Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAccepted-AOC | ₹3.0 Cr Quoted ₹2.5 Cr | L1 | Accepted-AOC As per approval of competent authority for award tender to L1 bidder |
| 2 | L2₹2.8 Cr+₹30.0 L (11.8%)Rejected-Finance 51 A 4 BHOJPUR P O BHOJPUR TEHSIL SUNDERNAGAR DISTT MANDI H P | MANDI | HIMACHAL PRADESH | 175001 | ₹2.8 Cr+₹30.0 L (11.8%) | L2 | Rejected-Finance TEC unanimously rejected |
| 3 | L3₹2.9 Cr+₹37.7 L (14.9%)Rejected-Finance | ₹2.9 Cr+₹37.7 L (14.9%) | L3 | Rejected-Finance TEC unanimously rejected |
| 4 | L4₹3.0 Cr+₹46.4 L (18.3%)Rejected-Finance | ₹3.0 Cr+₹46.4 L (18.3%) | L4 | Rejected-Finance TEC unanimously rejected |
| 5 | L5₹3.1 Cr+₹51.6 L (20.3%)Rejected-Finance 2ND FLOOR 45 A MAA SHARDA NAGAR KABIT KHEDI INDORE NEAR BHRAT PUBLIC SCHOOL MR 10 SQUARE INDORE MADHYA PRADESH 452010 | INDORE | MADHYA PRADESH | 452010 | ₹3.1 Cr+₹51.6 L (20.3%) | L5 | Rejected-Finance TEC unanimously rejected |
| Sl No | Description | Qty | Unit | R.K GUPTA AND CO. L4 | S KUMAR CREATION PRIVATE LIMITED L5 | Sushil Kumar Gupta and Co L9 | ALHADIN CONSTRUCTION L1 | M/s AJAY KAPOOR L6 | Cee Kay EPC Projects Pvt Ltd L3 | ASHOK KUMAR GARG CONTRACTOR L8 | M/S VIKAS DUGGAL L7 | JMM INFRACON L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Material Required | ||||||||||||
| 1.01 | Galvanized steel poles of tubular in design and swaged of the length 7 meters, with top cap welded and lightning spike and including MUFF | 1,478 | Nos | 9,000 ₹1,33,02,000 | 10,300 ₹1,52,23,400 | 10,990 ₹1,62,43,220 | 7,800 ₹1,15,28,400 | 9,500 ₹1,40,41,000 | 8,480 ₹1,25,33,440 | 10,146 ₹1,49,95,788 | 4,000 ₹59,12,000 Lowest | 9,350 ₹1,38,19,300 |
| 1.02 | Galvanized steel poles of tubular in design and swaged of the length 8 meters, with top cap welded and lightning spike and including MUFF | 362 | Nos | 10,700 ₹38,73,400 | 10,500 ₹38,01,000 | 12,790 ₹46,29,980 | 9,400 ₹34,02,800 | 10,700 ₹38,73,400 | 8,900 ₹32,21,800 | 12,009 ₹43,47,258 | 8,000 ₹28,96,000 Lowest | 10,500 ₹38,01,000 |
| 1.03 | Stay arrangement for 7M/8M steel poles of Galvanised Steel | 184 | Nos | 2,000 ₹3,68,000 Lowest | 2,860 ₹5,26,240 | 4,130 ₹7,59,920 | 2,100 ₹3,86,400 | 2,000 ₹3,68,000 Lowest | 2,000 ₹3,68,000 Lowest | 3,000 ₹5,52,000 | 2,000 ₹3,68,000 Lowest | 3,500 ₹6,44,000 |
| 1.04 | Formed OFC Dead End and Termination Fittings including all supporting items. | 515 | Nos | 1,260 ₹6,48,900 | 1,870 ₹9,63,050 | 1,220 ₹6,28,300 | 1,260 ₹6,48,900 | 1,260 ₹6,48,900 | 1,200 ₹6,18,000 | 200 ₹1,03,000 Lowest | 1,000 ₹5,15,000 | 1,260 ₹6,48,900 |
| 1.05 | OFC suspension fittings including all supporting items. | 1,324 | Nos | 850 ₹11,25,400 | 1,430 ₹18,93,320 | 810 ₹10,72,440 | 990 ₹13,10,760 | 850 ₹11,25,400 | 800 ₹10,59,200 | 200 ₹2,64,800 Lowest | 200 ₹2,64,800 Lowest | 950 ₹12,57,800 |
| 1.06 | Adjustable Cable Storage Bracket. | 368 | Nos | 525 ₹1,93,200 | 962 ₹3,54,016 | 540 ₹1,98,720 | 600 ₹2,20,800 | 525 ₹1,93,200 | 530 ₹1,95,040 | 500 ₹1,84,000 Lowest | 800 ₹2,94,400 | 600 ₹2,20,800 |
| 2.00SERVICES REQUIRED | ||||||||||||
| 2.01 | Erection of 7 m / 8m poles including excavation, fixing of MUFF, concreting, curing, Backfilling, Reinstatement, Compaction of earth, Stay arrangements etc. and sign writing on poles with paint | 1,840 | Nos | 4,000 ₹73,60,000 | 3,066 ₹56,41,440 | 3,700 ₹68,08,000 | 3,000 ₹55,20,000 | 4,000 ₹73,60,000 | 3,950 ₹72,68,000 | 2,500 ₹46,00,000 | 400 ₹7,36,000 Lowest | 3,000 ₹55,20,000 |
| 2.02 | Slinging / Laying of ADSS / AOF including fixing of installation accessories and fixtures etc. splicing & jointing of OF cable, Link Testing & Acceptance Testing and makeover of route with As Built Diagram (ABD) of installed cost towards collection of ADSS Cable / AOF Cable from BSNL’s Store Depot. | 70.3 | Km | 42,000 ₹29,52,600 | 28,000 ₹19,68,400 Lowest | 48,000 ₹33,74,400 | 29,200 ₹20,52,760 | 40,000 ₹28,12,000 | 51,000 ₹35,85,300 | 1,05,000 ₹73,81,500 | 2,84,000 ₹1,99,65,200 | 30,000 ₹21,09,000 |
Tender Value
₹3.6 Cr
EMD Value
₹7.2 L
Closing Date
18 Sept 2025, 2:00 pmClosed
Chief General Manager BSNL Himachal Pradesh Circle
O/o CGMT BSNL HP Circle, Block no.11, SDA Complex, Kasumpti, Shimla, HP-171009
Tender for comprehensive construction of ADSS OFC, including Supply and installation of related ADSS OFC accessories, supply and erection of 7m/8m tubular poles along with associated accessories, slinging of ADSS Cable, testing and commissioning
2025_BSNL_246852_1
HPCO-23/11/20/2025-CFA-HPCO
Open Tender
OFC Laying Works
Works
1095 days
Shimla BA
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,360
Yes
AO(Claim), O/o CGMT, BSNL HP
₹7.2 L
Yes
13 Mar 2026
29 Aug 2025
19 Sept 2025
29 Aug 2025
18 Sept 2025
29 Aug 2025
29 Aug 2025 - 8 Sept 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 12.57 MB
taxdetailsADSSlaying.pdf
Tender Documents • 0.76 MB
BOQ_282550.xls
BOQ • 0.28 MB
approved70kmtender.pdf
Tender Documents • 12.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .