| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.8 LAccepted-AOC N A | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹49.6 L+₹80,600.02 (1.65%)Rejected-Finance | L2 | Rejected-Finance Not Lowest Bidder | |
| 3 | L3₹50.0 L+₹1.2 L (2.45%)Rejected-Finance | L3 | Rejected-Finance Not Lowest Bidder | |
| 4 | Rejected-Technical | - | Rejected-Technical Insufficient Docouments |
Tender Value
₹48.8 L
EMD Value
₹97,697
Closing Date
22 Sept 2026, 5:00 pmClosed
E.E(Roads)
4,M.G.Road, How-1
Improvement of road by Cement Concrete work (M-20) at Puilya Pal Para from Shyan Sundar Primary school to H/o Gopal Adhikari under ward no-46 HMC (L-450.00m,Av.W- 4.00m)
2026_MAD_1040155_5
WB-HMC/NIT/ED/14/EE-II/26-27
Open Tender
CIVIL WORKS
Percentage
45 days
ward no-46
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,500
₹97,697
Yes
13 Oct 2026
5 Sept 2026
25 Sept 2026
5 Sept 2026
22 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in Soil by Manual Means
Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and
lead upto 1000 metres (Reference to MoRT&H's specification clause 301) [PWD N.HIGHWAY WING, w.e.f 2019-20, P-79, It-1] | 270 | M3 | 173.9 | ₹46,953 |
| 2 | Sand Filling in Foundation Trenches with good local sand free from earth not exceeding 150 mm compacted thickness including inundating each layer by profuse water and porking and rammimg layer by layer. Quality of sand is to be approved by the Engineer-in-charge.(Reference to MORT&H's specification 304). [PWD N.HIGHWAY WING, w.e.f 2019-20, P-79, It-1] | 280 | M3 | 1,113.32 | ₹3,11,729.6 |
| 3 | Brick masonry work with 1st class full size bricks except when necessary to complete the bond in cement morter 1:3 in foundation complete, including thoroughly soaking the bricks in a tank filled with water for a minimum period of one hour prior to being laid, protecting the green structure from rain by suitable covering and with a minimum Seven days curing etc., but excluding pointing and plastering, as per drawing and Technical Specifications.(Reference to MORT&H's specifications 1300 & 2200).
Cement Mortar1:4 (1cement :4 sand) [PWD N.HIGHWAY WING, w.e.f 2019-20, P- 183, It-5] | 45 | M3 | 7,015.26 | ₹3,15,686.7 |
| 4 | By Mix in Place Method
Construction of granular sub-base by providing graded
materials such as natural sand/crushed gravel/crushed
stone/combination depending upon the required
grading , spreading in uniform layers with motor
grader on prepared surface, mixing by mix in
place method with rotavator and compacting with
vibratory roller to achieve at least 98% of the
maximum dry density for the material
determined as per IS:2720 (Part 8), complete as per
clause 401 desired density, complete as per clause 401
for grading-II Material [PWD N.HIGHWAY WING, w.e.f 2019-20, P-99, I- 1B] | 368 | M3 | 2,625.89 | ₹9,66,327.52 |
| 5 | Water Bound Macadam
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including
spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate,
watering and compacting to the required density (Reference to MoRT&H's specification 404).
By Manual Means 9A(ii) Grading-2 (Table 400-9)
9A (ii) (b) Using Screening (Table 400-10) Type-B (11.2 mm aggregate) [PWD N.HIGHWAY WING, w.e.f 2019-20, P-104, IT-9 RATE ANALYSIS)] | 180 | M3 | 4,456.5 | ₹8,02,170 |
| 6 | Supplying, binding, fixing etc. including initial straightening, cutting to requisite length, hooking and bending to correct shape, placing in proper position of uncoated HYSD reinforcement bar in sub-structure complete as per drawing and
Technical Specifications (Reference to MORT&H's specifications 1600 & 2200) [PWD N.HIGHWAY WING, w.e.f 2019-20, P-217, It- 40] | 0.6 | MT | 77,030.53 | ₹46,218.32 |
| 7 | Plain/Reinforced cement concrete in sub-structure complete all including vibrating and compacting, finishing, curing, sampling, testing etc. by mechanically mixed as per drawing and Technical Specifications (Reference to MORT&H's specifications 1500, 1700 & 2200).
5E RCC Grade M20
Using concrete Mixer [PWD N.HIGHWAY WING, w.e.f 2019-20, P-221, It-5e] | 231 | M3 | 6,818.2 | ₹15,75,004.2 |
| 8 | Plastering with cement mortar (1:3) on brick work in sub-structure complete all including raking out joints curing, etc as per Technical Specifications (Reference to MORT&H's specifications 1300 & 2200) [PWD N.HIGHWAY WING, w.e.f 2019-20, P-219, It-3] | 282 | M2 | 122.79 | ₹34,626.78 |
| 9 | Add G.S.T 18% | 1 | No. | 7,37,768.95 | ₹7,37,768.95 |
| 10 | Add 1% Welfare Cess | 1 | No. | 48,364.85 | ₹48,364.85 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
Tendernotice_2.pdf
PDF • 5.89 MB
BOQ_2554365.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .