| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.9 LAccepted-Finance | ₹2.9 L | 1 | Accepted-Finance Bidder quoted Less Then Estimate Value |
| 2 | 2₹3.0 LRejected-Finance | ₹3.0 L | 2 | Rejected-Finance Bidder quoted More Then Estimate Value |
| Sl No | Description | Qty | Unit | R.KRISHNAN L2 | U R K CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00Earth work excavation complete direction as per the dept officers(100mm) | |||||
| 2.00Conveyance of excavated earth complete direction as per the Dept officers (5 KM)(40% of earth work qty) | |||||
| 3.00Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM ) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | |||||
| 4.00Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as prime coat manually etc., complete as per 502 of MORTH Rev V Specifications. | |||||
| 5.00Providing and laying Tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications . | |||||
| 6.00 | Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00-9.50mm graded metal, 0.17 cum of 9.50-2.36mm graded metal and 0.26 cum of 2.36mm & below metal by adding the shredded plastic waste equal to 8% of bitumen quantity 4.02Kg (50.30 x 8% = 4.02Kg) over the aggregate heated to 170 degree in CMP mixed well with 46.28Kg of hot bitumen VG30 / VG40 Bitumen (160 degree celcious) 60/70 grade for premixing per 10 sqm to lay 30mm compacted thick bituminious concrete including the cost and conveyance of all materials to C M P site, heating the bitumen and agregates to the required temperature and mixing with minimum required temperature in central hot mix plant 20 - 30 tonnes capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 80-100 KN Vibratory Roller / Pneumatic roller to the required density etc., including labour for loading bitumen in to bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20-30 t C M P with bitumen boiler, tipper trucks, paver finisher/9m paver finisher, Vibratory/Pneumatic rollers and all other tools and plants required, including fuel all other incidental charges etc., complete as per specification using C M P as per clause 507 of MORTH REV-5 specifications.(Plastic 8%) | 355 | M² | 710 ₹2.5 L | 702 ₹2.5 L |
| 7.00Add G.S.T. @ 18% | |||||
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
13 Feb 2026, 3:00 pmClosed
Assitant Commissioner
Zone 1, Tiruppur City Municipal Corporation
Providing BT Patch Repairs to Sathya Nagar Thirumalai Nagar, Shanmuga Nagar area in Ward No 24
2026_MAWS_650420_37
E1/01/2026
Open Tender
Civil Works
90 days
Zone 1, Tiruppur City Municipal Corporation
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,000
4 May 2026
5 Feb 2026
13 Feb 2026
5 Feb 2026
13 Feb 2026
5 Feb 2026
Earth work excavation complete direction as per the dept officers(100mm)
Conveyance of excavated earth complete direction as per the Dept officers (5 KM)(40% of earth work qty)
Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM ) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as prime coat manually etc., complete as per 502 of MORTH Rev V Specifications.
Providing and laying Tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications .
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00-9.50mm graded metal, 0.17 cum of 9.50-2.36mm graded metal and 0.26 cum of 2.36mm & below metal by adding the shredded plastic waste equal to 8% of bitumen quantity 4.02Kg (50.30 x 8% = 4.02Kg) over the aggregate heated to 170 degree in CMP mixed well with 46.28Kg of hot bitumen VG30 / VG40 Bitumen (160 degree celcious) 60/70 grade for premixing per 10 sqm to lay 30mm compacted thick bituminious concrete including the cost and conveyance of all materials to C M P site, heating the bitumen and agregates to the required temperature and mixing with minimum required temperature in central hot mix plant 20 - 30 tonnes capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 80-100 KN Vibratory Roller / Pneumatic roller to the required density etc., including labour for loading bitumen in to bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20-30 t C M P with bitumen boiler, tipper trucks, paver finisher/9m paver finisher, Vibratory/Pneumatic rollers and all other tools and plants required, including fuel all other incidental charges etc., complete as per specification using C M P as per clause 507 of MORTH REV-5 specifications.(Plastic 8%)
Add G.S.T. @ 18%
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.01 MB
36.pdf
Tender Documents • 0.34 MB
BOQ_781574.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid