Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹90.0 LAccepted-AOC BIJOYNAGAR PALASHBARI KAMRUP ASSAM | L1 | Accepted-AOC PROPER | |
| 2 | L2₹90.0 L+₹0.01 (<0.01%)Rejected-AOC | L2 | Rejected-AOC Not Qualified for AOC | |
| 3 | L3₹90.0 L+₹500.30 (<0.01%)Rejected-AOC | L3 | Rejected-AOC Not Qualified for AOC | |
| 4 | Not Admitted-Fee/PreQual/Technical GOROIMARI BAZAR TUKRAPARA CHHAYGAON KAMRUP R ASSAM | CHHAYGAON | KAMRUP R | ASSAM | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical KAMALPUR P O BAIHATA P S KAMALPUR DIST KAMRUP | KAMRUP | ASSAM | 781030 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹100.0 L
EMD Value
₹2.0 L
Closing Date
12 Jan 2021, 2:00 pmClosed
Chief Engineer,W.R.Deptt
O/O Chief Engineer Water Resources Department Chandmari
Immediate measures to restore L/B embankment of river Barsaliua in between Dahara to Jayantipur area under SDRF for the year 2020-21.
2021_DoWR_19901_1
GHY.WEST/2020-21/SDRF/IV
Open Tender
Civil Works
Works
60 days
GUWAHATI WEST
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹2.0 L
Yes
20 May 2021
2 Jan 2021
13 Jan 2021
2 Jan 2021
12 Jan 2021
6 Jan 2021
Amount
Cutting bamboo , uprooting roots & stumps including removing them from the site of work, etc. complete as directed.
Uprooting bamboo clumps where bamboo already removed including removing stumps to a distance as directed.
Cutting banana trees, uprooting roots & stumps including removing them from the site of work, etc. complete as directed.
Earth work in embankment by truck carriage in ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding 22cm. thick including ploughing or roughening or benching the seats, removing all debries, breaking clods up to 2.5cm cube, dressing as per design section including payment of forest royalty if any, etc. complete as directed. (10% deduction will be made from the section measured quantities of the completed and compacted on account of shrinkage). For initial lead beyond ½ Km and up to 4.00 Km and for all lifts.
JAMIR KHAN
MUKUL GOSWAMI
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .