Construction of outlets on Rapti Main Canal in between Km 6.600 to Km 21.00 in District Shrawasti.
2026_UPIDC_1167986_1
01/SE-IX/2026-27
Open Tender
Civil Works
270 days
BHINGA, SHRAWASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,795
₹4.7 L
IX CIRCLE IRRIGATION WORKS BAHRAICH
13 Jul 2026
13 Jul 2026
27 Jul 2026
13 Jul 2026
27 Jul 2026
13 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation in all type of soil with back filling and proper disposal of surplus earth including all lead & lift, levelling, dressing and manual compaction etc required for proper completion of work. | 60,218.97 | M3 | 125 | ₹75,27,371.25 |
| 0.0 | Laying P.C.C in 1:3:6 with cement, Hamirpur coarse sand F.M. not less than 2.00 and 20 to 40mm crushed Kabrai stone ballast with mixing, ramming, laying, curing etc. including all cost of material, labour, T&P etc. required for proper completion of work | 217.43 | M3 | 10,559.86 | ₹22,96,030.36 |
| 0.0 | Laying C.C in 1:2:4 with cement, Hamirpur coarse sand F.M. not less than 2.00 and 10 to 20mm crushed Kabrai stone grit with mixing, ramming, vibration laying, curing etc. including all cost of material, labour, T&P etc. required for proper completion of work | 31.81 | M3 | 11,406.4 | ₹3,62,837.58 |
| 0.0 | Centering & Shuttering for C.C work with cost of Shuttering including all cost of material, labour, T&P etc required for completion of work. | 866.04 | M2 | 400 | ₹3,46,416 |
| 0.0 | Laying R.C.C 1:1.5:3 with cement , Hamirpur coarse sand and 4.75 to 20mm Crushed Kabrai stone grit with mechanical mixing, vibration, laying, curing etc. including all cost of material, labour, T&P etc. required for proper completion of work. | 344.69 | M3 | 11,873.77 | ₹40,92,769.78 |
| 0.0 | Centering & Shuttering for RCC work with cost of Shuttering including all cost of all material, labour, T&P etc required for completion of work. | 1,729.68 | M2 | 400 | ₹6,91,872 |
| 0.0 | Steel Reinforcement (Fe 415 TMT bar) for R.C.C work of SAIL or TATA only including cutting, bending, binding and placing of reinforcement in proper position with cost of binding wire and cost of steel including all cost of material, labour, T&P etc. required for proper completion of work | 1 | MT | 88,662 | ₹88,573.34 |
| 0.0 | Dewatering for excavation of foundation & C.C work with all cost of power, P.O.L, machines, pump, well point system and operator etc with assembling and deassembling of machines etc required for proper completion of work | 19,396 | KwH | 59.93 | ₹11,62,402.28 |
| 0.0 | Supplying & laying RCC Hume pipe (NP3)300mm dia with collar including sealing/jointing with suitable materials, cartage charge and including all cost of material labour, T&P etc required for proper completion of work. | 800 | RM | 1,315.4 | ₹10,52,320 |
| 0.0 | Earth work in making Ringbund /coffer dam /embankment/dowla / ramp in all type of soil including all lead & lift, levelling, dressing to profile and manual compaction etc required for proper completion of work. | 24,567.5 | M3 | 118 | ₹28,98,965 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
LOT01.pdf
Tender Documents • 5.23 MB
BOQ_2190547.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid