Superintending Engineer-Electrical Systems- Tuticorin Thermal Power Station-Tuticorin
EM III Annual maintenance works in Boiler Feed Pump Motors 5A 5B and 5C and Condensate Extraction Pump Motors 5A and 5B during Annual overhaul 2022 23 or there after
2022_EB_236278_1
SE/ES /TTPS/102/2022-23
Open Tender
Electrical Works
Item Rate
15 days
TTPS
As per BQR conditions in NIT
6 documents required · 6 mandatory
₹0
₹1,300
Yes
15 Nov 2022
30 Jun 2022
22 Jul 2022
30 Jun 2022
21 Jul 2022
30 Jun 2022
Charges for carrying out annual maintenance works Boiler Feed Pump Motors BFP 5A, 5B & 5C: Charges for removing the cooler pipe line and cooler from the motor. Dismantling the cooler cover, cleaning the cooler tubes by wire brush, air and with water. Changing the gaskets and reassembling it, checking the cooler tubes for leak, hydraulic testing of cooler with 4 Kgf / cm2 pressure for six hour duration and reerecting the cooler. Checking the motor terminal tightness and taking IR value and PI value including cost of Neoprine rubber sheet (15 Kg) and anti corrosive paint (1 lit)
Charges for annual Maintenance works of Condensate Extraction Pump Motors CEP 5A & 5B: Removing of CEP Motor cooler top cover and fan. Cleaning of tubes by brush and air. Cleaning the fan and cover. Checking of motor terminal tightness. Taking IR values and PI values. Grease packing in DE and NDE bearings. Assembly of cooler cover after completion of work including Cost of Consumables and hire charges for T&P etc
Charges for removal and refixing of floor grills at 15.5 mt level for lifting and re-erecting the coolers in the HT Motors: Removal of floor M.S. grills at 15.5 mt level by EOT Crane after providing adequate barricades for safety measure to lift coolers from the motors and refixing the M.S.grills in position. After completion of work, Removal of M.S.grills by EOT crane at 15.5 mt level after providing adequate barricades for safety measure to reerect the coolers in their motors and refixing the floor M.S.grill in its position.
C.ABDULLA ENGINEERING CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .