| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC | ₹4.4 L | L1 | Accepted-AOC L1 Accept |
| 2 | L2₹4.9 LRejected-Finance | ₹4.9 L | L2 | Rejected-Finance L2 Reject |
| Sl No | Description | Qty | Unit | V RAJA L1 | P MANIVANNAN L2 |
|---|---|---|---|---|---|
| 1.00Strengthening Of Uppuviduthi - Muthoorani Road in Madathikkadu Panchayat Km 0/0-0/175 | |||||
| 2.00 | Earth work excavation from borrow pits for filling in all classes of soil as per SS 20A, laying compacting, in layers not more than required dry density at 100% compaction as per standard specification . | 15.75 | Cu.m | 140 ₹2,205 | 150.3 ₹2,367.23 |
| 3.00 | Picking the existing BT surface 50mm-100mm thick including cost conveyance and all labour charges for picking hand packing leveling and consolidation by power roller rolling including all labour charges and all other insidental charges etc., com | 175 | sqm | 23.36 ₹4,088 | 24.36 ₹4,263 |
| 4.00 | Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.21 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm | 39.38 | Cu.m | 3,632.59 ₹1.4 L | 3,632.59 ₹1.4 L |
| 5.00 | Applying TACK COAT over Primed WBM surface at 4Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete | 525 | sqm | 69.45 ₹36,461.25 | 69.45 ₹36,461.25 |
| 6.00 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 13.432Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. | 525 | sqm | 332.73 ₹1.7 L | 400.3 ₹2.1 L |
| 7.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | 11.81 | Cu.m | 999 ₹11,798.19 | 1,000 ₹11,810 |
| 8.00 | Provision for Name Board Charges | 1 | Each | 4,500 ₹4,500 | 5,500 ₹5,500 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 67,822 ₹67,822 | 74,450 ₹74,450 |
Tender Value
₹4.5 L
EMD Value
₹4,500
Closing Date
24 Feb 2026, 3:00 pmClosed
Block Development Office(BP)Peravurani at Avanam
Block Development Office(BP)Peravurani at Avanam
Strengthening of Uppuviduthi Muthoorani Road in Madathikkadu Panchayat Km 0/0-0/175
2026_RDTN_660681_1
1392/2025/A2
Open Tender
Civil Works
Block Development Office(BP)Peravurani at Avanam
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹4,500
Yes
25 Feb 2026
18 Feb 2026
24 Feb 2026
18 Feb 2026
24 Feb 2026
18 Feb 2026
Strengthening Of Uppuviduthi - Muthoorani Road in Madathikkadu Panchayat Km 0/0-0/175
Earth work excavation from borrow pits for filling in all classes of soil as per SS 20A, laying compacting, in layers not more than required dry density at 100% compaction as per standard specification .
Picking the existing BT surface 50mm-100mm thick including cost conveyance and all labour charges for picking hand packing leveling and consolidation by power roller rolling including all labour charges and all other insidental charges etc., com
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.21 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
Applying TACK COAT over Primed WBM surface at 4Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 13.432Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
Madathitech.pdf
Tender Documents • 0.42 MB
MadaPrice.pdf
Tender Documents • 0.33 MB
BOQ_792702.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid