| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st lowest₹59.6 LAccepted-AOC AT WORDNO 15 PS BOUCH TOAN DIST BOUCH PIN 762014 | BOUDH | ODISHA | 762014 | ₹59.6 L | 1st lowest | Accepted-AOC He is submitted EMD at the of agreement |
| 2 | 1st lowest₹59.6 LRejected-Finance | ₹59.6 L | 1st lowest | Rejected-Finance Disqualified |
| 3 | 1st lowest₹59.6 LRejected-Finance BARZ PATRA KHORCHA | ₹59.6 L | 1st lowest | Rejected-Finance Disqualified |
| 4 | 1st lowest₹59.6 LRejected-Finance | ₹59.6 L | 1st lowest | Rejected-Finance Disqualified |
| 5 | 1st lowest₹59.6 LRejected-Finance AT WORDNO 15 PS BOUCH TOAN DIST BOUCH PIN 762014 | BOUDH | ODISHA | 762014 | ₹59.6 L | 1st lowest | Rejected-Finance Disqualified |
Tender Value
₹59.6 L
EMD Value
₹72,090
Closing Date
10 Feb 2026, 5:00 pmClosed
EERW Division Boudh
O/o SERW Division Boudh
Construction of RI Office Cum Residence Building at Badigaon for the year 2024-25
2026_CERWI_125202_9
Online Tender17/SERW Division Boudh 2025-26
Open Tender
Civil Works - Buildings
270 days
O/o SERWDivision Boudh
Please refer DTCN
4 documents required · 4 mandatory
₹10,000
₹72,090
Yes
4 Jun 2026
30 Jan 2026
11 Feb 2026
30 Jan 2026
10 Feb 2026
30 Jan 2026
30 Jan 2026 - 9 Feb 2026
Earth work in excavation of foundation in hard soil with all leads and lifts including dressing and levelling the bed and depositing the excavated earth at place away from work site with all leads and lifts including cost of all labour T&P articles and dewatering if required for the work etc. complete as per specification and direction of the Engineer-in-charge. Ground Floor
Cycle stand
Approach road
Compound wall
Providing & filling good clean river sand of approved quality including watering to complete saturation & ramming complete including cost conveyance, royalty, additional charges, DMF 10% & EMF 5% over royalty Cess & taxes of all materials & cost of all labour & T&P required for the work etc complete as per specification & direction of Engineer-in Charge. Ground Floor
Cycle stand
Approach road
Compound wall
Filling foundation and plinth with excavated material moorum including watering and ramming as directed by Engineer-in-charge
Providing Cement concrete (1:3:6) in foundation upto a required depth below ground level and upto a required height above ground level/bed level using 4cm size hard granite metal of approved quality from approved quarry including hoisting, lowering, laying compacting in position in layers not exceeding 15cm thick compacting with proper packing to proper slope & level including watering, curing and cost, conveyance, Cess royality, additional charges, DMF 10% & EMF 5% over royalty taxes of all materials etc. with all labour and T&P required for the work including dewatering, shuttering if necessary complete as per direction of Engineer – in – charge Ground Floor
Cycle stand
Approach road
Compound wall
Flyash brick masonary in cement mortar (1:6) in foundation and plinth and basements and cemental floor bed plinth molding and similar such types of works with all necessary projections using flyash bricks of (23 cm x 11 cm x 8 cm) size having crushing strength not less than 75Kg. Per Sqcm. Including splays, cutting, circular moulding, chamfering corbelling watering curing for 7 days after immersing the bricks in water for six hours before use etc. complete including cost, conveyance of all materials and labour, royalty, cess with T&P required for the work with all taxes and royalties etc. with all T&P complete in all respect as per direction of the Engineer in charge. Ground Floor
Cycle stand
Compound wall
Flyash brick masonary in cement mortar (1:6) in SUPERSTRUCTURE and similar such types of works with all necessary projections using flyash bricks of (23 cm x 11 cm x 8 cm) size having crushing strength not less than 75Kg. Per Sqcm. Including splays, cutting, circular moulding, chamfering corbelling watering curing for 7 days after immersing the bricks in water for six hours before use etc. complete including cost, conveyance of all materials and labour, royalty, cess with T&P required for the work with all taxes and royalties etc. with all T&P complete in all respect as per direction of the Engineer in charge. Ground Floor
First Floor
Cycle stand
Compound wall
R.C.C. work M-25 in using 12mm size crusher broken hard granite chips including watering, curing, cenering and shuttering with all cost, additional charges, DMF 10% & EMF 5% over royalty taxes of all materials etc, cess with T&P, conveyance taxes etc. complete as per the direction of the Engineer-in-charge. Ground Floor column base
Ground Floor Plinth bend
Ground Floor Lintel
Ground Floor Chajja
Ground Floor Roof Slab
Ground Floor Beams and column
Ground Floor Staircase
First Floor Lintel
First Floor Chajja
First Floor Roof Slab
First Floor Beams and column
First Floor Fins
First Floor Staircase
Cycle stand column base
Cycle stand column
Cycle stand Plinth
Cycle stand Roof slab
Compound wall column base
Compound wall column
Compound wall Plinth
Supplying all materials, labour, T&P and providing M.S reinforcement for R.C.C work including cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the Engineer in charge Ground Floor
First Floor
Cycle stand
compound wall
Providing and fixing Marble tiles (above 0.1 Sqm. & upto 0.40 Sqm.) in floors, treads or steps and landing on 25 mm thick bed of cement mortar (1:1) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles as directed by the Engineer-in-charge. Ground Floor
First Floor
Providing and fixing Marble tiles (upto 0.10 Sqm.) in dados, skirtings and risers of steps on 12 mm thick cement plaster (1:3) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles as directed by the Engineer-in-charge. Ground Floor
First Floor
Providing and fixing Ceramic tiles in floors, treads or steps and landing on 25 mm thick bed of cement mortar (1:1) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles as directed by the Engineer-in-charge. Ground Floor
First Floor
Providing and fixing Ceramic tiles in dados, skirtings and risers of steps on 12 mm thick cement plaster (1:3) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles as directed by the Engineer-in-charge. Ground Floor
First Floor
Providing and fixing Vertified tiles in floors, treads or steps and landing on 25 mm thick bed of cement mortar (1:1) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles as directed by the Engineer-in-charge. Ground Floor
First Floor
Cycle stand
Providing and fixing Vertified tiles in dados, skirtings and risers of steps on 12 mm thick cement plaster (1:3) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles as directed by the Engineer-in-charge. Ground Floor
First Floor
12mm (1/2”) thick cement plaster (1:6) finished smooth to out side brick walls after cracking out of the joint including, watering and curing with cost and conveyance of all materials and labour, cess with T&P required for the work with all taxes and royalties , etc. complete in all respect in all floors as per direction of the Engineer in charge.Ground Floor
First Floor
Cycle stand
compound wall
16mm (5/8") thick cement plaster (1:6) finished smooth to inside surface of bricks walls/ stone masonary after racking out joints including watering and curing with cost and conveyance of all materials and labour, cess with T&P required for the work with all taxes and royalities etc completed in all respect in all floors as per direction of the Engineer-in-ChargeGround Floor
First Floor
Cycle stand
compound wall
Wall painting two coats with weather paint of approved shade on wall surface to give an even shade over a coat of primer including cost of brushes and putty including cost of paint scrapping, cleaing rubbing scaffloding with cost conveyance and taxes of all materials and labour with T&P and Cess required for the work etc, complete in all respect as per the direction of Engineer-in-Charge. Ground Floor
First Floor
Cycle stand
compound wall
Painting with oil bound cement primer including cost of the primer sand papering polishing the surface with cost conveyance and taxes of all materials and labour with T&P article required for the work etc. complete in all respect inclouding cost of paint or as per direction of the Engineer-in-charge.Ground Floor
First Floor
Cycle stand
Compound wall
Wall painting two coats with plastic Emulsion paint of approved quality & shade on new work to give an even shade with brush to interior walls surface after cleaning the surface including cost of plastic emulsion paint with cost, conveyance and taxes of all materials and labour with T&P required for the work with CESS etc complete as per direction of Engineer-in-Charge.Ground Floor
First Floor
Supplying,fitting and fixing of M.S. Window grill made out of M.S.Flat confirming to IS 2062/2006 as per design including cost of all materials with cost of conveyance, taxes, Cess etc. but excluding labour as per direction of Engineer-in-Charge.Ground Floor
First Floor
Painting of M.S. Window grill made out of M.S.Flat confirming to IS 2062/2006 with Red Oxide Primer as per design including cost of all materials with cost of conveyance, taxes, Cess etc. as per direction of Engineer-in-Charge.Ground Floor
First Floor
Painting 2 coat with any approved synthetic enamel paint over a coat of primer with brush to wood/iron work including cost, conveyance, taxes of all materials required for the work with all labour, T&P, Cess etc complete in all respect as per specification and direction of Engineer-in-ChargeGround Floor
First Floor
Finishing wall surface of walls with cement based wall putty one coat (Water based) of approved make and finished smooth and even surface to receive painting including cost conveyance and taxes of all materials and labour with T&P and Cess required for the work etc, complete in all respect as per the direction of Engineer-in-Charge. Ground Floor
First Floor
Supplying , fitting,fixing up window (sliding type) made up aluminium section 151-154, 151-155, as windows frame section No.151-155, 151-153 and 151-167 as shutter frame with 5mm thick black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of all materials all taxes labour, T&P etc. complete as per direction of the Engineer-in-charge. Ground Floor
First Floor
Providing, fitting, fixing of Aluminium Door with OEL anodized Aluminium door section of 9202 as vertical member, 9201 as top member and 9200 as bottom and middle member and 6mm thick black glass in top portion with 12mm thick pre-laminated board in bottom portion fixed on door frame by means of tappered clip No.4660 and the frame to be completed by means of jointing angle No.1855 including all cost of labour, T&P, hire charges of of drilling machine, labour charges etc. complete as per direction of Engineer-in-charge.Ground Floor
First Floor
Providing, fitting, fixing of Aluminium Door with OEL anodized Aluminium door section of 9202 as vertical member, 9201 as top member and 9200 as bottom and middle member and 12mm thick pre-laminated board fixed on door frame by means of tappered clip No.4660 and the frame to be completed by means of jointing angle No.1855 including all cost of labour, T&P, hire charges of of drilling machine, labour charges etc. complete as per direction of Engineer-in-charge. Ground Floor
First Floor
Providing, fitting, fixing of Stainless Steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with balustrade of size 32mmx32mmx2mm @ 0.90mtr C/C and staineless square pipe bracing of size 32mmx32mmx2mm in 3 rows in stair case asper approved design and specification,buffling polishing etc including all cost of labour, T&P, hire charges of of drilling machine, labour charges etc. complete as per direction of Engineer-in-charge. Ground Floor
First Floor
Providing, fitting, fixing up false ceiling of approved design and drawing in all floors with G.I Section on 4 walls to be fixed by means of steel screw and PVC plug and the G.l. grid to be suspended from ceiling by using 12.5mm thick Fire Line Gypsum Board including cost of all materials, all labour, all T&P etc. required for the work complete in all respect as per the direction of the Engineer-in-chargeGround Floor
First Floor
Providing, fitting, fixing up cornice made up fo gypsum of approved design and drawing in all floors to be fixed by means of steel screw and PVC plug and including cost of all materials, all labour, all T&P etc. required for the work complete in all respect as per the direction of the Engineer-in-chargeGround Floor
First Floor
Levelling of ground and filling good hard soil or gravelly soil within 50m. Initial lead and 1.5m. Initial lift including rough dressing and breaking clods to maximum 5cm.to 7cm. and laying in layers not exceeding 0.3 m. in depth asper direction of the Engineer-in-charge.Ground Floor
2.5 cm. thick grading concrete (1:2:2) on roof slab with 6mm. size hard granite chips on new work. First Floor
2.5 cm thick Damp Proof Coarse with cement concrete (1:2:4) using 12mm size Crusher broken granite chips as per direction of Engineer-in-charge. Cycle Stand
2.5 cm thick Damp Proof Coarse with cement concrete (1:2:4) using 12mm size Crusher broken granite chips as per direction of Engineer-in-charge. Compound wall
Cement concrete (1:2:4) with 12mm. Size hard broken granite chips (Crusher broken) including all cost, conveyance , royality etc. complete. APPRAOCH Road
Filling bitumen and cement and jute fibre in expansion joints inclusive of cost of materials, bitumen and cement proportion (3:1) including cleaning before pouring 12 mm to 25 mm and 15 cm depth etc complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.13 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
Tendernotice_2.pdf
PDF • 5.59 MB
BOQ_578301.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid