Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.5 LAdmitted-Finance NA | PALWAL | HARYANA | 121004 | +0.00% | ₹3.5 L | L1 | Admitted-Finance |
| 2 | L2₹3.5 L+₹4,265.06 (1.22%)Admitted-Finance VILL P O KAMALPUR P S SAGAR DIST SOUTH 24 PARGANAS | SOUTH 24 PARGANAS | WEST BENGAL | +1.22% | ₹3.5 L+₹4,265.06 (1.22%) | L2 | Admitted-Finance |
| 3 | L3₹3.8 L+₹28,946.44 (8.28%)Admitted-Finance 1 JOYRAMPUR JALA ROAD MAIL 42C SARADAMA UPANIBESH BEHALA KOLKATA 700060 | KOLKATA | WEST BENGAL | 700060 | +8.28% | ₹3.8 L+₹28,946.44 (8.28%) | L3 | Admitted-Finance |
Tender Value
₹3.5 L
EMD Value
₹7,000
Closing Date
16 Sept 2026, 11:00 amClosed
EXE ENGINEER
516 D H ROAD KOL-34
ARRANGEMENT FOR CONTRACTUAL LABOURS AND TEMPORARY VATS FOR WASTE FLOWERS ETC. DURING IMMERSION OF IDOLS OF DURGA PUJA, LAXMI PUJA, KALI PUJA, CHHAT PUJA ETC. AT DIFFERENT IMMERSION GHATS UNDER BR.-XIII
2026_KMC_1040933_1
KMC/XIII/115/01/26-27
Open Tender
CIVIL WORKS
Percentage
50 days
W-115
PLEASE REFER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹0
₹7,000
19 Sept 2026
8 Sept 2026
18 Sept 2026
8 Sept 2026
16 Sept 2026
8 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS(N) THATCH, MUD AND BAMBOO WORKS.(B).
MAINTENANCE WORKS?(11)Bamboo pile walling made of 65 mm to
75 mm dia. Bamboo (in single line) driven about half length into the
ground at very close spacing side by side including necessary
bamboo stays, ties, runners etc and lining the exposed portion with
sheets made form cut-drums fitted and fixed complete as per
direction. (Payment to be made on length of wall(c) With bamboos of
length above 2.40 m. and up to 3.00 m. each | 189 | METER | 1,207 | ₹2,28,123 |
| 2 | BUILDING WORKS(N) THATCH, MUD AND BAMBOO WORKS.(A).
ORIGINAL WORKS?.(10)Bamboo walling made of crushed bamboo
or split bamboo or bamboo twigs(kanchis) as directed and tied with
necessary stiffners of split bamboo (in pairs) made of 100mm dia.
Bamboo fitted and fixed complete (but excluding the cost of
supporting frame work) | 54.6 | SQUARE METER | 127 | ₹6,934.2 |
| 3 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem :
3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of
10% contractors profit and 1% Labour welfare cess which would be
admissible to the Contractors, but contractual percentage will not be
applicable. (II) The workersemployed on high rise building or any
structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 425 | EACH | 269.5 | ₹1,14,537.5 |
| 4 | Sub Total | - | - | - | - |
| 5 | GST 18% | 1 | Nos | - | - |
| 6 | CESS 1% | 1 | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
AddlSpc.pdf
Additional Documents • 3.53 MB
BOQ_2556264.xls
BOQ • 0.28 MB
TForm115012627.pdf
Tender Documents • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .