| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.7 LAccepted-AOC | ₹30.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹31.3 L+₹54,205.84 (1.76%)Rejected-AOC | ₹31.3 L+₹54,205.84 (1.76%) | L2 | Rejected-AOC L2 |
| 3 | L3₹31.8 L+₹1.1 L (3.66%)Rejected-AOC AMBEDKAR 3RD CROSS STREET ANNA SALAI ANNA SALAI 1ST CROSS STREET AMBED | ERODE | TAMIL NADU | 638001 | ₹31.8 L+₹1.1 L (3.66%) | L3 | Rejected-AOC L3 |
| 4 | L4₹32.9 L+₹2.2 L (7.02%)Rejected-AOC F1A 1ST FLOOR PLOT NO 26 SRI GANESA APARTMENTS RAVANAN NAGAR 4TH STREET PUZHUTHIVAKKAM MADIPAKKAM CHENNAI 600 091 | CHENNAI | TAMIL NADU | 600091 | ₹32.9 L+₹2.2 L (7.02%) | L4 | Rejected-AOC L4 |
| 5 | L5₹32.9 L+₹2.2 L (7.19%)Rejected-AOC | ₹32.9 L+₹2.2 L (7.19%) | L5 | Rejected-AOC L5 |
Tender Value
₹40.2 L
EMD Value
₹40,500
Closing Date
10 Aug 2026, 3:00 pmClosed
Zonal Officer-9
Greater Chennai Corporation, Zone-9, Nungambakkam, Chennai -600034
Development work of south shivaji OSR park at dn-117,unit- 26, zone-09
2026_CoC_687432_1
Z.O.IX.C.No.E1/1550/2026
Open Tender
Civil Works
Works
270 days
Chennai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹40,500
20 Aug 2026
21 Jul 2026
11 Aug 2026
21 Jul 2026
10 Aug 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting in clusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. (Excluding Refilling) | - | CUM | 199.33 | - |
| 2 | Supplying and filling in foundation, basement, etc with filling crushed stone dust (Quarry dust) in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | - | CUM | 391.95 | - |
| 3 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers - Mixing by mechanical means | - | CUM | 5,756.01 | - |
| 4 | Brick work in following Cement Mortar using best quality Burnt Clay Brick of size 9” x 4 3/8” x 2 3/4” with class designation of 10 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers.
Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. In Cement Morter 1:5 | - | CUM | 7,935.89 | - |
| 5 | Painting New Plastered Wall Surface with Two finishing coats of ready mixed (Emulsion) of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) | - | SQM | 201.05 | - |
| 6 | Supplying and laying of Interlocking Paver Block Stone 63mm thick Over a base layer of crushed stone sandfilling incl. Cost of materials laying and Labour charges etc complete complying with the standard specification and as directed by the departmental officers. | - | SQM | 1,542.24 | - |
| 7 | Granite Slabs (Super Fine Polished with Machine Cut Edges) of sizes 4x2 and above 18mm to 20mm thick - Flamed Ruby Red Granite Slab 1200mm x 600mm, 16mm to 18mm Thick | - | SQM | 1,946 | - |
| 8 | Supplying And Fixing of Rubber Moulded Grey Premium Concrete Kerb of Size 450X125X300mm Using M30
Concrete. The Concrete Shall Be Moulded By Table Mount Vibrated With Polypropylene Fibers At 5% And Curing Compound. The Rate Shall Include Cost of Materials Transportation Loading Unloading Charges And All Taxes Including Necessary Earth Work Pointing With cm. 1:3 To Full Depth Curing Thread Lining Etc Complete . | - | MTR | 871.01 | - |
| 9 | Supply and fixing of Swing 2-Seater with Rubber Seat: A-Frame :1 ½ Galvanished B class pipe Top Rail : 2 Galvanished C Class Pipe Seats : Rubber Chain : 8mm Stainless Steel Chain (Grade-304) Painting with PU coating Product area: 10ft * 9ft Play area :15ft * 15ft | - | EACH | 37,930 | - |
| 10 | Supply and fixing of See-Saw 4 Seater FRP: Height :1 ½ ft Width :5ft Frame : 1 ½ Galvanished B Class pipe See saw Rail :2 Galvanished C Class pipe Seat : FRP Seat with 450 CSM Mat 3 Layers bonding. Isotolic gel coat with UV pigment. Painting with PU coating seat size : 15ft * 14ft Product area : 5ft * 10ft Play area:8ft * 12ft | - | EACH | 22,263 | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
1550TBOOK.pdf
Tender Documents • 1.71 MB
BOQ_826266.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .