Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹65.8 LAccepted-AOC 5TH FLOOR FLAT NO 502 PARVATI APARTMENT TAYWADE NAGAR BESIDE D MART BELTARODI ROAD NAGPUR 440037 | NAGPUR | NAGPUR | MAHARASHTRA | 440037 | L-1 | Accepted-AOC Lowest qualified bidder. Hence being awarded | |
| 2 | L-2₹57.4 L+₹1.7 L (3.01%)Rejected-AOC 2ND FLOOR S 30 GINGER SQUARE JARIPATAKA NAGPUR | NAGPUR | NAGPUR | MAHARASHTRA | 440014 | L-2 | Rejected-AOC Not qualified L-1 bidder | |
| 3 | L-3₹72.8 L+₹17.1 L (30.7%)Rejected-AOC DOHEWADI RAJURA DIST CHANDRAPUR 442905 | RAJURA | CHANDRAPUR | MAHARASHTRA | 442905 | L-3 | Rejected-AOC Not qualified L-1 bidder | |
| 4 | Rejected-Technical | - | Rejected-Technical Experience submitted by the bidder is not as per NIT.Hence rejected |
Tender Value
₹80.8 L
EMD Value
₹1.0 L
Closing Date
2 Nov 2022, 3:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Shri. Anil Thoorwal
OFFICE OF THE AREA GENERAL MANAGER WCL BALLARPUR AREA P.O. SASTI TA. RAJURA DIST. CHANDRAPUR (MS) PIN 442905
Strengthening of CTR from PWD junction to security check post and T point junction by concreting and from Security check post to T point by black topping at Pouni II Expansion OCM under Pouni Sub Area.
2022_WCL_259691_1
ba3650-civ-e55-2022-23
Open Tender
Civil Works - Roads
Item Rate
90 days
WCL Ballarpur Area
As per NIT
5 documents required · 5 mandatory
₹1.0 L
11 Dec 2022
18 Oct 2022
3 Nov 2022
18 Oct 2022
2 Nov 2022
18 Oct 2022
18 Oct 2022 - 27 Oct 2022
Amount
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately. By Mechanical means Bituminous courses
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevent clauses of section-300 of specification.
Laying of old dismanted road material, spreading and compacting the same to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.
Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator or plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification by Plant Mix Method (ii)For Grading-II Material
Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator or plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification by Plant Mix Method (ii)For Grading-III Material
Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm,aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length onstruction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8- 10 tonnes vibratory roller, finishing and curing as per clause 601 of specification complete in all respect.
Cement Concrete Pavement Construction of un-reinforced, dowel jointed, plain cement concrete pavement M-40 grade concrete over a prepared sub base with cement , coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of specifications complete but but excluding cost of steel in dowel bar and tie rods etc.
The cost of steel in dowel bar and tie rod including craddle, laps etc. complete required as per design. I) Mild steel
The cost of steel in dowel bar and tie rod including craddle, laps etc. complete required as per design. ii) Tor steel
Water Bound Macadam Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per clause 404 of specification. By Mechanical Means (ii) Grading- II (53 to 22.4mm (a) Using Screening Type-B (11.2mm
Dense Graded Bituminous Macadam Providing and laying dense bituminous macadam using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per clause 505 of specification complete in all respects. a) Using Batch Mix Plnt of appropriate capacity and Paver finisher Hydraustatic with sensor i) for grading II (19mm nominal size).
Providing and applying tack coat with low viscosity bitumen of VG 10 grade using bitumen pressure sprayer on the prepared bituminous/granular surface cleaned with mechanical broom and as per relevant clauses of section-503 of specifications. (iv) @ 0.40 kg per sqm (Non-bituminous surfaces) granular base not primed.
Providing and applying tack coat with low viscosity bitumen of VG 10 grade using bitumen pressure sprayer on the prepared bituminous/granular surface cleaned with mechanical broom and as per relevant clauses of section-503 of specifications. (iv) @ 0.30 kg per sqm (dry & hungry bituminouse surfaces/granual surface treated with primer.
Providing and laying bituminous concrete using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as er clause 507 of specification a) Using Batch Mix Plant of appropriate capacity and Paver Finisher Hydraustatic with Sensor control. (iv) for Grading-II (30-45 mm thickness ) with 60/70 bitumen(VG-30)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. as per relevant clauses of section 300 & 2100 in
Sand Filling in Foundation Trenches as per Drawing & Technical Specification.
PCC M-15 in Foundation Plain cement concrete M-15 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. as per MORT&H Specification 409.PCC M-15 in Foundation
Provdiing and laying Plain/Reinforced cement concrete in open foundation including form work shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of sections 1500, 1700 & 2100 with .RCC Grade M20
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specificationsRCC GRADE M20
Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications and as per relevant clause of section 1600.
Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m.
Providing and Laying Reinforced cement concrete pipe NP4/prestrssed concrete pipe for culverts on first class bedding of granular material (cost of bedding excluding) in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. 1000 mm dia
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia pvc. pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. as per direction of engineer incharge.
Total impact of GST for the purpose of CTC
S.K. CONSTRUCTIONS
ARVIND PANDEY
stage.html
html • 0.05 MB
techsummary_268548.pdf
PDF • 1.05 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_268548.pdf
PDF • 1.39 MB
Award-e55.pdf
PDF • 3.49 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .