Anicut, Village - Sarupal, P.S. - Girwa, Dist.- Udaipur
2026_WRDAS_586203_1
SE/UDR/2026-27/06
Open Tender
Civil Works
Percentage
365 days
Udaipur
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Secretary, RREIS
₹5.5 L
Yes
31 Aug 2026
12 Aug 2026
1 Sept 2026
12 Aug 2026
31 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect Hard soil mixed with Kankar / boulders, Morrum
Extra lead of excavated material.
(a) Beyond initial lead of 50 m & upto 250m | 1,077 | Cum | 108.5 | ₹1,16,854.5 |
| 2 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, de- watering wherever required complete in all respect. (a) Soft/disintegrated rock
Extra lead of excavated material.
(a) Beyond initial lead of 50 m & upto 250m | 718 | Cum | 143.5 | ₹1,03,033 |
| 3 | (b) Hard rock not requiring blasting
Extra lead of excavated material.
(a) Beyond initial lead of 50 m & upto 250m | 1,077 | Cum | 210.5 | ₹2,26,708.5 |
| 4 | © Phylites & other hard rock requiring nominal blasting
Extra lead of excavated material.
(a) Beyond initial lead of 50 m & upto 250m | 718 | Cum | 300.5 | ₹2,15,759 |
| 5 | Extra for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered (a)Soft/disintegrated rock | 359 | Cum | 33.5 | ₹12,026.5 |
| 6 | (b) Hard rock not requiring blasting | 1,077 | Cum | 50.25 | ₹54,119.25 |
| 7 | © Phylites & other hard rock requiring nominal blasting | 718 | Cum | 72.75 | ₹52,234.5 |
| 8 | Drilling holes of 35 mm diameter for anchor rods
i) Upto 1.50 m. depth | 385.5 | meter | 128 | ₹49,344 |
| 9 | Labour charges for Fixing of anchor bars in neat cement grout including cost of cement and curing etc. complete | 257 | Each | 216 | ₹55,512 |
| 10 | Supply of Tor stee anchor bars of required diameter,length and shape at site of work complete. | 2,971 | Kg. | 61.02 | ₹1,81,290.42 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.62 MB
HawnakuiBid.pdf
Tender Documents • 1.70 MB
BOQ_1041259.xls
BOQ • 0.36 MB
corrigendum1.pdf
PDF • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].