| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹8.7 LAccepted-AOC MAHUAR KIRAWALI AGRA | AGRA | AGRA | UTTAR PRADESH | L-1 | Accepted-AOC Accept | |
| 2 | L-2₹10.0 L+₹1.3 L (14.5%)Rejected-AOC 00 KHRAUTI RAMPUR BASTI BASTI UTTAR PRADESH 272124 | BASTI | UTTAR PRADESH | 272124 | L-2 | Rejected-AOC Reject | |
| 3 | L-3₹10.0 L+₹1.3 L (14.6%)Rejected-AOC | L-3 | Rejected-AOC Reject |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
7 Jun 2024, 1:00 pmClosed
SE EDC-1 AGRA
B-690 Kamla Nagar Agra
For the Work of construction of 11KV/LT lines, 11/.04 KV S/s and other associated work for releasing new connection/shifting of line against packages, to be passed from time to time in Deposit scheme under EDD-4 KIRAOLI.
2024_DVVNL_925711_1
13/EDCA/2024-25
Open Tender
Electrical Works
Piece-work
180 days
B-690 Kamla Nagar Agra
As Per Tender Documents
2 documents required · 2 mandatory
₹1,000
DVVNL
₹10,000
1 Feb 2025
29 May 2024
7 Jun 2024
29 May 2024
7 Jun 2024
29 May 2024
Carriage of following from Store Center Agra to site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)
ST pole 9/11/13 Mtr. Long
PCC Pole 8.5 Mtr. Long.
16/25 KVA T/F
63 KVA T/F
100 KVA T/F
Metering Cubical
LT PVC Cable 3.5x70/120/185/240 sqmm
11 KV 3x35/70/3x120 sqmm cable
Line material viz. Aerial bunch conductor/Weasal conductor/Dog, G.I. earth wire, cross arm, angle, channel, insulators, clamps and other line material, if required
Cutting of kharanja/mettalic road/concrete portion while digging pit for erection of PCC/STP poles, stays rod and giving the exact shape after exicution work as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work.
Erection and grouting of single pole on 9/11/13 Mtr. long ST poles including fixing of accessories for HT/LT line as per RESPO manual and as per direction of Engineer Incharge labour, T &P and carrier, groputing material etc. required for proper completion of work shall be provided by the contractor.
Erection and grouting of double pole on 9/11/13 Mtr. long ST poles including fixing of accessories for double pole S/s as per RESPO manual and as per direction of Engineer Incharge labour, T &P and carrier etc. required for proper completion of work.
Erection and grouting of single pole on 8.5 Mtr. long PCC poles including fixing of accessories for HT/LT line as per RESPO manual and as per direction of Engineer Incharge labour, T &P and carrier etc. required for proper completion of work.
Erection and grouting of double pole on 8.5 Mtr. long PCC poles including fixing of accessories for double pole S/s as per RESPO manual and as per direction of Engineer Incharge labour, T &P and carrier etc. required for proper completion of work.
Erection and grouting of stays as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
Distmentaling of 8.5 Mtr. long PCC Single pole by digging of pits and opening of all l 11KV/LT accessories & its carriage with material from site to concerning JE Store with the work of loading and unloading at both ends. (0-40 KM)
Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
Distmentaling of 8.5 Mtr. long PCC Double pole by digging of pits and opening of all l 11KV/LT accessories & its carriage with material from site to concerning JE Store with the work of loadig and unloading at both ends. (0-40 KM)
Installation of 63 KVA T/F instead of 16/25 KVA T/F on existing double pole and making HT/:LT connection.
Installation of 100 KVA T/F instead of 63 KVA T/F on existing double pole and making HT/:LT connection.
Removal of following damaged conductor from the line with its bundling and stacking with the work of carriage from site to concerning JE Store with the work of loading and unloading at both ends. (0-40 KM)
ACSR Weasel Conductor
50/95/120 sqmm Areal Bunch Conductor
Laying sagging stringing and binding and jumpering following conductor on 11 KV LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work.
ACSR Weasel Conductor
50/95/120 sqmm Areal Bunch Conductor
Mounting of following T/F on existing double pole/single pole & making HT/LT connection a) 16/25 KVA T/F.
Mounting of following T/F on existing double pole/single pole & making HT/LT connection c) 63 KVA T/F.
Mounting of following T/F on existing double pole/single pole & making HT/LT connection D) 100 KVA T/F.
Laying of 11 KV 3x35/70/120/185 sqmm XLPE cable in trench with making loop (at a distance of approx. 4 mtr.) laying of bricks (18 nos. in one meter), filling of sand in trench then laying earth and its levelling and rammuring etc., complete work as RESSPO norms.
Laying and dressing of 11 KV under ground cable of size 3x 35/70/120 sq mm in the trench 450 mm fine sand cushion beneath and 150 mm fine sand cushion above the cable. The cable shall be duly protected by 1" class brick two on either side and third on top of the cables. Laid in series one after the other. The work includes supplying of fine sand & bricks refilling and ramming of the left out soil closing the trench and leveling Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cables laying work includes unroling cutting / megaring & sealing both ends of the cable.
Rmoval of 100 KVA T/F from existing double pole after opening HT/LT connections and their carriage to 132 KV Taj store agra including laodiing and unloading at both end.
Rmoval of 63 KVA T/F from existing double pole after opening HT/LT connections and their carriage to 132 KV Taj store agra including laodiing and unloading at both end.
Rmoval of 25 KVA T/F from existing double pole after opening HT/LT connections and their carriage to 132 KV Taj store agra including laodiing and unloading at both end.
Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer
Making HT 'T' off connection on existing mains labour, T &P and carrier etc. required for proper completion of work.
Installation of D.O. Fuse set on Double pole
Filling of 11 KV 3×35/70/120/185 sqmm outdoor/Indoor cable boxes and making connection as per direction of supervising engineer on double pole.
Fixing of LT dustribution boxes on already errected pole for giving supply to consumer by connecting consumer cables by using appropriated alumunium lugs tape N & B provided by conractor as per requirement.
Guarding of HT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work.
Installation of 11 KV Meter Piller Box & Making connection.
ABHISHEK ENTERPRISES (BID ID -4357608)
aashirvad contractor (BID ID -4356922)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .