| 1 | 1₹1.4 CrAccepted-AOC NO 1 7 INSPECTOR QUARTERS PGR LINE BEHIND CPO BUILDING ANNATHANAPATTI LINEMEDU SALEM 636 006 | SALEM | TAMIL NADU | 636006 | ₹1.4 Cr | 1 | Accepted-AOC WORK AWARDED |
| 2 | 2₹1.5 Cr+₹6.8 L (4.69%)Rejected-AOC | ₹1.5 Cr+₹6.8 L (4.69%) | 2 | Rejected-AOC Second Lowest |
| 3 | 3₹1.7 Cr+₹22.1 L (15.3%)Rejected-AOC | ₹1.7 Cr+₹22.1 L (15.3%) | 3 | Rejected-AOC Third Lowest |
| Sl No | Description | Qty | Unit | SRI KAMATCHI CONSTRUCTION L3 | Thiru.R.Rajendran L1 | Sree Velan & Co L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 273.2 | Cu.m | 350 ₹95,620 | 269.61 ₹73,657.45 Lowest | 280 ₹76,496 |
| 2.00 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 42.3 | Cu.m | 180 ₹7,614 | 115.5 ₹4,885.65 Lowest | 150 ₹6,345 |
| 3.00 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 54.95 | Cu.m | 3,000 ₹1,64,850 | 2,066.19 ₹1,13,537.14 Lowest | 2,500 ₹1,37,375 |
| 4.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 74.3 | Cu.m | 250 ₹18,575 | 164.04 ₹12,188.17 Lowest | 180 ₹13,374 |
| 5.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 66.7 | Cu.m | 575 ₹38,352.5 | 507.09 ₹33,822.9 Lowest | 550 ₹36,685 |
| 6.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 22.19 | Cu.m | 6,500 ₹1,44,235 | 5,989.28 ₹1,32,902.12 Lowest | 6,000 ₹1,33,140 |
| 7.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for flooring including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 25.7 | Cu.m | 6,500 ₹1,67,050 | 5,989.28 ₹1,53,924.5 Lowest | 6,000 ₹1,54,200 |
| 8.00Providing Pre construction Anti termite treatment for the building including all chemicals as per standard specifications. Labour charges for preparing the areas for treatment spraying chemicals and other incidential charges etc., complete. The rate shall be inclusive of giving anti-termite treatment to the building for the following four stages including breaking the termite mounds making holes with crow bars at an intervel of 12"to a depth of 8" in the periphery of building and pouring chemicals etc., complete as per ISI 6313-1981 and. The antitermite chemicals used should have 0.5% concentration with 3L solution for the entire operation etc. as directed by the Engineer incharge and including cost of chemicals labour transportion etc, Stage:1 Spraying Anti-termite treatement chemicals solution for the foundation before laying the foundation concrete bottom and sides of the foundation. Stage:2 Spraying anti-termite chemicals solution to the grade beams level spraying has to be done for the grade beams brick masonry in the superstructure in contact with back fill earth. Stage:3 Spraying anti-termite chemicals solution on sand for the flooring before laying the flooring concrete. The treatment has to be carried out on the sand filling the basement after leveling operation is over. | ||||||
| 8.01 | Stage:4 Spraying anti-termite chemicals solution around the building outside of the building by making crow bar holes at an intervel of 12" to a depth of 8" around the building before laying the plinth projection. This holes has to be be closed after the treatment. | 250.89 | Sq.m | 200 ₹50,178 | 142.8 ₹35,827.09 Lowest | 150 ₹37,633.5 |
| 9.00Brick work in Cement Mortar 1:6 (One Cement and Six Crushed Stone Sand) using best quality Burnt Clay Brick of size 9” x 4 3/8” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. Other type of bond shall be done as directed by the Executive Engineer in charge. | ||||||
Tender Value
₹1.4 Cr
EMD Value
₹79,000
Closing Date
16 Sept 2025, 3:00 pmClosed
The Superintending Engineer
The Superintending Engineer, PWD., Buildings Construction and Maintenance Circle,Tiruvannamalai-4.
Construction of 5 Class Rooms, Boys Toilet, Girls Toilet and Providing Drinking water supply arrangements in Government High School at Kundalapuliyur in Villupuram District
2025_PWD_603446_1
35/TVM-CLE/25-26/10/ Dt.01.09.2025
Open Tender
Civil Works
Lump-sum
210 days
Kudalapuliyur
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹79,000
18 Nov 2025
13 Sept 2025
16 Sept 2025
13 Sept 2025
16 Sept 2025
13 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .