Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.7 LAccepted-AOC H NO 309 26 MANOHAR NAGAR GURUGRAM 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | ₹11.7 L | L1 | Accepted-AOC Lowest bidder (negotiated rate) |
| 2 | L2₹12.2 L+₹52,770.50 (4.51%)Rejected-Finance | ₹12.2 L+₹52,770.50 (4.51%) | L2 | Rejected-Finance Not the lowest bidder |
Tender Value
₹12.7 L
EMD Value
₹25,371
Closing Date
26 Feb 2026, 5:00 pmClosed
VIMAL DEEP
DIV 1 Gurugram
Construction of 2 Nos Rain Water Harvesting System in Office Building, HSVP Sector-14 Gurugram.Providing and Fixing M.S Clamp, Earth work, Brick work and Cement Plaster and all other works contingent thereto
2026_HBC_503642_1
2026375E36AE E0A8 426B 9B48 049FBDC84B4F252HSV
Open Tender
Civil Works
Works
90 days
Gurugram
2 documents required · 2 mandatory
₹500
₹25,371
Yes
27 Apr 2026
18 Feb 2026
27 Feb 2026
18 Feb 2026
26 Feb 2026
18 Feb 2026
[2.B0041] B0041. Twisted steel/ deformed TMT bars Fe-500D [Rate]
[2.B2015] B2015. Stone Boulder 50 mm to 200 mm [Rate]
[2.B2016] B2016. Gravel 5 mm to 10 mm [Rate]
[2.PH172] PH172. HDPE Pipe (PE-80 grade and PN-4 for sewer application)-200 mm outer diametre [Rate]
[2.RM005] RM005. Coarse sand at Site [Rate]
[20.7.9]Stringing out A.C./P.V.C pipes and specials casting along trenches and laying the same in trenches, to correct alignment and gradients including cartage from divisional stores or nearest railway station to site of works and return of pieces of pipes to stores. 9. 300 mm internal diameter of pipe line laid complete [Through Rate]
[21.28]Providing and fixing steel bar embedded plastic steps of size 263mm x 165mm of orange colour, confirming to specification in pump chambers, manholes etc., having minimum 3mm thick polypropylene polymer confirming to is:10910 encapsulated on 12mm dia ribbed steel bars per IS :1786. The rate include cost of setting the same to correct lines and levels duly embedded in 1:2:4 cement concrete including carriage, loading, uploading, stacking, handling, re-handling etc., complete in all respect to the satisfaction of Engineer-in-charge [Through Rate]
[21.87.1.2]Constructing brick masonry road gully chambers as per standard drawings (as per sizes given below) including dressing of beds and sides of chambers to exact profiles, 15cm thick lime concrete 16:24:100 (as per specified in item No.10.6) in foundations 1st class brick work laid in cement sand mortar 1:5, 40 mm thick cement concrete 1:2:4 topping inside the chamber with a floating coat of 1.5mm thick neat cement laid in one operation to the topping, the entire inner surface of the chamber rendered with neat cement not less than 12mm in thickness of 1:2 cement sand plaster and finished with floating coat of neat cement 1 mm thick left absolutely smooth polished and correct to templates including labour for fixing the C.I. road gully grating and frame including painting with coal tar (as Specified in item No. Item 21.48) complete to the requirement of the Engineer in-charge 1.2. Single road gully chamber - Size.-610 mmx457 mmx1105mm [Through Rate]
[21.93.1]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening [Through Rate]
[3.1.1]By Mechanical Transport including loading, unloading and stacking 1. Lime, moorum, building rubbish [5km]
[33.15]Gravel packing in tube well construction in accordance with IS: 4097, including providing gravel fine/ medium/ coarse, in required grading and sizes as per actual requirement, all complete as per direction of Engineer-in-charge. [Through Rate]
[33.17.2]Providing and fixing M.S. clamp of required dia to the top of casing/ housing pipe of tube well as per IS: 2800 (part I), including necessary bolts and nuts of required size complete. 2. 150 mm clamp [Through Rate]
[33.19]Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by `V` notch method or any other approved method, measuring static level and draw down etc. by step draw down method, collecting water samples and getting tested in approved laboratory, i/c disinfection of tube well, all complete, including hire and labour charges of air compressor, tools and accessories etc., all as per requirement and direction of Engineer-in-charge. [Through Rate]
[33.6.1.1]Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire and running charges of all equipments, tools, plants and machineries required for the job, all complete as per direction of Engineer-in-charge, up to 90 metre depth below ground level. 1.1. All types of soil 300 mm dia [Through Rate]
[33.8.2]Supplying, assembling, lowering and fixing in vertical position in bore well, Unplasticised PVC medium well casing (CM) pipe of required dia, conforming to IS: 12818, including required hire and labour charges, fittings and accessories etc. all complete, for all depths, as per direction of Engineer -in-charge. 2. 150 mm nominal size dia [Through Rate]
[4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate]
[4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. [Through Rate]
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.11.1]12 mm thick cement plaster damp-proof course 1:3 with 2 coats of bitumen at 1.65 kg. per sqm, laid hot and sanded: 1. Vertical [Through Rate]
[6.16]Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate]
[6.22.1.2]Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. 1.2. All works above plinth and up to floor IV level : M-15 grade plain cement concrete (cement content considered @ 240 kg/cum) [Through Rate]
[6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform [Through Rate]
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate]
[7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate]
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_582333.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .