Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.4 LAccepted-Finance | ₹22.4 L | L1 | Accepted-Finance Low rate |
| 2 | L2₹25.6 L+₹3.2 L (14.3%)Rejected-Finance GRAM SHAHAJHPUR NINAIYAN TEHSIL AKBARPUR KANPUR DEHAT 209115 | KANPUR DEHAT | UTTAR PRADESH | 209115 | ₹25.6 L+₹3.2 L (14.3%) | L2 | Rejected-Finance High rate |
| Sl No | Description | Qty | Unit | M/S GARIB NAWAJ AND COMPANY L2 | M/S SURAJ PRASAD DWEVEDI AND SONS L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in dry ordinary (Loam, clay or sand) including lift upto 1.5 m and lead upto 30 m and including filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the engineer in charge upto a distance of 30 m from the foundation trench.(i) For Structures (Canal VRB, DRB, PRB and other hydraulic structure) | 344.18 | M³ | 100 ₹34,418 | 67.83 ₹23,345.73 Lowest |
| 2.00 | Earth work in cutting or in embankment in ordinary Soil, excavation to be in the form of irregular pits and earth work in embankment to be in 20 cm layers, including ramming and dressing the surface to the required level and slopes and also including 1.5 m lift and 30 m lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank within 30 m distance as directed by the Engineer-in-Charge.(i) In main and Branch above 30 cumecs discharge | 4,483.13 | M³ | 1 ₹4,483.13 Lowest | 54.55 ₹2,44,554.74 |
| 3.00 | Hiring Charges for diesel pump (5HP) including operator and p.o.l. | 300 | Per Hour | 125 ₹37,500 | 113.52 ₹34,056 Lowest |
| 4.00 | Centering & Shuttering of CC Work including rent of shuttering material, labour and T&P required for proper completion of work | 204.1 | M² | 1,000 ₹2,04,100 | 577.96 ₹1,17,961.64 Lowest |
| 5.00 | Providing and Laying Cement Concrete in 1:2:4 (M15) with [cement : coarse sand (Fineness Modulus not less than 2.25) : 40 mm gauge stone grit] with mechanical mixing & proper curing including all materials, labour, T&P etc. but excluding the cost of necessary centering and shuttering as per direction of Engineer-in-Charge. | 110.79 | M³ | 6,500 ₹7,20,135 | 5,330.69 ₹5,90,587.15 Lowest |
| 6.00 | Class 150 brick work in 1:4 cement and coarse sand mortar including supply of all materials, labour and tools and plants etc., required for proper completion of the work. | 143.47 | M³ | 6,500 ₹9,32,555 | 5,047.6 ₹7,24,179.17 Lowest |
| 7.00 | Pointing on brick work with cement mortar 1:3(1 cement : 3 fine sand): with all labour materials T&P. | 287.19 | M² | 100 ₹28,719 Lowest | 220.42 ₹63,302.42 |
| 8.00 | R.C.C works with cement, approved coarse sand (Fineness Modulus not less than 2.25) and 20mm gauge approved stone ballast conforming to Grade of concrete not less than (M20, 1:1.5:3), with mechanical mixing & mechanical vibration and proper curing excluding supply of reinforcement and binding the same with 24 BWG binding wire and necessary centering and shuttering etc. but including supply of all materials, labour, tools and plants etc. required for proper completion of work as per direction of Engineer-in- Charge. | 66.27 | M³ | 8,000 ₹5,30,160 | 5,699.29 ₹3,77,691.95 Lowest |
| 9.00 | Supplying and placing in position of Reinforcement including cutting, bending, binding (with 16 SWG binding wire) and including labour, tools & plants, carriage, loading unloading and stacking of all materials at site for proper completion of works at all respect. | 0.89 | MT | 70,000 ₹62,300 | 58,496.82 ₹52,062.17 Lowest |
| 10.00 | Supplying and fixing in position of wheel guard including all labour materails T&P. | 4 | Nos | 1,000 ₹4,000 Lowest | 1,201.63 ₹4,806.52 |
Tender Value
₹30.4 L
EMD Value
₹3.0 L
Closing Date
25 Feb 2026, 11:00 amClosed
Executive Engineer
Office of the Executive Engineer Irrigation Division Kanpur Dehat
Construction of Tailwall cum VRB of Kansua dy at km 27.206
2026_UPIDC_1109704_2
06/EE/2025-26
Open Tender
Civil Works
Item Rate
90 days
Irrigation Division Kanpur Dehat
as per tender condition
2 documents required · 2 mandatory
₹2,714
₹3.0 L
6 Jul 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in dry ordinary (Loam, clay or sand) including lift upto 1.5 m and lead upto 30 m and including filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the engineer in charge upto a distance of 30 m from the foundation trench.(i) For Structures (Canal VRB, DRB, PRB and other hydraulic structure) | 344.18 | M³ | 92 | ₹31,664.56 |
| 2 | Earth work in cutting or in embankment in ordinary Soil, excavation to be in the form of irregular pits and earth work in embankment to be in 20 cm layers, including ramming and dressing the surface to the required level and slopes and also including 1.5 m lift and 30 m lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank within 30 m distance as directed by the Engineer-in-Charge.(i) In main and Branch above 30 cumecs discharge | 4,483.13 | M³ | 74 | ₹3,31,751.62 |
| 3 | Hiring Charges for diesel pump (5HP) including operator and p.o.l. | 300 | Per Hour | 154 | ₹46,200 |
| 4 | Centering & Shuttering of CC Work including rent of shuttering material, labour and T&P required for proper completion of work | 204.1 | M² | 784 | ₹1,60,014.4 |
| 5 | Providing and Laying Cement Concrete in 1:2:4 (M15) with [cement : coarse sand (Fineness Modulus not less than 2.25) : 40 mm gauge stone grit] with mechanical mixing & proper curing including all materials, labour, T&P etc. but excluding the cost of necessary centering and shuttering as per direction of Engineer-in-Charge. | 110.79 | M³ | 7,231.1 | ₹8,01,133.57 |
| 6 | Class 150 brick work in 1:4 cement and coarse sand mortar including supply of all materials, labour and tools and plants etc., required for proper completion of the work. | 143.47 | M³ | 6,847 | ₹9,82,339.09 |
| 7 | Pointing on brick work with cement mortar 1:3(1 cement : 3 fine sand): with all labour materials T&P. | 287.19 | M² | 299 | ₹85,869.81 |
| 8 | R.C.C works with cement, approved coarse sand (Fineness Modulus not less than 2.25) and 20mm gauge approved stone ballast conforming to Grade of concrete not less than (M20, 1:1.5:3), with mechanical mixing & mechanical vibration and proper curing excluding supply of reinforcement and binding the same with 24 BWG binding wire and necessary centering and shuttering etc. but including supply of all materials, labour, tools and plants etc. required for proper completion of work as per direction of Engineer-in- Charge. | 66.27 | M³ | 7,731 | ₹5,12,333.37 |
| 9 | Supplying and placing in position of Reinforcement including cutting, bending, binding (with 16 SWG binding wire) and including labour, tools & plants, carriage, loading unloading and stacking of all materials at site for proper completion of works at all respect. | 0.89 | MT | 79,350 | ₹70,621.5 |
| 10 | Supplying and fixing in position of wheel guard including all labour materails T&P. | 4 | Nos | 1,630 | ₹6,520 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_2077845.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .