Loading…
Loading…
Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
25 Jul 2026, 2:00 pm
Executive Engineer(E)/ ARSM SQ BPS
15, Raja Subodh Mallick Square, Kolkata - 700013
Repairing of dilapidated office staff room, security room, including other allied plumbing works at Auckland Sq BPS
2026_KMC_1032164_1
KMC/WS/ARSM/16/2026-27
Open Tender
CIVIL WORKS
Percentage
20 days
Auckland Sq. BPS
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,000
15 Jul 2026
15 Jul 2026
27 Jul 2026
15 Jul 2026
25 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES
ETC 2. Dismantling all types of plain cement concrete works, stacking
serviceable materials at site and removing rubbish as directed within
a lead of 75 m In ground floor including roof. (a) upto 150 mm. thick | 1.65 | CUBIC METER | 939 | ₹1,546.53 |
| 2 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES
ETC 10. Stripping off worn out plaster and raking out joints of walls,
celings etc. upto any height and in any floor including removing
rubbish within a lead of 75m as directed. | 235.28 | SQUARE METER | 19 | ₹4,470.29 |
| 3 | BUILDING WORKS ( C ) Brickworks,Concrete Works
etc?33..Ordinary Cement concrete (mix 1:2:4) with graded stone
chips (6mm nominal size) excluding shuttering and reinforcement,if
any, in gound floor as per
relevant IS codes. Pakur variety? | 1.65 | CUBIC METER | 5,275 | ₹8,687.93 |
| 4 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc B.
CONCRETE WORKS 3. Making one set of scaffolding only for
replacing glass panels, painting, uprooting plant and another repairing
works of building and S&P works for external works only with 10 cm.
dia bamboo as main posts at the rate of 1 metre centre to centre and
7.5 cm. dia bamboo ties @ 0.75 metre apart fitting and fixing with
necessary coir, nails etc. as per direction of the Engineer-incharge.
(This item should be executed only after prior approval of the Engineer-incharge). Firstly, one number to be paid and then labour
rate for shifting up to further nineteenth (19) times @ 10% each time
to be considered. If necessary further after twenty times of total use,
another one number new and labour rate for shifting to be considered
accordingly a) 3.90 metre height | 2 | EACH | 279 | ₹558 |
| 5 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc B.
CONCRETE WORKS 3. Making one set of scaffolding only for
replacing glass panels, painting, uprooting plant and another repairing
works of building and S&P works for external works only with 10 cm.
dia bamboo as main posts at the rate of 1 metre centre to centre and
7.5 cm. dia bamboo ties @ 0.75 metre apart fitting and fixing with
necessary coir, nails etc. as per direction of the Engineer-incharge.
(This item should be executed only after prior approval of the
Engineer-incharge). Firstly, one number to be paid and then labour
rate for shifting up to further nineteenth (19) times @ 10% each time
to be considered. If necessary further after twenty times of total use,
another one number new and labour rate for shifting to be considered
accordingly b) Extra for additional 3.6 height or part thereof | 2 | EACH | 245 | ₹490 |
| 6 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc..C. REPAIR
AND REHABILITATION WORKS?Cleaning the concrete surface by
removing dirt and debris, marking defective locations and removing
loose concrete by careful stripping untill hard surface is exposed,
cutting the concrete to regular shape, wire brushing the exposed
surface and removing debris from site complete as per direction of
the Engineer - in - Charge. | 90 | SQUARE METER | 20.2 | ₹1,818.29 |
| 7 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc..C. REPAIR
AND REHABILITATION WORKS?Cleaning the exposed
reinforcement preferably upto full diameter by wire brush, applying
two coats of polymer based rust removing compound left for 24
hours, removing the coating and then applying two (2) coats of
polymer modified anti corrosive protective coating formulated to
inhibit the corrosion of reinforcement as per manufacturer's
specification] [Mode of measurement:The affected surface area of
reinforcement shall be considered for payment] | 782 | SQUARE METER | 20.2 | ₹15,798.9 |
| 8 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc..C. REPAIR
AND REHABILITATION WORKS?Applying epoxy based reactive
joining agent for joining the old concrete with fresh concrete to be
applied within manufacturer's specified time as per manufacturers
specification. (0.4 Kg / m? of concrete surface).Note: Applicable only
when the full diameter of reinforcement steel is exposed. | 309 | SQUARE METER | 20.2 | ₹6,242.79 |
| 9 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc..C. REPAIR
AND REHABILITATION WORKS?Extra rate for using water proofing
and plasticising admixture @ 0.2% by weight of cement (or at
manufacturer's specified rate) for concrete of various grades. | 119 | KILOGRAM | 20.2 | ₹2,404.18 |
| 10 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING,
POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor,
ceiling etc.) with sand and cement mortar including rounding off or
chamfering corners as directed and raking out joints including
throating, nosing and drip course, scaffolding/staging where
necessary (Ground floor).[Excluding cost of chipping over concrete
surface](iii) With 1:3 cement mortar (a) 20 mm thick plaster | 206 | SQUARE METER | 113.4 | ₹23,360.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
Tendernotice_2.pdf
PDF • 0.22 MB
BOQ_2534626.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid