Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 CrAccepted-AOC | ₹4.9 Cr | L1 | Accepted-AOC 1ST LOWEST BIDDER |
| 2 | L2₹5.0 Cr+₹9.0 L (1.85%)Rejected-Finance | ₹5.0 Cr+₹9.0 L (1.85%) | L2 | Rejected-Finance Being 2nd lowest bidder |
| 3 | L3₹5.5 Cr+₹66.2 L (13.6%)Rejected-Finance NURSERY SCHOOL 1 SECTOR 33 SUNCITY KURUKSHETRA ROAD KAITHAL 136027 HARYANA | KAITHAL | KAITHAL | HARYANA | 136027 | ₹5.5 Cr+₹66.2 L (13.6%) | L3 | Rejected-Finance Being 3rd lowest bidder |
| 4 | L4₹5.6 Cr+₹67.8 L (13.9%)Rejected-Finance | ₹5.6 Cr+₹67.8 L (13.9%) | L4 | Rejected-Finance Being 4th lowest bidder |
| 5 | L5₹5.7 Cr+₹77.9 L (16.0%)Rejected-Finance | ₹5.7 Cr+₹77.9 L (16.0%) | L5 | Rejected-Finance Being 5th lowest bidder |
| Sl No | Description | Qty | Unit | M/s VINOD KUMAR SHARMA L5 | Jai Ambey Construction Co. L1 | M/S GODARA CONSTRUCTION CO. L3 | P R Constructions L4 | M/S PRASHANT DUBEY CONTRACTOR L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00SCHEDULE `A' PART - I (Building Works) is not prepriced by MES and prepriced rates indicates 0.0 under column 6 signified this fact only. | ||||||||
| 1.01 | Construction of Pump House building with permanent specifications complete all as specified and shown on drawings. | 1 | Lump sum | 17,80,000 ₹17,80,000 | 13,50,000 ₹13,50,000 Lowest | 14,31,000 ₹14,31,000 | 17,69,619 ₹17,69,619 | 18,40,000 ₹18,40,000 |
| 1.02 | Construction of lift well with pump room of internal dia 3.00 m, foundation depth 3.70 m below ground level complete all as specified and shown on drawings. | 1 | Each Job | 14,18,000 ₹14,18,000 | 5,40,000 ₹5,40,000 | 13,11,000 ₹13,11,000 | 13,99,149 ₹13,99,149 | 3,68,000 ₹3,68,000 Lowest |
| 1.03 | Construction of lift well with pump roomof internal dia 3.00 m, foundation depth 3.85 m below ground level complete all as specified and shown on drawings. | 1 | Each Job | 16,26,000 ₹16,26,000 | 6,30,000 ₹6,30,000 | 13,65,000 ₹13,65,000 | 16,09,239 ₹16,09,239 | 3,68,000 ₹3,68,000 Lowest |
| 1.04 | Construction of lift well with pump room of internal dia 3.00 m, foundation depth 3.90 m below ground level complete all as specified and shown on drawings. | 1 | Each Job | 17,34,000 ₹17,34,000 | 7,20,000 ₹7,20,000 | 13,85,000 ₹13,85,000 | 16,99,149 ₹16,99,149 | 3,68,000 ₹3,68,000 Lowest |
| 1.05 | Construction of lift well with pump room of internal dia 5.00 m, foundation depth 4.50 m below ground level complete all as specified and shown on drawings. | 1 | Each Job | 22,12,000 ₹22,12,000 | 13,50,000 ₹13,50,000 | 26,61,000 ₹26,61,000 | 21,79,119 ₹21,79,119 | 7,36,000 ₹7,36,000 Lowest |
| 1.06 | Construction of lift well with pump room of internal dia 5.25 m, foundation depth 4.90 m below ground level complete all as specified and shown on drawings. | 1 | Each Job | 23,88,000 ₹23,88,000 | 14,49,000 ₹14,49,000 | 28,93,000 ₹28,93,000 | 23,89,229 ₹23,89,229 | 8,28,000 ₹8,28,000 Lowest |
| 1.07 | Construction of Sumpwell of internal dia 5.50 m, overall depth 5.50 m complete all as specified and shown on drawings. | 1 | Each Job | 20,81,000 ₹20,81,000 | 17,10,000 ₹17,10,000 | 26,81,000 ₹26,81,000 | 20,79,339 ₹20,79,339 | 9,66,000 ₹9,66,000 Lowest |
| 2.00NOTE: Schedule ‘A’ Part II to XI under Ser No 2.01 to 2.10 are Prepriced by MES. | ||||||||
| 2.01 | Lump sum price worked out by the Contractor for “SITE CLEARANCE, EXCAVATION AND EARTH WORK” as listed in Schedule ‘A’ Part II | 1 | Lump sum | 60,00,000 ₹60,00,000 | 45,00,000 ₹45,00,000 | 37,39,424.66 ₹37,39,424.66 Lowest | 51,88,619 ₹51,88,619 | 64,30,000 ₹64,30,000 |
Tender Value
₹5.1 Cr
EMD Value
₹5.8 L
Closing Date
17 Jul 2026, 6:00 pmClosed
CE (AF) WAC PALAM
HQ CE (AF) WAC PALAM DELHI CANTT-10
PROVN OF SEWAGE LINE AT AF STN SIRSA
2026_MES_762827_1
CEWAC/SIR/T-06/2026-27
Open Tender
Civil Works
Lump-sum
540 days
GE (AF) SIRSA
Please refer Tender documents.
9 documents required · 9 mandatory
₹3,000
GE (AF) SIRSA
₹5.8 L
Yes
31 Aug 2026
9 Jun 2026
20 Jul 2026
9 Jun 2026
17 Jul 2026
10 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SCHEDULE `A' PART - I (Building Works) is not prepriced by MES and prepriced rates indicates 0.0 under column 6 signified this fact only. | |||||
| 1.01 | Construction of Pump House building with permanent specifications complete all as specified and shown on drawings. | 1 | Lump sum | - | - |
| 1.02 | Construction of liftwell of internal dia 3.00 m, foundation depth 3.70 m below ground level complete all as specified and shown on drawings. | 1 | Each Job | - | - |
| 1.03 | Construction of liftwell of internal dia 3.00 m, foundation depth 3.85 m below ground level complete all as specified and shown on drawings. | 1 | Each Job | - | - |
| 1.04 | Construction of liftwell of internal dia 3.00 m, foundation depth 3.90 m below ground level complete all as specified and shown on drawings. | 1 | Each Job | - | - |
| 1.05 | Construction of liftwell of internal dia 5.00 m, foundation depth 4.50 m below ground level complete all as specified and shown on drawings. | 1 | Each Job | - | - |
| 1.06 | Construction of liftwell of internal dia 5.25 m, foundation depth 4.90 m below ground level complete all as specified and shown on drawings. | 1 | Each Job | - | - |
| 1.07 | Construction of Sumpwell of internal dia 5.50 m, overall depth 5.50 m complete all as specified and shown on drawings. | 1 | Each Job | - | - |
| 2.01 | Lump sum price worked out by the Contractor for “SITE CLEARANCE, EXCAVATION AND EARTH WORK” as listed in Schedule ‘A’ Part II | 1 | Lump sum | 69,83,730.25 | ₹69,83,730.25 |
| - | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION WORKS" as listed in Schedule ‘A’ Part III | 1 | Lump sum | 24,447.47 | ₹24,447.47 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tender.pdf
Tender Documents • 8.76 MB
BOQ_863250.xls
BOQ • 0.59 MB
drgs.pdf
Additional Documents • 6.13 MB
doc03327920260710105407.pdf
PDF • 0.52 MB
Corrigendum01.pdf
PDF • 12.86 MB
Coveringletter.pdf
PDF • 0.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .