Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-Finance | L1 | Accepted-Finance OK | |
| 2 | L2₹10.0 L+₹14,171.92 (1.44%)Accepted-Finance 21 10 SHOP NO 1 SECTOR 3 MAHABINI DELHI 110085 | NORTH WEST | DELHI | 110085 | L2 | Accepted-Finance OK | |
| 3 | L3₹10.7 L+₹87,699.19 (8.91%)Accepted-Finance N A | NA | NA | 121004 | L3 | Accepted-Finance OK | |
| 4 | L4₹11.4 L+₹1.5 L (15.4%)Accepted-Finance 11 C GROUND FLOOR DYADER ENCLAVE VIKAS NAGAR ITTAM NAGAR WEST DELHI 110059 | WEST | DELHI | 110059 | L4 | Accepted-Finance OK | |
| 5 | L5₹12.5 L+₹2.7 L (27.3%)Accepted-Finance H NO 1863 64 H 4 JAHANGIR PURI DELHI 110033 | DELHI | NORTH WEST DELHI | DELHI | 110033 | L5 | Accepted-Finance OK |
Tender Value
₹16.7 L
EMD Value
₹33,346
Closing Date
27 Feb 2026, 3:00 pmClosed
Executive Engineer (E)
Executive Engineer (E) North West, Elect. Divn., PWD ISBT, Kashmere Gate, Delhi-110006
Consumer Forum, FU Block, DIET Pitampura, DDE Shalimar Bagh, DIET Keshavpuram and CFDL under NWESD-II,Pitampura Police Lines, Delhi.
2026_PWD_287419_1
198/EE(E)/NWED/PWD/2025-26
Open Tender
Electrical Works
Works
240 days
Pitampura
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹33,346
Yes
2 Mar 2026
20 Feb 2026
27 Feb 2026
20 Feb 2026
27 Feb 2026
20 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Comprehensive routine maintenance of Window / Split type ACs units of 1.0 / 1.5 / 2.0 TR capacity units of different makes installed at various locations as per inventory attached, i/c repairing / replacement of remote, capacitor running type, all types of defective parts,gun metal taps,electronic parts ,float valve assembly excluding topping up of refrigerant in compressor, refrigeration pipe, PCB for indoor/outdoor complete as per terms and conditions, and timing as per direction of Engineer -in- charge & wherever reqd.
(Note:- i) During the period of Summer Season & duration as specified by the Engineer-in-Charge ii) Maintaining of Complaints will be recorded by the agency in the AC Task/Complaint register)
(236 Units X 8 Months = 1888 Units) | 1,888 | Units | 214 | ₹4,04,032 |
| 2 | Complete servicing of WTAC/STAC/unit of 1/1.5 / 2.0 TR capacity including dismantling the AC from its existing position at various locations/grill/window cutting,washing with High pressure water spray electric machine,coil cleaning with D- Scaling Chemical, drying with air blower ,oiling, greasing of blower, fans. cleaning of evaporative and condensing coil with suitable chemical like coil cleaner, as required in its existing position complete etc. as required. | 236 | Nos. | 351 | ₹82,836 |
| 3 | Replacement of printed circuit assembly (PCB) of the Existing indoor Unit Split/WTAC AC 1.5/2.0 TR Complete with connection & Testing etc. as required at side in the machine as per requirement & approval of the Engineer-in-Charge. (Dismantled material shall be retained by the contractor) | 10 | Jobs | 6,094 | ₹60,940 |
| 4 | Replacement of printed circuit assembly (PCB) of the Existing Outdoor Unit Split AC/WTAC 1.5/2.0 TR with connection & Testing etc. as required at side in the machine as per requirement & approval of the Engineer-in-Charge. (Dismantled material shall be retained by the contractor) | 10 | Jobs | 5,925 | ₹59,250 |
| 5 | Repairing of PCB card of 1.5/2 TR capacity WTAC/split type AC unit having following capacity after dismantaling the defective card from AC unit & refixing the same i/c connections of electrical wires/cables & thimbles connection, testing & commissioning etc. complete as required. | 18 | Jobs | 3,057 | ₹55,026 |
| 6 | Supplying & charging of Refrigerant gas (R-22/32 as per requirement of AC unit) in the following type capacity AC units i/c leakage testing removing the leakage, pressure testing, flushing the complete system, vacuumising and gas charging complete as required. (Cost for gas & labour charges already included in the below mentioned item) (Note:- Quantity of gas filled shall be entered in Consumption Register maintained by the agency)
a) In 1.5 TR WTAC/STAC capacity | 120 | Jobs | 2,162 | ₹2,59,440 |
| 6.1 | b) In 2.0 TR WTAC/STAC capacity | 55 | Jobs | 2,719 | ₹1,49,545 |
| 7 | Dismantling of existing suitable 1.5 TR/2.0 TR capacity WTAC unit & both indoor & outdoor in case of STAC etc. with equipments complete as reqd. | 15 | Jobs | 562 | ₹8,430 |
| 8 | Re-installation of WTAC unit in the existing window i/c modification in the window, sealing the gap with ply etc. as required at site of work. | 15 | Jobs | 2,072 | ₹31,080 |
| 9 | Supplying and replacement of following parts including removal of un-serveceable part, electrical connections & re-installation the same, testing, commissioning etc. as required. (Labour & gas charges already included in below mentioned item.)
a) Rotary Compressor 1.5 Ton including less for old credit | 10 | Nos. | 8,398 | ₹83,980 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.80 MB
BOQ_380820.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .