Tender Value
₹1.4 Cr
EMD Value
₹2.7 L
Closing Date
8 Oct 2026, 6:00 pm7d left
Sr. DGM RIICO Bhilwara
Sr. DGM RIICO Bhilwara
Survey Demarcation Construction of Road and CD Works and Construction of Boundary wall at Industrial area IGP Sakriya District Chittorgarh
2026_RIICO_600614_1
2026-27/24
Open Tender
Civil Works
Percentage
150 days
Bhilwara
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
RIICO
₹2.7 L
28 Sept 2026
28 Sept 2026
9 Oct 2026
29 Sept 2026
8 Oct 2026
29 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 2, Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead in a 50 meter including stacking of useful material if available :, Ordinary rock | 88.74 | Cum | 268 | ₹23,782.32 |
| 2 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level., 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 16.41 | Cum | 3,302 | ₹54,185.82 |
| 3 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix | 71.34 | Cum | 4,934 | ₹3,51,991.56 |
| 4 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | 696.33 | Sqm. | 157 | ₹1,09,323.81 |
| 5 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) Thermo-mechanically Treated bars (Conforming of relevent IS code) | 2,800.49 | Kg. | 77 | ₹2,15,637.73 |
| 6 | Painting exterior surface of Wall with 100% acrylic exterior paint of approved brand and manufacture to give an even shade with two or more coats including prepartion of base with sand papering, primer, putty, etc complete in all respect including scaf External Painting | 503.95 | Sqm | 123 | ₹61,985.85 |
| 7 | Lettering with black Japan paint of approved brand and manufacture. | 48,600 | P. Letter Per cm. height | 2 | ₹97,200 |
| 8 | Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and MoRTH Specification Clause 807 | 22 | Each | 418 | ₹9,196 |
| 9 | Clearing and Grubbing Road Land, Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201., By Mechanical Means, In area of non-thorny jungle | 6.83 | Hectare | 12,513 | ₹85,463.79 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_1064928.xls
BOQ • 0.45 MB
tdsakriya.pdf
Tender Documents • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .