Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.4 LAccepted-AOC | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹25.3 L+₹60,200 (2.44%)Rejected-AOC NO 94 OLD NO 100 19TH MAIN ROAD 1ST N BLOCK RAJAJI NAGAR BANGALORE 560 010 | BANGALORE | BANGALORE | KARNATAKA | 560010 | L2 | Rejected-AOC NOT LOWEST | |
| 3 | Rejected-Technical | - | Rejected-Technical doesnt meet eligibility criteria | |
| 4 | Rejected-Technical NO 390 MARGONADANAHALLI RKM LAYOUT NEAR OCEANUS TRANQUIL APARTMENT KR PURAM BENGALURU 560036 | BENGALURU URBAN | KARNATAKA | 560036 | - | Rejected-Technical doesnt meet eligibility criteria | |
| 5 | Rejected-Technical | - | Rejected-Technical doesnt meet eligibility criteria |
Tender Value
₹22.5 L
EMD Value
₹45,000
Closing Date
3 Nov 2023, 6:00 pmClosed
Col AK Tripathi CWE
HQ CWE ARMY BANGALORE 101 Dickenson Road Bangalore 560042
COMPREHENSIVE MAINT AND OPERATION OF LIFT AND FIRE FIGHTING SYSTEM AT UNDER GE (NORTH) BANGALORE
2023_MES_623124_1
86184/E8
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
HQ CWE ARMY BANGALORE
AS PER TENDER
8 documents required · 8 mandatory
₹500
Yes
GE (NORTH) BANGALORE
₹45,000
Yes
14 Dec 2023
13 Oct 2023
10 Nov 2023
13 Oct 2023
3 Nov 2023
27 Oct 2023
13 Oct 2023 - 20 Oct 2023
Amount
Comprehensive maintenance of 8 passenger lift (G+5) @ 0.5m/s manufactured by OMEGA Elevators bearing No 802047, regularly and systematically including inspection adjustment, repair of machine motor and controller parts including worms, bearing gears, brake magnet coils or break motors, break shoes, brushes, windings, commutators, rotating elements, contacts, coil resistance for operating and motor circuits, magnets frames and other mechanical parts, Door shoes and repair / replacement of push button,electric wiring circuits ,wire rope & reply for existing capacity of batteries etc as per the direction of Engineer- in charge and as per the written direction of Govt lift inspector and lubrication as required including emergency call back services and over time examination etc complete all as specified and as directed. Location : ADMC Ph-I
Comprehensive maintenance of Drum weighter Lift (G+2) @ 1m/s manufactured by Heera Engg co Ltd bearing No- 7736 (Phase-I) regularly and systematically including inspection adjustment, repair of machine motor and controller parts including worms, bearing gears, brake magnet coils or break motors, break shoes, brushes, windings, commutators, rotating elements, contacts, coil resistance for operating and motor circuits, magnets frames and other mechanical parts, Door shoes existing capacity of batteries etc as per the direction of Engineer- in charge and as per the written direction of Govt lift inspector and lubrication as required including emergency call back services and over time examination etc complete all as specified and as directed. Location : ADMC- Ph -I
Comprehensive maintenance of 8 passenger lift (G+6) @ 1 m/s manufactured by Supriya lift bearing No - 20010 (Phase-II) regularly and systematically including inspection adjustment, repair of machine motor and controller parts including worms, bearing gears, brake magnet coils or break motors, break shoes, brushes, windings, commutators, rotating elements, contacts, coil resistance for operating and motor circuits, magnets frames and other mechanical parts, Door shoes existing capacity of batteries etc as per the direction of Engineer- in charge and as per the written direction of Govt lift inspector and lubrication as required including emergency call back services and over time examination etc complete all as specified and as directed. Location - ADMC Ph-II
Comprehensive maintenance of 8 passenger lift (G+6) @ 1.5m/s manufactured by Supriya lift bearing No - 20011 (Phase-II) regularly and systematically including inspection adjustment, repair of machine motor and controller parts including worms, bearing gears, brake magnet coils or break motors, break shoes, brushes, windings, commutators, rotating elements, contacts, coil resistance for operating and motor circuits, magnets frames and other mechanical parts, Door shoes existing capacity of batteries etc as per the direction of Engineer- in charge and as per the written direction of Govt lift inspector and lubrication as required including emergency call back services and over time examination etc complete all as specified and as directed. Location - ADMC Ph-II
Comprehensive maintenance of 13 passenger lift (G+5) @ 1m/s manufactured by ESCON Elevators bearing No 16010571, regularly and systematically including inspection adjustment, repair of machine motor and controller parts including worms, bearing gears, brake magnet coils or break motors, break shoes, brushes, windings, commutators, rotating elements, contacts, coil resistance for operating and motor circuits, magnets frames and other mechanical parts, Door shoes existing capacity of batteries etc as per the direction of Engineer- in charge and as per the written direction of Govt lift inspector and lubrication as required including emergency call back services and over time examination etc complete all as specified and as directed. Location : Chowdhary Line, Block - A.
Comprehensive maintenance of 13 passenger lift (G+5) @ 1m/s manufactured by ESCON Elevators bearing No 16010562, regularly and systematically including inspection adjustment, repair of machine motor and controller parts including worms, bearing gears, brake magnet coils or break motors, break shoes, brushes, windings, commutators, rotating elements, contacts, coil resistance for operating and motor circuits, magnets frames and other mechanical parts, Door shoes existing capacity of batteries etc as per the direction of Engineer- in charge and as per the written direction of Govt lift inspector and lubrication as required including emergency call back services and over time examination etc complete all as specified and as directed. Location: Chowdhary Line, Block - B.
Comprehensive maintenance of 13 passenger lift (G+5) @ 1m/s manufactured by ESCON Elevators bearing No 16010575, regularly and systematically including inspection adjustment, repair of machine motor and controller parts including worms, bearing gears, brake magnet coils or break motors, break shoes, brushes, windings, commutators, rotating elements, contacts, coil resistance for operating and motor circuits, magnets frames and other mechanical parts, Door shoes existing capacity of batteries etc as per the direction of Engineer- in charge and as per the written direction of Govt lift inspector and lubrication as required including emergency call back services and over time examination etc complete all as specified and as directed. Location : Chowdhary Line, Block - C.
Comprehensive maintenance of 13 passenger lift (G+5) @ 01m/s manufactured by ESCON Elevators bearing No 17110462, regularly and systematically including inspection adjustment, repair of machine motor and controller parts including worms, bearing gears, brake magnet coils or break motors, break shoes, brushes, windings, commutators, rotating elements, contacts, coil resistance for operating and motor circuits, magnets frames and other mechanical parts, Door shoes existing capacity of batteries etc as per the direction of Engineer- in charge and as per the written direction of Govt lift inspector and lubrication as required including emergency call back services and over time examination etc complete all as specified and as directed. Location : RC Line, Block P-80
Comprehensive maintenance of 13 passenger lift (G+5) @ 1m/s manufactured by ESCON Elevators bearing No 16010570, regularly and systematically including inspection adjustment, repair of machine motor and controller parts including worms, bearing gears, brake magnet coils or break motors, break shoes, brushes, windings, commutators, rotating elements, contacts, coil resistance for operating and motor circuits, magnets frames and other mechanical parts, Door shoes existing capacity of batteries etc as per the direction of Engineer- in charge and as per the written direction of Govt lift inspector and lubrication as required including emergency call back services and over time examination etc complete all as specified and as directed. Location : RC Line, Block P-81
Comprehensive maintenance of 13 passenger lift (G+5) @ 01m/s manufactured by ESCON Elevators bearing No 16010573, regularly and systematically including inspection adjustment, repair of machine motor and controller parts including worms, bearing gears, brake magnet coils or break motors, break shoes, brushes, windings, commutators, rotating elements, contacts, coil resistance for operating and motor circuits, magnets frames and other mechanical parts, Door shoes existing capacity of batteries etc as per the direction of Engineer- in charge and as per the written direction of Govt lift inspector and lubrication as required including emergency call back services and over time examination etc complete all as specified and as directed. Location : RC Line, Block P-82
Comprehensive maintenance of 13 passenger lift (G+5) @ 01m/s manufactured by ESCON Elevators bearing No 17110461, regularly and systematically including inspection adjustment, repair of machine motor and controller parts including worms, bearing gears, brake magnet coils or break motors, break shoes, brushes, windings, commutators, rotating elements, contacts, coil resistance for operating and motor circuits, magnets frames and other mechanical parts, Door shoes existing capacity of batteries etc as per the direction of Engineer- in charge and as per the written direction of Govt lift inspector and lubrication as required including emergency call back services and over time examination etc complete all as specified and as directed. Location : RC Line, Block P-83
Comprehensive Maintenance of single full collective control passenger elevator (G+5) @ 02m/s equipment bearing Nos A-890240 (OTIS make) regularly and systematically including inspection adjustment, repair of machine motor and controller parts including worms, bearing gears, brake magnet coils or break motors, break shoes, brushes, windings, commutators, rotating elements, contacts, coil resistance for operating and motor circuits, magnets frames and other mechanical parts, Door shoes existing capacity of batteries etc as per the direction of Engineer- in charge and as per the written direction of Govt lift inspector and lubrication as required including emergency call back services and over time examination etc complete all as specified and as directed. Location: - FMME Bldg No - 155.
Comprehensive Maintenance of single full collective control passenger elevator (G+5) @ 02m/s equipment bearing Nos A-89069 (OTIS make)regularly and systematically including inspection adjustment, repair of machine motor and controller parts including worms, bearing gears, brake magnet coils or break motors, break shoes, brushes, windings, commutators, rotating elements, contacts, coil resistance for operating and motor circuits, magnets frames and other mechanical parts, Door shoes and repair / replacement of push button,electric wiring circuits,wire rope & reply for existing capacity of batteries etc as per the direction of Engineer- in charge and as per the written direction of Govt lift inspector and lubrication as required including emergency call back services and over time examination etc complete all as specified and as directed. Location :- FMME Bldg No - 156.
Note for item no 1 to 13 :- (i) The Comprehensive maintenance shall be done through OEM of the lift or from their authorized agency. (ii) The contractor shall enter into an MOU with OEM or their authorized agency for maintenance of lifts. The above comprehensive AMC certificate shall be provided by the contractor in favour of GE before commencement of work, after acceptance of CA. (iii) All the parts required shall be genuine / original from OEM only and Approved by Engg-in-Charge. (iv) All the stainless steel parts such as Lift car enclosure, opening doors, jamps, cills etc shall be thoroughly cleaned to remove rust, stains etc with suitable solution. The contractor shall also clean and properly maintain machine room, machineries and lift well as directed by the Eng-in-Charge. The rate quoted deemed to be included in the item. (v) The rates quoted for the above items shall be included for replacement of minor spares, consumables, accessories like fan, light / cabin light, emergency alarm and other connected items becoming unserviceable during the period and nothing extra shall be allowed. (vi) Major spare parts if any found defective during the period of contract to be replaced as catered hereinafter and shall be measured and paid separately under relevant items.
(vii) The contractor is responsible to carryout periodical routine checkup through OEM ( once in a month ) or as per the direction of Eng-in-Charge to ensure the serviceability and proper functioning of lift in all respect.(viii) If any water collected in the lift well shall be drain out with suitable capacity of pump set without any extra cost (ix) The contractor is responsible for repair/replacement of LED spot light /light fitting/fan/exhaust fan/call bell/limit switch, main cable and branch cable without any extra cost etc. (x) The contractor is responsible for internal painting of lift cabin once in a contract period without any extra cost as per the direction of Engr-in-charge. (xi) The contractor is also responsible for deployed his lift mech daily to report Engr-in-Charge at 0830hr morning without fail for routing check of each lift and handover the daily report of each lift for countersignature. If the lift mech not report to the Engr-in-Charge then necessary recovery will be carried out i.e Rs. 1000/day as a penalty of each lift up to 3 days after that Rs.1500/day for next 3 days and after that Rs. 2500/day will be carried out for each lift. (xii) If the contractor not attend /resolve the logged/given complain within 24 hours then Rs. 1000/day as a penalty will be carried out up to 3 days after that Rs. 1500/day for next 3 days and after that Rs. 2500/day will be carried out for each lift.
Carrying out the inspection of lift by Govt lift inspector for worthiness certificate all as specified and as directed.
Supply and Fixing in Replacement of existing control system to CANBAS Integrated Controller based on collective control panel for trouble maximum efficiency and longer life to the lift of 08/13 Passenger (G+6) complete all as specified and as directed. Make- Escon or any other suitable make for supporting existing lift.
Supply and Fixing in Replacement of existing control system to CANBAS Integrated Controller based on collective control panel for trouble maximum efficiency and longer life to the lift of 08/13 Passenger (G+5) complete all as specified and as directed. Make- Escon or any other suitable make for supporting existing lift.
Supply and Fixing in replacement of Car Operating Panel with all accessories suitable for 08/13 Passenger lift complete all as specified and as directed. Make- Supriya/OTIS/Escon or any other suitable make for supporting existing lift.
Supply and Fixing in replacement of Door Drive complete all accessories suitable for 08/13 Passenger Capacity lift installed complete all as specified and as directed.
Supply and Fixing in Replacement of Automatic Rescue Device (ARD) Control complete system unit with all accessories including SMF batteries for 08/13 Passenger Capacity lift complete all as specified and as directed.
Supply and Fixing in replacement of Shaft wiring with all accessories suitable for 08/13 Passenger Capacity lift complete all as specified and as directed.
Supply and Fixing in replacement Door Gear Mechanism with all accessories suitable for 08/13 Passenger Capacity lift complete all as specified and as directed.
Supply and Fixing in replacement of Full Curtain Infra red door Sensor Complete with all accessories suitable for 08/13 Passenger lift complete all as specified and as directed
Supply and Fixing in replacement of Hose Reel Drum 30m complete all as specified and as directed. Note for Sl item No 18 to 23 :- Parts to be replaced shall be of suitable make of existing lift part or its equivalent suitable make to ensure funtionality of the lift.
Man Elevators Company Pvt Ltd
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .