Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹21.3 L Additional cable works from electrical panel room (proposed at Generator Room) to existing panels of Central Library Building, Visva Bharati for conversation of 5 nos. three phase metering point in a single L.T. BULK metering point. | Additional cable works from electrical panel room (proposed at Generator Room) to existing panels of Central Library Building, Visva Bharati for conversation of 5 nos. three phase metering point in a single L.T. BULK metering point. | ₹21.3 L | L1 |
| 2 | L2₹23.0 L+₹1.7 L (7.83%) Additional cable works from electrical panel room (proposed at Generator Room) to existing panels of Central Library Building, Visva Bharati for conversation of 5 nos. three phase metering point in a single L.T. BULK metering point. | Additional cable works from electrical panel room (proposed at Generator Room) to existing panels of Central Library Building, Visva Bharati for conversation of 5 nos. three phase metering point in a single L.T. BULK metering point. | ₹23.0 L+₹1.7 L (7.83%) | L2 |
| 3 | L3₹23.2 L+₹1.8 L (8.64%) Additional cable works from electrical panel room (proposed at Generator Room) to existing panels of Central Library Building, Visva Bharati for conversation of 5 nos. three phase metering point in a single L.T. BULK metering point. | Additional cable works from electrical panel room (proposed at Generator Room) to existing panels of Central Library Building, Visva Bharati for conversation of 5 nos. three phase metering point in a single L.T. BULK metering point. | ₹23.2 L+₹1.8 L (8.64%) | L3 |
| 4 | L4₹23.4 L+₹2.0 L (9.58%) Additional cable works from electrical panel room (proposed at Generator Room) to existing panels of Central Library Building, Visva Bharati for conversation of 5 nos. three phase metering point in a single L.T. BULK metering point. | Additional cable works from electrical panel room (proposed at Generator Room) to existing panels of Central Library Building, Visva Bharati for conversation of 5 nos. three phase metering point in a single L.T. BULK metering point. | ₹23.4 L+₹2.0 L (9.58%) | L4 |
| 5 | L5₹23.7 L+₹2.4 L (11.4%) Additional cable works from electrical panel room (proposed at Generator Room) to existing panels of Central Library Building, Visva Bharati for conversation of 5 nos. three phase metering point in a single L.T. BULK metering point. | Additional cable works from electrical panel room (proposed at Generator Room) to existing panels of Central Library Building, Visva Bharati for conversation of 5 nos. three phase metering point in a single L.T. BULK metering point. | ₹23.7 L+₹2.4 L (11.4%) | L5 |
| Sl No | Description | Qty | Unit | ELEC-CON L10 | M.L.ENTERPRISE. L5 | MS ARUNA ENTERPRISE L12 | JOGMAYA ENGINEERING L11 | PROVAT CONSTRUCTION L2 | M/S SRIMUKHEE ENGINEERS L6 | M/S ELECTRO EQUIPMENTS TRADING CORPORATION L7 | Sanjay Kumar L9 | DAYANAND KUMAR L4 | MOON LIGHT L8 | SUBHASH SINGH CHOUDHARY L1 | DEBANJAN GIRI L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Electrical Works | - | - | -20.68 ₹26,42,332.43 | -28.71 ₹23,74,834.58 | -13.56 ₹28,79,516.08 | -15.61 ₹28,11,225.84 | -30.98 ₹22,99,215.64 | -27.95 ₹24,00,151.94 | -27.67 ₹24,09,479.38 | -22.05 ₹25,96,694.56 | -29.86 ₹23,36,525.42 | -26.44 ₹24,50,453.52 | -35.99 ₹21,32,320.96 Lowest | -30.46 ₹23,16,538.04 |
Tender Value
₹33.3 L
EMD Value
₹66,625
Closing Date
22 Jul 2026, 3:00 pmClosed
EE( E)- Durgapur
The Executive Engineer (E ),Durgapur Electrical Division, CPWD, Durgapur-09
Additional cable works from electrical panel room (proposed at Generator Room) to existing panels of Central Library Building, Visva Bharati for conversation of 5 nos. three phase metering point in a single L.T. BULK metering point.
161470
11/EE (E )/DED/CPWD/2026-27
OPEN
Electrical Works
NCB
2 months
Shimla, Himachal Pradesh
6 documents required · 6 mandatory
₹66,625
Not Applicable
22 Jul 2026
14 Jul 2026
22 Jul 2026
22 Jul 2026
22 Jul 2026
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT.pdf
document • 3.11 MB
EMD.pdf
document • 0.25 MB
Corrigendum 1.pdf
document
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .