| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹95.5 LAccepted-Finance MAKARDAH ROAD DASNAGAR OPP UNITED CLUB HOWRAH 711105 | HOWRAH | HOWRAH | WEST BENGAL | 711105 | L1 | Accepted-Finance 1st lowest | |
| 2 | L2₹1.0 Cr+₹6.0 L (6.30%)Rejected-Finance 1 JOYRAMPUR JALA ROAD MAIL 42C SARADAMA UPANIBESH BEHALA KOLKATA 700060 | KOLKATA | WEST BENGAL | 700060 | L2 | Rejected-Finance 2nd | |
| 3 | L3₹1.0 Cr+₹8.1 L (8.50%)Rejected-Finance SOVAGANJ ALIPURDUAR | L3 | Rejected-Finance 3rd |
Tender Value
₹95.5 L
EMD Value
₹1.9 L
Closing Date
13 Jan 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DG CIVIL
OFFICE DG CIVIL THE KOLKATA MUNICIPAL CORPORATION 5 S.N. BANERJEE ROAD KOLKATA 700013
IMPROVEMENT OF ROAD BY LAYING HOT-MIX AT MALIK PARA NEAR PRE. NO-66, 63/1, 62/4 IN WARD NO-142 NIT NO-KMC/D.G.(C )/BR-XVI/142/005/24-25
2025_KMC_973197_1
KMC/D.G.(C )/BR-XVI/142/005/24-25
Open Tender
CIVIL WORKS
Percentage
90 days
WARD NO-142
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.9 L
OFFICE OF DG CIVIL
28 Jan 2026
19 Dec 2025
15 Jan 2026
24 Dec 2025
13 Jan 2026
27 Dec 2025
26 Dec 2025
Supplying Eucalyptus-bullah piles at work site,including dressing and maiking one end pointed iii)150mm dia meter
Supplying Eucalyptus-bullah piles at work site,including dressing and maiking one end pointed i)100mm diameter
Cool tarring on wooden surfaces including cost of materials a)Double Coat
Labour for diving Sal_bullah/Eucalyptus bullah piles by monkey in sorts of soil including hoisting and placing piles in position ,protecting the pile head with iron ring and cutting and shapping heads before and after driving and including hire and labour for necessary driving appiances and all tackles. (iii)150 mm diameter
Labour for fitting and fixing 10 cm. to 13 cm. diameter Sal-bullah/Eucalyptus-bullah as ties and runners including necessary nails,bolts and nuts.
BUILDING WORKS (E) ROOFING, SHEET WALLING &WATERPROOF TREATMENT . A. ROOFING & SHEETWALLING 30. Walling or roofing fitted and fixed complete with cut drum sheets including the cost of drums, cost of cutting drums and flattening the sheets and cost of necessary nails and screws. (Cost of empty bitumen drums issued by the Deptt. will be recovered at Rs. 100.00 for each drum)
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 3. Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (c) (iv) With carried earth arranged by the contractor within a radius exceeding 5 km. but not exceeding 10 km. including cost of carried earth.
Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) For Construction of Sub Base by consolidating Brick Bats / Laterite (90 mm to 45 mm) ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.10 (ii) Page No.247 & page-222 sl. No-5 (f))
Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by consolidating Jhama metal / Laterite (63 mm to 45 mm) (Moorum replaced with course sand) ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.10(i) Page No.247 & page-222 sl. No- 1 & 5 (e))
Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) On Granular surfaces treated with primer. (Using Bitumen emulsion at the rate of 0.25 to 0.30 kg per sqm.) ( Ref :PWD (Rds & Brdgs)-2018, Page No.213 (Table No.3.3?1) & Page No. 251, It. No. 5.02, Table no.I-2 of pg-219, pg-220 Format-B, PWD(R&B) 2018, pg-228 item-1.03 (i), Pg-230,Table-I, It-4,)
Transportation and laying 40 mm thick hot asphaltum mixture from kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture) a) without paver finisher i) Day Time ( Ref :As per KMC Rates, taxes, fees & Charges for the year 2019-2020, As per present market Price, Rate appvd. By D.G.(Civil) Circular No-21 of 2016-17 dtd-25.10.16 vide resolution MIC meeting (Item no-M-29.22 dtd-21.09.16), Mpl. Secretary Circullar no-02 of 2018-19 dtd.04.04.2018 )
Sub Total
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.28 MB
BOQ_2368524.xls
BOQ • 0.27 MB
R.pdf
Additional Documents • 5.33 MB
T.pdf
Tender Documents • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .