| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹72.4 LAccepted-AOC SBI MIRZAPUR SBI MAIN BRANCH 1ST FLOOR DUNKELNGANJ MIRZAPUR 231001 | MIRZAPUR | MIRZAPUR | UTTAR PRADESH | 231001 | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹75.8 L+₹3.4 L (4.72%)Rejected-Finance | L-2 | Rejected-Finance L-2 |
Tender Value
Refer Docs
EMD Value
₹2.1 L
Closing Date
31 Jul 2023, 12:00 pmClosed
S.E. B.S.C.C.C.-2, Mzp
Office of S.E. B.S.C.C.C.-2, Mzp
REMODELING OF HARRAI CANAL FROM KM 2.200 TO KM 9.280
2023_UPIDC_823904_1
06/SE/2023-24
Open Tender
Civil Works
Item Rate
150 days
Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹2.1 L
1 Sept 2023
24 Jul 2023
31 Jul 2023
24 Jul 2023
31 Jul 2023
25 Jul 2023
Amount
Earth work in Cutting internal section minor from and its dispossal for recoupment of bank daula, service road etc. as per direction of Engineer-in-charge.
Earth work in Filling in canal embankment including all leads and lifts, manual compaction ,labour charges, T&P etc. Required for proper completion of work
Dismantling stone work in lime or cement mortar including stacking of dismantled materials as directed by the Engineer-in-charge, making size of boulder 200x200x200,all lead and lift T&P etc.
Dismantling reinforced cement concrete 1:2:4 including stacking of dismantled materials as directed by Engineer-in-charge within a distance of 210 M.
Earth work in excavation of foundation with hard soil mixed with boulder including all leads and lifts, labour charges, T&P etc. Required and its disposal as per direction of Engineer-in-charge.
Centering and shuttering for concrete work required for proper completion of work
Laying P.C.C. 1:4:8 in foundation with cement,coarse sand of F.M. more then 2.00 and hard stone 20 to 40 mm including cost of all material, labour, T&P etc. required for proper completion of work.
Laying P.C.C. 1:3:6 (M-10) in foundation with cement,coarse sand of F.M. more then 2.00 and hard stone ballast 20 to 40 mm including cost of all material, labour, T&P etc. required for proper completion of work.
C.R. cut stone (khanda) 200x200x200 mm masonary 1:3 including cost of material, T&P etc. including all lead and lift for proper completion of work.
Laying C.C. 1:2:4 (M-15) with cement, coarse sand of F.M. more then 2.00 and crushed hard stone grit size 4.75 to 20 mm including cost of all material, labour, T&P etc. required for proper completion of work.
Carriage, Cutting, Bending, Binding, and placing steel for reinforcemet with cost of binding wire including cost of all materials, labour, T&P etc. required for proper completion of work.
Laying R.C.C. 1:1.5:3 with cement, coarse sand of F.M. more than 2.00 and crushed hard stone grit of size 4.75-20 mm. including cost of all material, labour, T&P etc. required for proper completion of work.
Deep struck cement pointing 1:2 C.M. on stone masonry including cost of material, T&P etc. including all lead and lift for proper completion of work.
Providing and laying stone boulder pitching with stone boulder grouting incuding cost of all material, labour, T&P etc. required for proper completion of work.
S/Fixing P.V.C. pipe 75 mm. dia for weep holes and drainage spout including cost of all material. labour, T&P etc. required for proper completion of work.
S/ Fixing 18 mm. thick joint filler board in expansion joints including cost of all material, labour, T&P etc. required for proper completion of work.
Providing and fixing of 160 mm dia HDPE rigid pressure pipe 6 kg/m2 including cost of labour materials T&P etc proper completion of work as per direction of Engineer in charge.
M/S LALMANI MAURYA
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .