| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 CrAdmitted-Finance SHOP NO 2 RANJIT STUDIO FIRST FLOOR G BLOCK DADASAHEB PHALKE ROAD DADAR EAST MUMBAI MUMBAI MAHARASHTRA 400014 | MUMBAI | MAHARASHTRA | 400014 | +5.00% | ₹2.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.9 Cr+₹48.0 L (20.0%)Admitted-Finance | +26.00% | ₹2.9 Cr+₹48.0 L (20.0%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Techno-commercially disqualified. |
Tender Value
Refer Docs
EMD Value
₹7 L
Closing Date
31 Jan 2026, 10:30 amClosed
DGM (Contract Cell)
Contract Cell Dept., Admin. Bldg., RCF Thal Factory, Alibag, Raigad - 402208
CONTRACT FOR RENOVATION OF BALANCE OFFICES AT EAST WING ON FIRST FLOOR OF TECHNICAL BUILDING FOR AMMONIA AND UREA PLANT AT RCF THAL
2025_RCFL_890525_2
TH/CC/86281/25/D24-01(III)/432
Open Tender
Civil Works
Works
548 days
RCF Thal, Alibag
Please refer Tender documents.
16 documents required · 16 mandatory
₹0
₹7 L
Yes
17 Mar 2026
10 Jan 2026
31 Jan 2026
10 Jan 2026
31 Jan 2026
10 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | STABILITY CERTIFICATION OF BALANCE OFFICES AT EAST WING ON FIRST FLOOR OF TECHNICAL BUILDING AS PER RCF'S PROFORMA DUE TO CHANGE IN LOADING CONDITIONS & SUBMISSION OF AS BUILD DRAWINGS AFTER COMPLETION OF CONSTRUCTION, INCLLUDING NECESSARY FORTNIGHT SITE VISITS DURING EXECUTION. | 30,000 | LS | 1 | ₹30,000 |
| 1.02 | DESIGN AND PREPARATION OF PLAN/LAYOUT OF INTERIOR RENOVATION OF EAST WING FOR CIVIL INTERIOR WORKS INCLUDING CABIN SIZES, PARTITIONS, ELECTRICAL, NETWORKING LAYOUT IN CONSULTATION WITH RCF ENGINEER-IN-CHARGE WITH MAXIMUM THREE REVISIONS (DUE TO INCORPORATION OF RCF INPUTS/COMMENTS AFTER SUBMISSION OF PRELIMINARY DRAWINGS). | 90,000 | LS | 1 | ₹90,000 |
| 1.03 | DISMANTLING EXISTING FLOORING, SKIRTING, TILES, WALL CLADDED MARBLE,MEMBRANE ETC., INCLUDING DISPOSAL OF MATERIALS DEBRIS WITHIN RCF FACTORY PREMISES WITHIN A LEAD OF 3 KM, COMPLETE AS DIRECTED BY ENGINEER-IN-CHARGE. | 1,350 | SQM | 42 | ₹56,700 |
| 1.04 | REMOVING EXISTING LOOSE CEMENT/PLASTER OF ANY FINISH FROM THE WALL, COMPLETE INCLUDING PREPARING SURFACE, NECESSARY SCAFFOLDING, CLEANING ETC. COMPLETE INCLUDING DISPOSAL OF MATERIALS DEBRIS WITHIN RCF FACTORY PREMISES WITHIN A LEAD OF 3 KM.,FOR ALL LOADS INCLUDING ALL LIFTS INVOLVED COMPLETE AS DIRECTED BY ENGINEER-IN-CHARGE. | 300 | SQM | 32 | ₹9,600 |
| 1.05 | DEMOLISHING EXISTING BRICK / STONE MASONRY WORK IN CEMENT MORTAR (ANY PROPORTION AT ANY HEIGHTS / DEPTHS INCLUDING STACKING OF SERVICEABLE MATERIALS AND DISPOSAL OF UNSERVICEABLE WITHIN A LEAD OF 3 KM.,,FOR ALL LOADS INCLUDING ALL LIFTS INVOLVED COMPLETE AS DIRECTED BY ENGINEER-IN-CHARGE. | 120 | CUM | 335 | ₹40,200 |
| 1.06 | PROVIDING & CHIPPING GROOVES IN WALLS,CEILING OF REQUIRED SIZE & SHAPE FOR CONCEALING OF ELECTRICAL WIRING & MAKING GOOD THE DAMAGED PORTION WITH PMM/PUTTY AS PER EIC WITH NECESSARY SCAFFOLDING ETC. COMPLETE INCLUDING DISPOSAL OF DEBRIS ,FOR ALL LOADS INCLUDING ALL LIFTS INVOLVED AS DIRECTED BY EIC. | 600 | RMT | 150 | ₹90,000 |
| 1.07 | REMOVING EXISTING DOORS, WINDOWS WITH FRAMES AND SHUTTERS ETC. COMPLETE. (DISMANTLING, DEMOLISHING, CUTTING, BREAKING, REMOVING & CLEANING EXISTING ITEM CAREFULLY AND STACKING THE MATERIAL AT SITE OR AS INSTRUCTED INCLUDING CARTING AWAY DEBRIS FROM TECHNICAL BLDG. PREMISES WITH PRIOR APPROVAL & PERMISSIONS OF RCF. THE DEMOLISHED / STACKED MATERIAL SHALL BE PROPERTY OF THE CONTRACTOR & SHALL BE RESPONSIBILITY TO TAKE IT OUTSIDE RCF PREMISES). | 100 | NOS. | 112 | ₹11,200 |
| 1.08 | REMOVING EXISTING FALSE CEILING WITH FRAMING ETC. COMPLETE. (DISMANTLING, DEMOLISHING, CUTTING, BREAKING, REMOVING & CLEANING EXISTING ITEM CAREFULLY AND STACKING THE MATERIAL AT SITE OR AS INSTRUCTED INCLUDING CARTING AWAY DEBRIS FROM TECHNICAL BLDG. PREMISES WITH PRIOR APPROVAL & PERMISSIONS OF RCF. THE DEMOLISHED / STACKED MATERIAL SHALL BE PROPERTY OF THE CONTRACTOR & SHALL BE RESPOSIBILITY TO TAKE IT OUTSIDE RCF PREMISES). | 40 | SQM | 32 | ₹1,280 |
| 1.09 | REMOVING EXISTING ALUMINUM/WOODEN PARTITIONS WITH FRAMING ETC. COMPLETE. (DISMANTLING, DEMOLISHING, CUTTING, BREAKING, REMOVING & CLEANING EXISTING ITEM CAREFULLY AND STACKING THE MATERIAL AT SITE OR AS INSTRUCTED INCLUDING CARTING AWAY DEBRIS FROM TECHNICAL. BLDG. PREMISES WITH PRIOR APPROVAL & PERMISSIONS OF RCF.) | 270 | SQM | 40 | ₹10,800 |
| 1.1 | PROVIDING LIGHT WEIGHT AUTOCLAVED CONCRETE BLOCK MASONRY OF APPROVED BLOCK SIZE USING PREMIXED AND READY TO USE COMPATIBLE MORTAR AS APPROVED BY EIC. | 20 | CUM | 7,765 | ₹1,55,300 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.30 MB
BOQ_939050.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .