| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 LAdmitted-Finance | ₹10.2 L | L1 | Admitted-Finance |
| 2 | L2₹12.4 L+₹2.2 L (21.6%)Admitted-Finance | ₹12.4 L+₹2.2 L (21.6%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S PERIYASAMY L1 | Sundaram Associates L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling brick work in cement mortar at all levels by manually / by mechanical means, carefully without damaging adjacent structures including stacking of serviceable materials and disposal of unserviceable materials within 50m lead all as per specifications and directed by the Engineer-in-charge. | 10 | Cu.m. | 900 ₹9,000 Lowest | 1,500 ₹15,000 |
| 2.00 | Dismantling old weather proofing materials such as brick bat coba or foam and screed concrete at all levels and cleaning the surface including disposal of rubbish to the dumping yard within 50 metres lead all as per specifications and directed by the Engineer-in-charge. | 5 | Cu.m. | 800 ₹4,000 Lowest | 1,500 ₹7,500 |
| 3.00 | Dismantling weather proofing old bitumen felt or App membrane sheets at all levels and cleaning the surface including disposal of rubbish to the dumping yard within 50 metres lead all as per specifications and directed by the Engineer-in-charge. | 100 | Sq.m. | 70 ₹7,000 Lowest | 80 ₹8,000 |
| 4.00 | Dismantling of RCC works at all levels by manually / by mechanical means, including Cutting and stacking of steel reinforcement bars and disposal of unserviceable materials within 50m lead as per specifications and directed by the Engineer-in-charge. | 2 | Cu.m. | 3,500 ₹7,000 Lowest | 3,500 ₹7,000 Lowest |
| 5.00 | Providing and laying cement based water proofing treatment with a course layer of broken bricks of various sizes to an average thickness of 100mm over a 20mm thick bed of cement mortar 1:5 using crushed stone sand mixed with water proofing compound, plastering the top layer 12mm thick in cement mortar 1:5 using crushed stone sand, mixed with waterproofing compound, finished smooth with thread marking at 300mm squares (South India water proofing or equivalent, ratio to cement shall be as per manufacturers specification or 2% to be adopted) Note: Suitable guarantee for 10 years is to be provided for this work. This work has to be executed as per the specification and direction of the Engineer-in-charge. | 50 | Sq.m. | 1,100 ₹55,000 | 900 ₹45,000 Lowest |
| 6.00Conveying the surplus excavated earth & debris, boulders and spoil by mechanical means and depositing at places inside DAE installation identified as Dumping yard as per requirement with a lead specified below including loading, unloading, breaking clods, levelling all complete as per specification and as directed by the Engineer-in-Charge. Note: 1) The rates in respect of this Item are applicable for the NET Quantities arrived at after making deductions for voids @ 20% in respect of soil and @ 50% in respect of Rock from the corresponding Stack / Truck measurements. 2) The earth shall be dumped well inside the Dumping yard and not over approach pathway road. | |||||
| 6.01 | Lead charges for lead Exceeding 3 kilometre but not exceeding 4 kilometre | 100 | Cu.m. | 300 ₹30,000 Lowest | 400 ₹40,000 |
| 7.00 | Supplying and fixing in all position of Alkali resistance Glass fibre mesh of Gyproc Fiber Mesh or approved equivalent (4-5mm square aperture or as per specified at site with 145 gsm) fixed with neat cement paste or by manufacturer recommendation fixed below screed concrete with minimum 100mm overlapping at mesh joints and as instructed by Engineer-in-Charge. | 70 | Sq.m. | 200 ₹14,000 Lowest | 350 ₹24,500 |
| 8.00 | Providing plastering in cement mortar 1:4 using crushed stone sand, 20mm thick at all elevations/levels with 2% of water proofing compound or as per manufacturers specification, ‘Impermo’ or approved equivalent make including hacking of concrete surfaces with pointed tool, scaffolding, finishing, curing, all as per specifications. | 100 | Sq.m. | 300 ₹30,000 Lowest | 550 ₹55,000 |
| 9.00 | Providing and laying plain cement concrete 1:2:4 using 20mm maximum size graded aggregates and crushed stone sand including mechanical mixing, transporting and placing in required position, ramming, compaction, levelling, curing, shuttering, dewatering if any, complete all as per specification for levelling courses in foundation for walls, footings, floor drains etc., encasing pipes and other required works directed by Engineer-in-Charge complete all as per specifications. | 5 | Cu.m. | 8,000 ₹40,000 Lowest | 9,000 ₹45,000 |
Tender Value
₹9.8 L
EMD Value
₹19,640
Closing Date
10 Nov 2025, 11:30 amClosed
Chief Engineer, CEG
CDO Building , Indira Gandhi Centre for Atomic Research, Kalpakkam - 603102.
Repairing the damaged water proofing system in roof terrace and gutter of various building in IGCAR, Kalpakkam for the year 2026-2027.
2025_IGCAR_882999_1
CEG/IGC/2135/2025
Open Tender
Civil Works
Item Rate
365 days
Kalpakkam
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹19,640
26 Nov 2025
27 Oct 2025
11 Nov 2025
28 Oct 2025
10 Nov 2025
29 Oct 2025
stage.html
html • 0.03 MB
technical_928074.pdf
techsummary_928074.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.47 MB
Tender Documents
Tender Documents • 2.07 MB
Tender Documents
Tender Documents • 0.22 MB
Tender Documents
Tender Documents • 0.08 MB
BOQ
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .