| 1 | Admitted-Fee/PreQual/Technical AT PO SISWA TAJPUR PS BHANGAHA WEST CHAMPARAN | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹70.3 L
EMD Value
₹1.4 L
Closing Date
8 Jul 2026, 3:00 pmClosed
E.E., R.W.D. Works Division Narkatiaganj
E.E., R.W.D. Works Division Narkatiaganj
Mainatand Prakhand ke Chauhatta Panchayat ke Chakrasan Gaon ke Dakshin Tola se Indo Nepal Border Road par Jane Wali Sadak Mein Dhowast Pul ke Nirman ke Sath Sadak Nirman Karva Kiya
2026_RWD_148550_1
Tharuhat/26-27/Narkatiaganj/02
Open Tender
CIVIL
Percentage
120 days
Narkatiaganj
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹1.4 L
8 Jul 2026
2 Jul 2026
8 Jul 2026
2 Jul 2026
8 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing & Fixing of Working benchmark/Refrence Pillars 01 nos. per km & 04 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I | - | - | - | - |
| 2 | Benchmark Pillars 01 nos. per km | 1 | No | 5,418.22 | ₹5,418.22 |
| 3 | Refrence Pillars 04 nos. per km | 3 | No | 2,461.36 | ₹7,384.08 |
| 4 | Clearing and Grubbing Road Land
Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I ( By Manual Means) In area of non-thorny jungle | 0.47 | Hect. | 75,360.38 | ₹35,419.38 |
| 5 | Box Cutting :- Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 83.46 | Cum | 96.35 | ₹8,041.37 |
| 6 | Construction of Embankment with Material Obtained from Roadway Cutting
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet equirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5. | 50.08 | Cum | 75.69 | ₹3,790.56 |
| 7 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | 465.03 | Cum | 241.46 | ₹1,12,286.14 |
| 8 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m & 100 m as per Technical Specification Clause 303.1. (Including Royality & Labour Cess). | 828.62 | Cum | 244.73 | ₹2,02,788.17 |
| 9 | Granular Sub-base with Well Graded Material (Table 400.1) Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 89.03 | Cum | 2,796.55 | ₹2,48,976.85 |
| 10 | WATER MIX MACCADAM (WMM ) Providing Laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill) carraige of mixed material by tipper to site,laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100KN weight to achieve the desired density including lighting, barricading and maintainance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. | 142.03 | Cum | 5,153.1 | ₹7,31,894.79 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
SBDStateScheme.pdf
Tender Documents • 1.83 MB
BOQ_233103.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .