| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-Finance ASSOLNA SOUTH GOA | SOUTH GOA | GOA | 403802 | ₹1.6 Cr | L1 | Accepted-Finance Financially Successful Bid |
| 2 | L2₹1.7 CrRejected-Finance 341 VITHALAPUR SANQUELIM GOA | ₹1.7 Cr | L2 | Rejected-Finance Financially Unsuccessful Bid |
Tender Value
₹1.7 Cr
EMD Value
₹3.3 L
Closing Date
6 Jul 2026, 3:00 pmClosed
Executive Director
1st Floor, Atal Stadium, Cujira, St Cruz, Goa
Construction of Players Changing rooms and laying of synthetic artificial turf for existing Futsal Ground at Tivrem Orgao, Marcel, Goa
2026_TSAG_29885_1
SAG/EE-ED/TECH/F08/26-27/891
Open Tender
Miscellaneous Works
Percentage
180 days
Tivrem Orgao, Marcel
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹3.3 L
20 Jul 2026
22 Jun 2026
7 Jul 2026
22 Jun 2026
6 Jul 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. a) All kinds of soil | 362 | cum | 291 | ₹1,05,342 |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 113 | Cum | 2,211 | ₹2,49,843 |
| 3 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: (a)All works upto plinth level | 86 | Cum | 6,810 | ₹5,85,660 |
| 4 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge. | 20 | cum | 245 | ₹4,900 |
| 5 | Supplying and filling in plinth under floors, trenches including watering ramming consolidating, dressing complete. b) Moorum | 59 | Cum | 662 | ₹39,058 |
| 6 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. | 110 | Cum | 5,186 | ₹5,70,460 |
| 7 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand). laterite masonry in all sizes in superstructure from floor I level upto floor V level. | 58 | Cum | 6,115 | ₹3,54,670 |
| 8 | Half brick masonry in cement mortar 1:3 (1 cement : 3 coarse sand) with bricks of class designation 75 kg /cm2. b) Upto floor V level. | 40 | Sqm | 1,198 | ₹47,920 |
| 9 | 12mm cement plaster 1:4 (1 cement : 4 fine sand) | 447 | Sqm | 223 | ₹99,681 |
| 10 | 18mm cement plaster in two coats under layer 12mm thick cement plaster 1:5 ( 1 cement : 5 coarse sand) and top layer 6mm thick with cement plaster 1: 3 (1 cement : 3 coarse sand) finished with sponge. | 633.63 | sqm | 329 | ₹2,08,464.27 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
Tendernotice_2.pdf
PDF • 0.44 MB
BOQ_30308.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].