Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.1 LAccepted-AOC LINGIA T E DARJEELING | DARJEELING | ₹2.1 L | 1 | Accepted-AOC accepted |
| 2 | 2₹2.1 LRejected-AOC | ₹2.1 L | 2 | Rejected-AOC Rejected |
Tender Value
₹2.1 L
EMD Value
₹4,271
Closing Date
11 Dec 2025, 6:55 pmClosed
B.D.O
BDO SUKHIA
CONSTRUCTION OF DWS LAMBA DHURA UNDER LINGIA MARYBONG GRAM PANCHAYAT WITHIN JOREBUNGLOW SUKHIA POKHARI DEV BLOCK (APAS)
2025_DMD_950222_6
43/BDO_SKP/Plan/ (APAS)2025-26 Dt14.11.2025
Open Tender
CIVIL WORKS
LINGIA MARYBONG GP
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹4,271
Yes
25 May 2026
15 Nov 2025
15 Dec 2025
15 Nov 2025
11 Dec 2025
15 Nov 2025
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. .
Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming.
Cost of stone boulder 150 mm size delivered ans stacked at site.
Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes.
Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes.
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction.
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).
Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface].
Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m.
Supplying, fitting and fixing G.I. pipes of TATA make with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc.complete in all respect including cost of necessary fitting as required, jointing materials and two coats of painting with approved paint in any position above ground.( Payment will be made on the center line measurements of total pipe line including all specials. No seperate payment will be made for accesorie, specials.).
Labour Cess
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
43NIT.pdf
Tender Documents • 1.10 MB
BOQ_2267700.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid