| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹8.7 L+₹13,000 (1.53%)Admitted-Finance GURU RAM DAS NAGAR SRI SAI VIHAR COLONY ALIGARH ALIGARH ALIGARH UTTAR PRADESH 202001 | ALIGARH | UTTAR PRADESH | 202001 | L2 | Admitted-Finance | |
| 3 | L3₹8.7 L+₹18,200 (2.14%)Admitted-Finance 154 A BARASIROHI NEAR IIT KANPUR KALYANPUR KANPUR NAGAR UTTAR PRADESH 208016 | KANPUR NAGAR | UTTAR PRADESH | 208016 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ELECTRO POWER SERVICES AND SOLUTIONS L3 | AR Electricals & Hardware L2 | exSel Corporation L1 |
|---|---|---|---|---|---|---|
| 1.00 | Rectification and revamp of existing SCADA System with SCADA HMI repair work, troubleshooting & rectification of existing Sub-station automation SCADA system for Digital and Analog data, alarm, event at 132kV S/s Mishrikh of UPPTCL.
The following works are including for healthy SCADA communication. (a)Checking of all required events, alarms, numerical dates, status and signals to SCADA from various bays & feeders
(b)Modification of SCADA system of old and existing bays based on requirement
(c)Replacing the defective CAT-5/LAN cables and checking its healthiness
(d)Checking the healthiness of all protection relay's communication to SCADA | 1 | Set | 1,50,000 ₹1,50,000 | 1,49,500 ₹1,49,500 | 1,49,000 ₹1,49,000 Lowest |
| 2.00 | Supply of SCADA cum Gateway Server with latest configuration for configuration, testing and commissioning of Gateway System at 132KV S/S Mishrikh of UPPTCL.
Advantech/equivalent make with Intel Core i3-12500, 16 GB RAM, Windows 10 OS, 512TB SSD, USB (6 Ports), RJ45 (2 Ports Rear), Single Power Supply
License Software - Windows OS + Antivirus | 1 | No. | 99,500 ₹99,500 | 99,000 ₹99,000 | 98,000 ₹98,000 Lowest |
| 3.00 | Following work to be carried out for SLDC-Lucknow & ALDS-Modipuram:
(a) Complete configuration and testing of Gateway as per the signal list and parameter provided by client to transfer the data on IEC-104
(b) Programming and resetting of communication of link of Gateway from data transfer as per IP address provided by UPPTCL
(c) Checking and verification of data for both stream
(d) Complete testing of Gateway and validation of real time data as per existing signal list
(e) Complete checking of SAS gateway panel included architecture and settings. | 16 | Bay | 28,000 ₹4,48,000 | 28,000 ₹4,48,000 | 27,800 ₹4,44,800 Lowest |
| 4.00 | Complete Configuration and testing of 1 no. of 132 KV new line protection bay and its integration in existing SCADA System and Gateway at 132KV Sub-station Mishrikh. | 1 | Set | 1,30,000 ₹1,30,000 | 1,28,000 ₹1,28,000 | 1,25,000 ₹1,25,000 Lowest |
| 5.00 | Supply of FO cable/patch cord/LIU/Cat6 Cable and its related hardware, splicing work to complete the network communication for smooth execution of Gateway system.
(a) Replacing the defective CAT-5/LAN cables and checking its healthiness
(b) Rectifying communication healthiness of Gateway
(c) Checking the healthiness of all protection relay's communication to Gateway
(d) Checking the healthiness of existing IEC 61850-7 Ethernet switch in existing panel, however, in case of any faulty ethernet switch, same shall be arranged by UPPTCL for completion of work. | 1 | Set | 30,000 ₹30,000 | 28,000 ₹28,000 | 23,000 ₹23,000 Lowest |
| 6.00 | Mapping/Configuration of ICD/CID files as per the existing scheme for all 132 KV & 33 KV feeders for schematics and field signals work includes IEC-61850 base BCUs/relay variables, dataset configuration, Report control Block etc for gateway configuration. | 1 | Bays | 13,000 ₹13,000 | 12,800 ₹12,800 | 12,500 ₹12,500 Lowest |
Tender Value
Refer Docs
EMD Value
₹10,500
Closing Date
19 Mar 2026, 6:00 pmClosed
SE ETC Shahjahanpur
Electy Trans Circle Shahjahanpur
Work
2026_UPTCL_1115470_2
Very Short Term E. Tender No. 83ETC(S)/2025-26
Open Tender
Electrical Works
Fixed-rate
60 days
Sitapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
A/c No. 0423002100107147 IFSC Code No. PUNB0042300
₹10,500
18 Jun 2026
7 Mar 2026
20 Mar 2026
7 Mar 2026
19 Mar 2026
7 Mar 2026
7 Mar 2026 - 12 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Rectification and revamp of existing SCADA System with SCADA HMI repair work, troubleshooting & rectification of existing Sub-station automation SCADA system for Digital and Analog data, alarm, event at 132kV S/s Mishrikh of UPPTCL.
The following works are including for healthy SCADA communication. (a)Checking of all required events, alarms, numerical dates, status and signals to SCADA from various bays & feeders
(b)Modification of SCADA system of old and existing bays based on requirement
(c)Replacing the defective CAT-5/LAN cables and checking its healthiness
(d)Checking the healthiness of all protection relay's communication to SCADA | 1 | Set | - | - |
| 2 | Supply of SCADA cum Gateway Server with latest configuration for configuration, testing and commissioning of Gateway System at 132KV S/S Mishrikh of UPPTCL.
Advantech/equivalent make with Intel Core i3-12500, 16 GB RAM, Windows 10 OS, 512TB SSD, USB (6 Ports), RJ45 (2 Ports Rear), Single Power Supply
License Software - Windows OS + Antivirus | 1 | No. | - | - |
| 3 | Following work to be carried out for SLDC-Lucknow & ALDS-Modipuram:
(a) Complete configuration and testing of Gateway as per the signal list and parameter provided by client to transfer the data on IEC-104
(b) Programming and resetting of communication of link of Gateway from data transfer as per IP address provided by UPPTCL
(c) Checking and verification of data for both stream
(d) Complete testing of Gateway and validation of real time data as per existing signal list
(e) Complete checking of SAS gateway panel included architecture and settings. | 16 | Bay | - | - |
| 4 | Complete Configuration and testing of 1 no. of 132 KV new line protection bay and its integration in existing SCADA System and Gateway at 132KV Sub-station Mishrikh. | 1 | Set | - | - |
| 5 | Supply of FO cable/patch cord/LIU/Cat6 Cable and its related hardware, splicing work to complete the network communication for smooth execution of Gateway system.
(a) Replacing the defective CAT-5/LAN cables and checking its healthiness
(b) Rectifying communication healthiness of Gateway
(c) Checking the healthiness of all protection relay's communication to Gateway
(d) Checking the healthiness of existing IEC 61850-7 Ethernet switch in existing panel, however, in case of any faulty ethernet switch, same shall be arranged by UPPTCL for completion of work. | 1 | Set | - | - |
| 6 | Mapping/Configuration of ICD/CID files as per the existing scheme for all 132 KV & 33 KV feeders for schematics and field signals work includes IEC-61850 base BCUs/relay variables, dataset configuration, Report control Block etc for gateway configuration. | 1 | Bays | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_2090730.xls
BOQ • 0.27 MB
report.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .