| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.7 LAccepted-AOC L D A COLONY SUB E W S PADAV SECTOR KANPUR ROAD LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | ₹44.7 L | L1 | Accepted-AOC accepted L1 |
| 2 | L2₹53.7 LRejected-Finance 12 ATRAULI KHERA PATAN SARAI DHODA ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹53.7 L | L2 | Rejected-Finance Reject L2 |
Tender Value
₹79.2 L
EMD Value
₹6 L
Closing Date
19 Feb 2026, 12:00 pmClosed
OFFICE OF THE SE ALIGARH CIRCLE PWD ALIGARH
OFFICE OF THE SE ALIGARH CIRCLE PWD ALIGARH
New Construction work of Atrauli Rajwaha in km-3 to Usmanpur link road
2026_CEALG_1111288_8
349-Cashier (P.D.A)-A.C-25-26 dt-20.01.2026
Open Tender
Civil Works
180 days
OFFICE OF THE EE PD PWD ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹6 L
Yes
8 Apr 2026
31 Jan 2026
19 Feb 2026
31 Jan 2026
19 Feb 2026
31 Jan 2026
Part-A (Bituminous Work) Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. as per direction by E/I
Providing, laying and spreading Material on a prepared sub grade, adding cement @ 2% by weight to the spread Material manually, mixing in place with rotavator and compecting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base. & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. (Including cost of Cement) as per direction by E/I
Providing, laying and spreading Material on a prepared sub base, cement @ 4% by weight to the place with rotavator and compecting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. &including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. (Including cost of Cement) as per direction by E/I
Providing and applying Tack coat with bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503 & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. (Including cost of Bitumen) as per direction by E/I
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type-C as per Technical Specification Clause 508. &including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. (Including cost of Bitumen) as per direction by E/I
Providing, laying seal coat sealing the voids in a bitumenious surface laid to the specified levels, grade and cross fall using Type 'C' as per Technical Specification Clause 510. & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. (Including cost of Bitumen) as per direction by E/I
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Local Earth) & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. as per direction by E/I
Part-B (H.P. Culvert Work) Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. as per direction by E/I
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203.( Nominal mix 1:3:6) M10 &including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. as per direction by E/I
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications Clause no.600,1202&1203 & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. as per direction by E/I
Supply, laying and fixing of NP4 class 600 mm dia hume pipes in proper position in culvert. & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. as per direction by E/I
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204 &including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. as per direction by E/I
Plastering with cement mortar (1:4), 12 mm thick on brickwork in substructure as per technical specification clauses 613 & 1204 & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. as per direction by E/I
White washing with lime on undecorated wall surfaces (Three coats) to give an even shade including thoroughly brooming the surface to remove all dirt, dust mortar drops and loose scales of lime wash and other foreign matters.. as per DSR 13.37.1 &including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. as per direction by E/I
Routine Maintenance of road for 05 Years after the competion of work (Vide shasanadesh No. 17/2024/सा0-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & letter No. 36890C/RMC/Mool-23-24 Dated 17.02.2024 of ENC PWD. Rate Excluding of G.S.T.) 1-1st Year @ Nill
2nd Year @ 0.75%
3rd Year @ 1.50%
4th Year @ 2.25%
5th Year @ 3.00%
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_2052893.pdf
BOQ Comparative Chart
xlsx
finsummary_2052893.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.34 MB
BOQ_2052893.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid