Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹10.1 L+₹1.0 L (11.5%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹10.3 L+₹1.2 L (13.0%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | Rejected-Technical R O MURADNAGAR DISTT GHAZIBABAD | GHAZIPUR | UTTAR PRADESH | 232325 | - | Rejected-Technical REJECT |
| Sl No | Description | Qty | Unit | KALUVA L1 | Jagdish Parsad Sharma L3 | M/s Kailash Chand Sharma L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in silt clearance including lift up to 1.5 M and lead upto 30 M including ramming and dressing by manual labour . the earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charg. in Dys. and Minors. Quantity in coloumn number 10. | 15,000 | Cum | 38.1 ₹5,71,500 | 37 ₹5,55,000 | 36.66 ₹5,49,900 Lowest |
| 2.00 | Earth work in silt clearance including lift up to 1.5 M and lead upto 1.0 0km including the earth from clearance to be disposed off 1.00KM away from site or as directed by Engineer-in-charg. in Dys. Quantity in coloumn number 11. | 2,160 | Cum | 120 ₹2,59,200 Lowest | 178 ₹3,84,480 | 176 ₹3,80,160 |
| 3.00 | Scrapping Internal Section of exisiting channel i.e. Bad and Slope | 19,600 | Sqm | 4 ₹78,400 Lowest | 4.5 ₹88,200 | 4.25 ₹83,300 |
Tender Value
₹10.8 L
EMD Value
₹21,600
Closing Date
6 Oct 2026, 4:00 pmClosed
EE BGGC BSR
EE BGGC BSR
SILT CLEARANCE INTERNAL SECTION OF LEFT DADUPUR DY FROM KM 18.000 TO KM 37.600
2026_UPIDC_1188144_35
04/EE/2026-27
Open Tender
Civil Works
Item Rate
30 days
Bulandshahr
Please refer Tender documents.
2 documents required · 2 mandatory
₹266
₹21,600
9 Oct 2026
1 Oct 2026
6 Oct 2026
1 Oct 2026
6 Oct 2026
1 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in silt clearance including lift up to 1.5 M and lead upto 30 M including ramming and dressing by manual labour . the earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charg. in Dys. and Minors. Quantity in coloumn number 10. | 15,000 | Cum | - | - |
| 2 | Earth work in silt clearance including lift up to 1.5 M and lead upto 1.0 0km including the earth from clearance to be disposed off 1.00KM away from site or as directed by Engineer-in-charg. in Dys. Quantity in coloumn number 11. | 2,160 | Cum | - | - |
| 3 | Scrapping Internal Section of exisiting channel i.e. Bad and Slope | 19,600 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.90 MB
BOQ_2248899.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .