Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹12.6 Laccepted-aoc | ₹12.6 L | accepted-aoc |
Tender Value
₹23.3 L
EMD Value
₹23,325
Closing Date
11 Mar 2026, 1:30 pmClosed
CGM(Engg) Revenue Circle
Khairatabad Hyderabad
Laying of Water Supply and Sewerage lines to TIMS Hospital under O and M Dn.No.VI under Deposit Contribution Works
685515
EP-324/CGM(E)/RC/2025-26, Dt:10.03.2026
OPEN
Water Supply
HYDERABAD
12 documents required · 12 mandatory
₹826
₹23,325
11 Mar 2026
10 Mar 2026
10 Mar 2026
Cutting open BT Road surface including labour charges all leads, lifts and conveyance of all materials labour charges and other incidental and operational charges, tools and plants etc. complete as directed by the HMWS&SB Engineers.
Cutting open CC road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of strumps and other deleterious material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for pipeline trenches for laying water suppy/sewer lines all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for manhole all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
Excavation in hard rock (blasting prohibited) with benching, chiselling and wedging such as hard rock, sheet rock and boulders in habitant areas where controlled blasting cannot be done with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting walls and other structures, existing water supply lines, sewes, power cables, telephone cables/ducts, storm water drains, traffic signals etc.,wherever it is possible so as not to distrub the existing utility service etc., taking all precautionary measures in the restricted areas such as urban areas diversion of the traffic, removel of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and excluding backfilling for pipeline trenches for laying sewer/water supply lines/ foundations including all incidental and operational charges etc., complete. as directed by the HMWS&SB Engineers.
Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.
Manufacturing supply & delivery, lowering, laying and jointing of 300mm dial RCC NP4 pipe confirming IS 458-2003 confirming IS 122330-1988 with inner 12mm thick high almina cement confirming to IS 6452 in stsandard laying with socket and spigot ends suitable rubber rings including cost of materials rubber rings, and delivery to site unloading, lowering carefully in the ready made trenches, laying true to alignment and gradient by using cranes, jointing rubber rings and testing as per speicfications including cost and conveynance of all materials to site, labour charges and other incidental charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Construction of 0.9M X 0.9M dia meter sewer manhole up to 1m depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers..
Construction of 0.9M X 0.9M dia meter sewer manhole up to 0.1m additional depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers.
Redoing domestic sewer line connection incluidng EWE in all available soils and incluidng supply delivery and fixing of 100mm dia SWG pipes and including lowering laying and jointing in CM (1:1) prop; etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
Redoing of 15mm PPC connection for domestic water supply connection incluidng earth work excavation cost of pipe refilling etc., complete as directed by the HMWS&SB Engineers.
Supply delivery and filling of quarry dust (50% Rubbish 50% HBG Stone 2.36 mm) where ever required as directed by departmental officers including cost and conveyance stacking leveling watering tampering rolling all leads lobour charges and other incidental and operational charghes etc. complete as directed by the HMWS&SB Engineers.
Supply of good quality gravel for filling where ever required as directed by departmental officers including cost and conveyance of gravel, stacking, leveling, watering, tamping rolling, all leads, labour charges and other incidental and operational charges as directed by the H.M.W.S.&.S. Board Engineers.
Plain Cement concrete (M 20) Nominal Mix using 20mm graded metal using concrete mixer - using 20mm HG metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (As per GO Ms No 37 Industries and Commerce(Mines-I) Dept, dated 29.05.2018, Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 is adopted), coarse aggregate, water etc., including all operational, incidental and labour charges such as, machine mixing, laying concrete , curing, including contractor's profit and over head charges etc., as directed by the H.M.W.S.&.S. Board Engineers.
Carting away the surplus excavated materials such as rock / earth from the site to a suitable distance of about 8 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidential and operational charges etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
(Rupees Six Lakh Eighty Six Thousand One Hundred Eighty Eight and Four Paisa only)
Cutting open BT Road surface including labour charges all leads, lifts and conveyance of all materials labour charges and other incidental and operational charges, tools and plants etc. complete as directed by the HMWS&SB Engineers.
Cutting open CC road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of strumps and other deleterious material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for pipeline trenches for laying water suppy/sewer lines all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of strumps and other deleterious material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for pipeline trenches for Sluice Valve all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
Excavation in hard rock (blasting prohibited) with benching, chiselling and wedging such as hard rock, sheet rock and boulders in habitant areas where controlled blasting cannot be done with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting walls and other structures, existing water supply lines, sewes, power cables, telephone cables/ducts, storm water drains, traffic signals etc.,wherever it is possible so as not to distrub the existing utility service etc., taking all precautionary measures in the restricted areas such as urban areas diversion of the traffic, removel of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and excluding backfilling for pipeline trenches for laying sewer/water supply lines/ foundations including all incidental and operational charges etc., complete. as directed by the HMWS&SB Engineers.
Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.
Lowering the 200mm dia DI pipes (all classes) and specials(Fittings) with s/s ends carefully into the ready made trenches and laying them true to alignment and gradient including labour charges, operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Labour charges for lowering and keeping in position 200mm dia C.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing the 200mm dia C.I/DI K7 pipes and specials with S/S ends (Tyton rubber joints) excluding cost of jöinting materials such as rubber gasket and filling with water and testing to required field test pressure of 8kg/sqcm, including labour charges and all other incidental and operational charges to work site etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing 200mm dia D.I. / C.I pipes and valves with D/F joints including cost of nuts, bolts, rubber insertion etc., including filling with water and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Cutting of 200mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Supply delivery and filling of quarry dust (50% Rubbish 50% HBG Stone 2.36 mm) where ever required as directed by departmental officers including cost and conveyance stacking leveling watering tampering rolling all leads lobour charges and other incidental and operational charghes etc. complete as directed by the HMWS&SB Engineers.
Collection, Supply and filling ( quarry dust)with HBG stone chips 2.36mm and below in trenches of foundations and basement and the pipe line trenches with initial lead in layers not exceeding 15 cm thick consolidating each deposited layer watering consoliditing each layer watering and ramming including cost of collection of sand and other requied materials conveyance of water to worksite and all operational incidental, labouer charges hire charges of T and P complete for finished item work ect., complete as directed by the H.M.W.S.&.S. Board Engineers.
Supply and delivery fixing of RCC precast manholes chambers having the size of 36" at bottom tappering to 21" dia at top fixing in CC 1:4:8 Prop along with FRC cover HD -20 and frame laying CC design mix M-30 prop: Including cost of materials labour charges earth work curing conveyance etc., complete as directed by the HMWS&SB Engineers.
Redoing of 15mm PPC connection for domestic water supply connection incluidng earth work excavation cost of pipe refilling etc., complete as directed by the HMWS&SB Engineers.
Redoing domestic sewer line connection incluidng EWE in all available soils and incluidng supply delivery and fixing of 100mm dia SWG pipes and including lowering laying and jointing in CM (1:1) prop; etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
Junction work for connecting new 200mm dia DI pipe and MS specials to the 600 mm dia MS pipe true to alignment and gradient and making 3lines arc welding with new rubber packing, tightening with nuts and bolts laying and jointing of 200mm dia Dl pipe including cost of labour charges cost and conveyance of all incidental and operational charges etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
Conveyance of pipes from the departmental stores to work site including loading, unloading and labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
Supply and placing of the RCC 30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/MIXER(Weigh batch at site) with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and Conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site,, as specified by departmental officers at site, Seignorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content(400 Kg per Cum) as per IS code, centering with steel scaffolding Pipes, Jack pipes, Steel Centering Plates, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. etc.,complete as directed by the H.M.W.S.&.S. Board Engineers.
Carting away the surplus excavated materials such as rock / earth from the site to a suitable distance of about 8 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidential and operational charges etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
(Rupees Sixteen Lakh Forty Six Thousand Three Hundred Two and Ninety Four Paisa only)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Schedule B.xls
TENDER_DOCUMENT • 0.53 MB
Technical Specification (1).doc
TENDER_DOCUMENT • 0.39 MB
TENDER DOCUMENT.doc
TENDER_DOCUMENT • 0.23 MB
Schedule A.xls
TENDER_DOCUMENT • 0.10 MB
Download all tender documents and submit your bid