Tender Value
₹2.4 Cr
EMD Value
₹2.7 L
Closing Date
20 Feb 2026, 3:30 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
Above/Below/Par
TELECOM
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. Client certificate from other than Govt Organization should be duly supported by Form 16A/26AS generated through TRACES of Income Tax Department of India.
The tenderer must have successfully completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender.
Defination of Similar Work :- Work of excavation of trench and underground cable laying, jointing of copper cable and with trenchless cable laying. OR Any work involving AMC/ARC of 6Quad/OFC Cable
22 conditions · 12 needing a document upload
Firm has to submit authorization letter for uploading documents on IREPS in case he/she is not an authorized person.
PAN card Copy should be enclosed.
Please submit the copy of the registration certificate as applicable, GSTIN certificate should be enclosed.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderer should go through Annexure 1 & 2 of Tender Notice (attached in Tender Document)for list of documents required to be uploaded along with the offer.
Contractors are allowed to make payments against this tender towards tender document cost and earnest money only through only payment modes available ON IREPS portal LIKE net banking, debit card, credit card etc.Manual payments through Demand draft, Banker cheque, Deposit receipts, FDR etc. are not allowed.
Copy of PAN number and GSTIN number should be submitted.
No post tender correspondence for submission of additional documents shall be entertained after opening of the Technical & Commercial offers. Even suo-moto post tender letters of the tenders shall be treated as NULL & Void.
(i)Tenderers will examine various provisions of the Central Goods and Service Tax Act, 2017(CGST)/Integrated Goods and Service Tax Act,2017(IGST)/Union Territory Goods and Service Tax Act,2017(UTGST)/respective states State Goods and Service Tax Act(SGST) also, as notified by Central/States Govt. and as amended from time to time and applicable taxes before bidding. Tenderers will ensure that full benefit of Input Tax Credit(ITC) likely to be availed by them is duly considered while quoting rates. (ii) The successful tenderer who is liable to be registered under CGST/IGST/UTGST/SGST Act shall submit GSTIN along with other details required under CGST/IGST/UTGST/SGST Act to railway immediately after the award of contract, without which no payment shall be released to the contractor. The contractor shall be responsible for deposition of applicable GST to the concerned authority. (iii) In case the successful tenderer is not liable to be registered under CGST/IGST/UTGST/SGST Act, the railway shall deduct the applicable GST from his/their bills under reverse charge mechanism(RCM) and deposit the same to the concerned authority.
Sectional OFC maintenance in BBK-AYC, AY-ZBD, ABP-TD, PFM-AYC, DMW-DYP, ON- UCR Section and Distributed EI Stations including all LMC's for Maintenance of 24 Fiber OFC Cable Network, for the period of 03 year over Lucknow Division, Northern Railway.
106-Tele_Tender_24_25-26
106-Tele_Tender_24_25-26
Open
Works - General
36 Months
Lucknow, Uttar Pradesh
₹0
₹2.7 L
20 Feb 2026
30 Jan 2026
38 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 68,11,567.14 | ||
| — | 1050.00 | — | — | ||
| Rectification & repairing of new OFC Cut/Joints. This includes i. Finding of fault location. ii. Excavation/digging. iii. Splicing (24 Fiber OFC) & The joint Enclosure are to be supplied by Contractor (TVSE, R&M, Raychem or 3M Make only). OTDR Report shall be submitted by contractor jointly with railway site engineer. Excavation of jointing pit without damaging the fiber for fitting of joint chamber of 1.2 mtr dia, 60 Cm height and 50 mm thickness. Backfilling and ramming of the trench/pit after placing the joint closure and cable loop in the pit without causing any damage to the same and consolidation of soil as well as disposal of soil as per plan and as advised by Railway Representative. While excavation/ digging of pit without damaging the fiber. (Supply of joint chambers are not to be provided by contractor.) INSPECTION: RITES FOR SUPPLY PORTION" INSPECTION: RLY SITE ENGINEER FOR EXECUTION | — | — | — | 53,34,640.5 | |
| — | 189.00 | — | — | ||
| Rectification/Repairing of existing OFC joints this includes i. Opening/finding the existing joint location, ii. Re-splicing, supply and provision of thermo shrink sealing on cable entry points or as required. Note: All items required for repairing/rectification are to be supplied by the contractor. OTDR Report shall be submitted by contractor jointly with railway site engineer. INSPECTION: RLY SITE ENGINEER FOR EXECUTION | — | — | — | 7,91,486.64 | |
| — | 71400.00 | — | — | ||
| Additional transport charges for attending OFC fault/failures by contractor team for OFC repairing/rectification work in BBK-AYC, AY-ZBD, ABP-TD, PFM-AYC, DMW-DYP, ON-UCR Section and Distributed EI at 16 Station section & branch sections. From nominated place to failure site and the distance shall be measured based on track distance (RKM) INSPECTION: RLY SITE ENGINEER FOR EXECUTION | — | — | — | 6,85,440 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ACSGCC22-231to6.pdf
GCCAdvanceCorrectionSlipno7-10.pdf
GCC_April-2022_1.pdf
T-24Tender_1.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .