| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC 00 MUKUNDPUR PAHO DOMANPUR MUKUNDPUR PAHO MIRZAPUR UTTAR PRADESH 231306 | MIRZAPUR | UTTAR PRADESH | 231306 | ₹2.7 L Quoted ₹2.3 L | L1 | Accepted-AOC OK |
| 2 | L2₹2.8 L+₹47,852.67 (21.1%)Rejected-Finance PARASI PO KAKERI DISTT SONEBHADRA UP 231224 | PARASI | SONEBHADRA | UTTAR PRADESH | 231224 | ₹2.8 L+₹47,852.67 (21.1%) | L2 | Rejected-Finance not Found As L1 Bidder |
| 3 | L3₹2.8 L+₹51,652.57 (22.7%)Rejected-Finance JHARKHAND | LOHARDAGA | JHARKHAND | 835302 | ₹2.8 L+₹51,652.57 (22.7%) | L3 | Rejected-Finance not Found As L1 Bidder |
| 4 | L4₹3.0 L+₹72,855.52 (32.1%)Rejected-Finance AT ARGADA DISTT RAMGARH JHARKHAND | ₹3.0 L+₹72,855.52 (32.1%) | L4 | Rejected-Finance not Found As L1 Bidder |
| Sl No | Description | Qty | Unit | M/S ADITYA ENTERPRISES L1 | Anupam Enterprises L2 | M/s Achal Electricals L3 | Maa Katyayani Enterprises L4 |
|---|---|---|---|---|---|---|---|
| 1.01 | Cost of DGC copperstrip 5 mm x 2 mm = 4.33 kg each strip x 60 coils = 259.80 kg - 60% scrap (155.88 kg) = 103.92 kg | 103.92 | Kgs | 745 ₹77,420.4 Lowest | 1,150 ₹1,19,508 | 915.2 ₹95,107.58 | 985.6 ₹1,02,423.55 |
| 1.02 | Cost of mouding of one coil with craption, nomax and mica | 60 | coil | 1,530 ₹91,800 | 1,100 ₹66,000 Lowest | 1,875 ₹1,12,500 | 2,015 ₹1,20,900 |
| 1.03 | Insulation cost | 1 | LS | 29,032.65 ₹29,032.65 Lowest | 44,815 ₹44,815 | 35,665.34 ₹35,665.34 | 38,408.83 ₹38,408.83 |
| 1.11 | Labour cost for complte rewinding of motor | 1 | LS | 29,032.65 ₹29,032.65 Lowest | 44,815 ₹44,815 | 35,665.34 ₹35,665.34 | 38,408.83 ₹38,408.83 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - | - |
Tender Value
₹3.2 L
EMD Value
₹4,000
Closing Date
9 Aug 2024, 6:00 pmClosed
PROJECT ENGINEER (ENM)
OFFICE OF THE P.E.(EandM), Jarangdih Colliery
Repairing, rewinding and maintenance of 01 no. 325 KW, 3.3KV make Marathon, S.No.- 3F33072002 induction motor of Jarangdih Project under Kathara Area.
2024_CCL_313678_1
JRD/PE/EnM/e-Tender/24-25/231, DT.28.07.2024
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
P.E.(EandM), JRD
Please refer Tender documents.
6 documents required · 6 mandatory
₹4,000
18 Jul 2026
29 Jul 2024
10 Aug 2024
30 Jul 2024
9 Aug 2024
30 Jul 2024
30 Jul 2024 - 6 Aug 2024
Amount
Cost of DGC copperstrip 5 mm x 2 mm = 4.33 kg each strip x 60 coils = 259.80 kg - 60% scrap (155.88 kg) = 103.92 kg
Cost of mouding of one coil with craption, nomax and mica
Insulation cost
Labour cost for complte rewinding of motor
Total impact of GST for the purpose of CTC
Anupam Enterprises
M/s Achal Electricals
Maa Katyayani Enterprises
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .