| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 CrAccepted-AOC | ₹14.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹14.8 CrRejected-Finance | ₹14.8 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹15.9 CrRejected-Finance | ₹15.9 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹16.0 CrRejected-Finance | ₹16.0 Cr | L4 | Rejected-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹30 L
Closing Date
25 Feb 2021, 12:00 pmClosed
S. E. UNNAO CIRCLE, PWD UNNAO
OFFICE OF S. E. UNNAO CIRCLE, PWD UNNAO
Widening and strengthening of pachdevra to ramapur chhaiya via sahjanpur (bharkhani to purviyakala shahjahanpur border) (ODR) from ch. 3.000 to 13.000 (length 10.000 km) under rajya yojana scheme in F.Y.-2020-21 in Distt Hardoi
2021_CEUCZ_556263_1
693M/1MT/E-TENDER/ UC/20-21 DATE 30.01.2021
Open Tender
Civil Works
365 days
HARDOI
Widening and strengthening of pachdevra to ramapur chhaiya via sahjanpur (bharkhani to purviyakala shahjahanpur border) (ODR) from ch. 3.000 to 13.000 (length 10.000 km) under rajya yojana scheme in F.Y.-2020-21 in Distt Hardoi
2 documents required · 2 mandatory
₹2,715
₹30 L
Yes
OFFICE OF S. E. UNNAO CIRCLE, PWD UNNAO
23 Mar 2021
17 Feb 2021
26 Feb 2021
17 Feb 2021
25 Feb 2021
17 Feb 2021
19 Feb 2021
Amount
Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301 (including labour cess and excluding GST)
Earthwork in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom,brakfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.(including labour cess and excluding GST)
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.(including labour cess and excluding GST)
Providing, laying, and spreading graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (including labour cess and excluding GST
Providing, laying, and spreading graded stone aggregate to Stablized wet mix macadam specification (OPC cement 1% & 3.5% SS bitumen emulsion by weight of mix) including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (including labour cess and excluding GST)
Construction of Patri with approved material obtained from borrow pits/excavation from trench as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.(Only Compaction) (including labour cess and excluding GST)
Construction of Patri with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301. (including labour cess and excluding GST)
Providing and applying tack coat with bitumen VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared surface cleaned with hydraulic broom. (including labour cess and excluding GST)
Providing and laying dense graded bituminous macadam with 100 TPH hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder as per job mix , transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 507 complete in all respects. (including labour cess and excluding GST)
Providing and applying tack coat with bitumen VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared surface cleaned with hydraulic broom. (including labour cess and excluding GST)
Providing and laying bituminious concrete with 100 TPH batch type hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder as per job mix, transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 509 complete in all respects. (including labour cess and excluding GST)
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. (including labour cess and excluding GST)
R.C.C. work with cement, approved coarse sand and 2 cm. (3/4") guage approved stone grit in the proportion of (1:1.5:3)(1cement :1.5coarse sand( FM2.20-3.60) :3 stone aggregate20mm) in drain excluding supply of reinforcement and its bending but including its fixing in position and binding with 24 B W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. (including labour cess and excluding GST)
Mild steel or iron in plain work such asreinforced concrete or reinforced, brick work (when not included in anover all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level. (including labour cess and excluding GST)
SIDDHARTH CONSTRUCTION
M/s PBC Infrastructure India Private Limited
M/s Raj Laxmi Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf