Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.0 L+₹42,574.80 (7.61%)Rejected-AOC TUTICORIN TAMIL NADU | TUTICORIN | TAMIL NADU | 626202 | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical BQR Condition Sl.No.1 is not satisfied. Hence could not be considered |
Tender Value
Refer Docs
EMD Value
₹5,700
Closing Date
14 Mar 2025, 2:00 pmClosed
Chief Engineer TTPS TTN 4
Office of the SE Civil TTPS TTN 4
Regular Maintenance to the existing lawns, flower beds, hedge plants and casuarinas trees, etc. around Occupational Health Center Building, along 302.5 W road on both sides and in front of Sewage Treatment Plant area in 275 N road etc
2025_EB_531148_1
CE SE C TTPS Spec. No 14 25 26
Open Tender
Civil Works - Others
Item Rate
365 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,700
Yes
8 May 2025
8 Mar 2025
15 Mar 2025
8 Mar 2025
14 Mar 2025
8 Mar 2025
Regular maintenance of the existing Korean grass, lawns, elevated lawn pits, flower beds, hedge plants, casuarinas& other trees and flower pots around occupational health centre building and along the road sides of the 302.5W road and sewage treatment plant area for an approximate area to 912.00 Sqm by daily watering, cleaning and disposing of fallen dry leaves from the lawn area, removal of weeds growth and plugging out of extra grass growth at the bottom of hedges the rate including labour, charges, all lead lift, tools and tackles such as water hoses/ pipes and scissors, sprinklers etc complete.
Providing periodical maintenance such as cutting and trimming the hedges, casuarinas trees at an interval of once in a month rate including for labour, lead, lift, cutting scissors, etc., complete.
Supplying and providing fungicides and pesticides to the lawn/ hedges/ casuarinas/ trees etc once in 3 months including cost of all materials labour, lead, lift, hand pump, (or) sprayer, etc., complete.
Supplying and providing manure/ urea the specified quantities at the rate of once in 3 months, rate including cost of all materials, labour, lead, lift, etc., complete.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .