SE/Salem EDC
o/c SE/Salem EDC
Works contract for HT OH lines With HT UG cable in Thillainagar feeder Hasthampatty ss Maravaneri Section
2023_EB_286908_1
SE/SEDC/WC.NO.055/2022-23
Open Tender
Electrical and Maintenance Works
Works
180 days
Thillai Nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,000
3 Mar 2023
7 Feb 2023
21 Feb 2023
7 Feb 2023
20 Feb 2023
8 Feb 2023
Amount
SUPPLY OF MATERIALS - 22 KV BAY EXTENSION
33KV Straight Joint Kis
LT 4*240 Sqmm LT UG Cable
LT 4*240 Sqmm LT UG Cable Straight Joint Kit
GI Clamp Suitable for 100 mm
Alum.Lugs for 240 Sqmm Cable
GI Pipr 100mm Dia
GI Pipr 160mm Dia
Loading of Poles upto 9.0mts
Unloading of Poles upto 9.0mts
Traansporting of 9.0 mts Poles
Traansporting of 9.0 mts Poles from Road side to Pole Pit upto 9.0mts
Excavation of Pole Pit for 9.0mts Pole
Erection of 9.0mts PSC Pols
Excavation of Stay Pit
Erection of stay set complete
Fixing of Tapping Cross arm
Fuxing of LT 3 Phase Cross arm
Fixing of 22KV Polymer Disc Insulator
Fixing of LT Shackle Insulator
Fixing of Aluminium Knob
Paving of Conductor ACSR 7/3.35mm
Paving of Conductor ACSR 7/2.59mm
Transporting of materials
Loading and unloading of materials
Base Concreting
Stay Concreting
Dismantling
V' Cross Arm
Tapping Cross arm
HT TI Fiffing
22KV Pin Insulators with Pin
11 KV Strain disc with M.P
Stay Set Complete
LT 3 Phase Cross Arm
LT Pin Insulator
LT Shackle Insulator
ACSR 7/3.35mm Conductor
ACSR 7/2.59mm Conductor
8.0 Mts PSC Poles
9.0 Mts PSC Poles
RSJ Pole
Loading of Poles upto 9.0mts
Unloading of Poles upto 9.0mts
Transporting of 9.0mts Poles
Labour of LT UG Cable
LT- UG - Earthwork Excataion of 0.75 Mt Average depth, 0.45 mt average width in hard stiff clay, shales murran gravel, stoney earth and mixed gravel, stoney earth and mixed with small sizes boulders and gravelly soil for sand bedding as directed by the Engineer - in-charge at site and including providing labour for watching over the excavated trench during day and night to avoid any accident caused to animal and human being including cost of signal board, danger light, trial pit, barrycade arrangements, lead and lift etc, completed (This excludes Blacktopping charges)
LT- UG - Labour charges for removing of black topping portion of 0.45 mt average width by using chisel, hammer and pick axe and including cost of signal board and danger light and providing watch and ward staff to prevent any accident caused to the cattle and human beings including sharpening charges of chisel and including excavation of road cutting using JCB/Air compressor Drill at Day and Night time and avoiding any damage to the telecom and water lines etc (Along the Road) including trial pits
LT- UG - Providing sand bedding with good quality of Manufactured Sand to a depth of 6" in the excavated cable trench including cost of sand, labour, and labour charges for transport,lead, lift, etc., complete
LT- UG - Loading of LT armoured cable drum from stores using crane Lorry, safe transportng to site and safe unloading at the worksite without any damage using crane lorry.This includes labour for loading, unloading, transporting and rent for crane lorry, all T&P such as crowbars,DShackle etc., that must be brought by the contractor. - Dept Vehicle
LT- UG - Recoiling / Laying / Removal of LT UG cable in the excavated trench including drawing the cable through RCC/G.I.Pipe wherever necessary such as Road Crossing etc.,without any damage , sealing the cable with end caps with suitable ends which includes provision of Signal Board, Danger Board, light etc and also loading, transporting charges, unloading , tools and plants, rollers etc etc.,the contractor must bring all tools and plants and Rollers. -4 x 240 Sqmm
LT- UG - Refilling the cable trench and duct with excavated earth in layer,ramming and consolidating properly in layers of 6" and the top brought in line with the existing surface including labour, lead, lift. Etc., complete
LT- UG - Fixing Cable termination for 120/240 Sqmm UG Cable using 4 Nos lugs including supply of clamps, bolt and nuts, lugs by the contractor along the structure / Pillar box
Erection of 4 Way Pillar Box including cost of excavation , transportation, construction of 2 Nos pillar walls ( 1.20 m - Height x 0.5 m - Length x 0.2 m - width)., plastering of 2 Nos pillar walls as specified below including supply of all civil materials such as cement, sand, jelly and T&Ps.
Erection of 1.1 KV 4C x 120,240 Sq.mm LT UG Cable Straight Joint Kit-Heat shrinkable type,including charges for cable jointer.
Labour of HT UG Cable
HT UG - Earthwork excavation 1.2 Mt.average Depth X 0.6mt average width in hard stiff clay, shales murran gravel, stoney earth and mixed with small sizes boulders and gravelly soil r for sand bedding as directed by the Engineer-in-charge at site and including providing labour for watching over the excavated trench during day and night to avoid any accident caused to animal and human being including cost of signal board, danger light, lead and lift etc., complete excluding blacktopping and including trial pits charges
HT UG - Labour charges for removing of black topping portion of 0.6mt average width by using chisel, hammer and pick axe and including cost of signal board and danger light and providing watch and ward staff to prevent any accident caused to the cattle and human beings including sharpening charges of chisel and including excaavation of road cutting using JCB/Air compressor Drill at Day and Night time and avoiding any damage to the telecom and water lines etc (Along the Road) including trial pits
HT UG - Providing sand bedding with good quality of river sand to a depth of 6" in the excavated cable trench including cost of sand, labour, and labour charges for transport,lead, lift, etc., complete
HT UG - Loading of HT cable drum from stores using crane Lorry, safe transportng to site and safe unloading at the worksite without any damage using crane lorry.This includes labour for loading, unloading, transporting and rent for crane lorry, all T&P suchas crowbars,siling,DShackle etc., that must be brought by the contractor. - Dept Vehicle
HT UG - Recoiling / Laying / Removal of HT UG cable in the excavated trench including drawing the cable through RCC/G.I.Pipe wherever necessary such as Road Crossing etc.,without any damage , sealing the cable with end caps with suitabl endsand which includes provision of Signal Board, Danger Board, light etc and also loading, transporting charges, unloading of tools and plant etc.,the contractor must bring all tools and plants.
HT UG - Drawal/Laying of R.C.C."V" Troughs in th excavated cable trench from Stores/ Worksite including transportation without any damage .This includes all Lead ,Lift safe unloading, safe Loading and transport etc. ( Note: Damage if any due to rough handling, the cost of V trough will be be deducted)
HT UG - Refilling the cable trench and duct with excavated earth in layer,ramming and consolidating properly in layers of 6" and the top brought in line with the existing surface including labour, lead, lift. Etc., complete
HT UG - Fixing of cable termination including supply of clamp at 3 locations along the structure after completion of termination joint.Termination joint will be done by cable jointer separately.But this includes releasing of cable drum from the cable pit/ structure ,providing and reeasing of tent,transporting of tent from office to site and back fixing the cable at structure and back filling the cable pit etc.
HT UG - Excavation of pit (for providing Straight joint) of size 3.6 M X 2.4 M X 1.3 M and excavation of cable trench for 3 M on either side of the joint location for releasing the cable.This includes labour for providing and releasing of tent at joint location, transporting of tent from office to site and back, removing and refixing of "V" troughs, fixing the joint works &carefully fixing the joint in position after completing of jointing and refilling the trench with the excavated soil.
HT UG - Erection of 160 mm dia ISI PVC Pipe for Road and Drainage crossing for the HT Cable laying ( Note: Normally PVC Pipes will be used for termination structure. Only in specific locations the GI pipe will be used as per the advise of site engineer incharge) - GI Pipe
LT- UG Loading, unloading ,transporting and erection of RCC Cable marker of standard size including painting the word " TNEB/ UG CABLE" and other notations as per the site Engineers instruction. (Includes excavation and laying)
HT UG - Erection of 33 KV 3C x 400 Sq.mm XLPE UG Cable Outdoor End termination Kit-Heat shrinkable type,including charges for cable jointer.
HT UG - Erection of 33 KV 3C x 400 Sq.mm XLPE UG Cable Straight Joint Kit-Heat shrinkable type,including charges for cable jointer.
EPF @ 13 % should be Entered by the Bidder.
E.S.I. @ 3.25 % should be Entered by the Bidder.
G.S.T. @ 18% should be Entered by the Bidder.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .