| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.5 LAccepted-AOC | L1 | Accepted-AOC L1 Tenderer | |
| 2 | L2₹41.8 L+₹31,555.74 (0.76%)Rejected-Finance | L2 | Rejected-Finance L2 Tenderer | |
| 3 | L3₹42.0 L+₹49,258.27 (1.19%)Rejected-Finance | L3 | Rejected-Finance L3 Tenderer |
Tender Value
₹42.4 L
EMD Value
₹43,000
Closing Date
12 Mar 2024, 3:00 pmClosed
The Additional Collector (Dev) DRDA CPT
O/o The Additional Collector (Dev) DRDA CPT
Providing Cement Concrete Road in 4 Nos of Roads 02 Habitation at Perumbakkam Panchayat at Punithathomaiyarmalai Panchayat Union of Chengalpattu District under CGF Grant Pkg 25
2024_RDTN_442780_1
Rc.No.0745/2024/A14, dt.05.03.2024
Open Tender
Civil Works
Item Rate
90 days
St.Thomas Mount
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹43,000
27 Aug 2024
6 Mar 2024
12 Mar 2024
6 Mar 2024
12 Mar 2024
6 Mar 2024
Amount
PART I :Providing CC Pavement to Sekaran Nagar 2nd main Road with Drain at Perumbakkam Panchayat in St Thomas Mount Panchayat Union EST AMT RS: 21.92 Lakhs
Construction of Granular Sub base by providing well graded material(63mm to 26.5mm @35%,26.5mm to 4.75 @45% and 4.75 mm below @ 20%)& spreading in uniform layers with tractor with grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans
Centering charges for all CC items of works including all labour charges etc., complete.
Plain Cement Concrete 1:4:8 (one cement, Four M.Sand and Eight hard broken stone jelly) using 40mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Towards cost of expansion Joint with Bitumen pad including all other charges etc., complete
Earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per SS 20B
Supplying and filling in foundation and basement with Filling M Sand in layers etc. complete.
Cement concrete 1:4:8 mix using 40mm metal including all other labour charges for laying, watering and curing charges etc., complete
Centering charges for all CC items of works including all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm metal including all other labour charges for laying, watering and curing charges etc., complete
Plastering with cm 1:5 mix, 12mm thick including all other labour charges etc., complete.
PART II : Providing CC Pavement to Shanthi Nagar 5th street at Perumbakkam Panchayat in St Thomas Mount Panchayat Union EST AMT RS: 11.72 Lakhs
Construction of Granular Sub base by providing well graded material(63mm to 26.5mm @35%,26.5mm to 4.75 @45% and 4.75 mm below @ 20%)& spreading in uniform layers with tractor with grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans
Centering charges for all CC items of works including all labour charges etc., complete.
Plain Cement Concrete 1:4:8 (one cement, Four M.Sand and Eight hard broken stone jelly) using 40mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Towards cost of expansion Joint with Bitumen pad including all other charges etc., complete
Earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per SS 20B
Supplying and filling in foundation and basement with Filling M Sand in layers etc. complete.
Cement concrete 1:4:8 mix using 40mm metal including all other labour charges for laying, watering and curing charges etc., complete
Centering charges for all CC items of works including all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm metal including all other labour charges for laying, watering and curing charges etc., complete
Plastering with cm 1:5 mix, 12mm thick including all other labour charges etc., complete.
PART III : Providing CC Pavement with Drain to Sekaran Nagar 1st Street at Perumbakkam Panchayat in St Thomas Mount Panchayat Union EST AMT RS: 3.52 Lakhs
Construction of Granular Sub base by providing well graded material(63mm to 26.5mm @35%,26.5mm to 4.75 @45% and 4.75 mm below @ 20%)& spreading in uniform layers with tractor with grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans
Centering charges for all CC items of works including all labour charges etc., complete.
Plain Cement Concrete 1:4:8 (one cement, Four M.Sand and Eight hard broken stone jelly) using 40mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Towards cost of expansion Joint with Bitumen pad including all other charges etc., complete
Earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per SS 20B
Supplying and filling in foundation and basement with Filling M Sand in layers etc. complete.
Cement concrete 1:4:8 mix using 40mm metal including all other labour charges for laying, watering and curing charges etc., complete
Centering charges for all CC items of works including all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm metal including all other labour charges for laying, watering and curing charges etc., complete
Plastering with cm 1:5 mix, 12mm thick including all other labour charges etc., complete.
PART IV : Providing CC Pavement to Shanthi Nagar 6th Street at Perumbakkam Panchayat in St Thomas Mount Panchayat Union EST AMT RS: 5.28 Lakhs
Construction of Granular Sub base by providing well graded material(63mm to 26.5mm @35%,26.5mm to 4.75 @45% and 4.75 mm below @ 20%)& spreading in uniform layers with tractor with grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans
Centering charges for all CC items of works including all labour charges etc., complete.
Plain Cement Concrete 1:4:8 (one cement, Four M.Sand and Eight hard broken stone jelly) using 40mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Towards cost of expansion Joint with Bitumen pad including all other charges etc., complete
Earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per SS 20B
Supplying and filling in foundation and basement with Filling M Sand in layers etc. complete.
Cement concrete 1:4:8 mix using 40mm metal including all other labour charges for laying, watering and curing charges etc., complete
Centering charges for all CC items of works including all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm metal including all other labour charges for laying, watering and curing charges etc., complete
Plastering with cm 1:5 mix, 12mm thick including all other labour charges etc., complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}18%
MRP Infratech Private Limited
R.SUJATHA
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .