| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹66.8 LAccepted-AOC | L1 | Accepted-AOC L-1 | |
| 2 | L2₹71.7 L+₹4.8 L (7.25%)Rejected-Finance CONTRACTOR AGENCY NAME M S ADITYA RAJ ENTERPRISES | L2 | Rejected-Finance L2 | |
| 3 | L3₹72.3 L+₹5.5 L (8.19%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹87.1 L+₹20.3 L (30.4%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹90.3 L+₹23.5 L (35.1%)Rejected-Finance AT ANAND VIHAR KADRU PO DORANDA PS ARGORA RANCHI 834002 | RANCHI | JHARKHAND | 834002 | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | SARTHAK CONSTRUCTION L1 | M/S ADITYA RAJ ENTERPRISES L2 | DHANANJAY KUMAR L5 | VALOUR TECH INDIA PRIVATE LIMITED L4 | N K SAHU CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - A) and disposal of excavated earth as obtained to a distance upto 50 m including all lifts, levelling, ramming the foundation trenches, removing roots of trees shurbs all complete as per approved design building specification and direction of E/I. | 159.71 | Cum | 112.36 ₹17,945.02 Lowest | 120.5 ₹19,245.06 | 151.82 ₹24,247.17 | 146.51 ₹23,399.11 | 121.56 ₹19,414.35 |
| 2.00 | Extra for earth work in hard soil as per specification and direction of E/I. (vide classfication of soil item - B) | 55.38 | Cum | 11.48 ₹635.76 Lowest | 12.31 ₹681.73 | 15.51 ₹858.94 | 14.97 ₹829.04 | 12.42 ₹687.82 |
| 3.00 | Filling in foundation trenches and plenth in layers not exceeding 150 mm thick well watered, rammed, fully compacted and fine dresssd with earth obdiened from excavation of foundation trenches within a lead of 50 m and lift of 1.5 M all complete as per building specification and direction of E.I (Mode of measurement compacted volume.) | 52.16 | Cum | 40.91 ₹2,133.87 Lowest | 43.88 ₹2,288.78 | 128.88 ₹6,722.38 | 124.37 ₹6,487.14 | 44.26 ₹2,308.6 |
| 4.00 | Providing coarse clean SAND FILLING in foundation trenches or plinth including ramming & watering in layers not exceeding | 38.73 | Cum | 436.3 ₹16,897.9 Lowest | 467.89 ₹18,121.38 | 589.51 ₹22,831.72 | 568.88 ₹22,032.72 | 472.02 ₹18,281.33 |
| 5.00 | Providing designation 75 Abrick work in C.M (1:6)in foundation and plinth with approved quality of clean coarse sand of F.M2 to 2.5 including providing 10mm thick morter joints , cost of screening materials , raking of joints to 15mm depth , curing taxes and royality all complete as per building specification and direction of E/l | 7.4 | Cum | 3,782.1 ₹27,987.54 Lowest | 4,056.01 ₹30,014.47 | 5,439.85 ₹40,254.89 | 5,249.46 ₹38,846 | 4,091.79 ₹30,279.25 |
| 6.00 | Providing designation 75 B brick work in C.M. (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to2.5 including providing 10 mm thick mortar joints cost of screening materials , scafolding , raking out joints to 15mm depth curing, taxes and royalty all complete as per building specification and direction of E/l. | 9.12 | Cum | 3,881.14 ₹35,396 Lowest | 4,162.23 ₹37,959.54 | 5,244.08 ₹47,826.01 | 5,060.54 ₹46,152.12 | 4,198.93 ₹38,294.24 |
| 7.00 | Providing designation 125 mm thick reinforced designation 75A brick work in CM (1:4) in superstructure with approved quality of clean coarse sand of F.M. 2 to 25 including the cost of screening, carriage of materials, scaffolding , raking out joints to 15mm depth, curing, taxes and royalty (but excluding the cost of reinforcement) all complete as per building specification and direction of E/I. | 25.3 | Sqm | 528.05 ₹13,362.31 Lowest | 566.3 ₹14,330.22 | 713.49 ₹18,054.86 | 688.52 ₹17,423 | 571.29 ₹14,456.49 |
| 8.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 0.84 | Cum | 3,403.15 ₹2,858.65 Lowest | 3,649.62 ₹3,065.68 | 4,598.23 ₹3,862.51 | 4,437.29 ₹3,727.32 | 3,681.8 ₹3,092.71 |
| 9.00 | Providing P.C.C. M - 150 with nominal mix of (1:3:6) in foundation with approved quality of stone chips 20 mm to 6mm size graded and clean coarse sand of F.M. 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete as per building specification and direction of E/l. | 3.96 | CUM | 3,053.22 ₹12,090.75 Lowest | 3,274.34 ₹12,966.39 | 4,125.41 ₹16,336.62 | 3,981.02 ₹15,764.84 | 3,303.22 ₹13,080.75 |
| 10.00 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. | 87.75 | Sqm | 260.33 ₹22,843.96 Lowest | 279.18 ₹24,498.05 | 351.75 ₹30,866.06 | 339.44 ₹29,785.75 | 281.65 ₹24,714.79 |
Tender Value
₹90.3 L
EMD Value
₹1.8 L
Closing Date
25 Sept 2025, 11:00 amClosed
E.E., BCD, Building Division, Lohardaga
E.E., BCD, Building Division, Lohardaga
Renovation of Multipurpose Building and Badminton Court, Near Circuit House, Lohardaga.
2025_BCD_104966_1
02/2025-26/EE/BCD/LOHARDAGA
Open Tender
Civil Works - Buildings
Works
180 days
Lohardaga
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.8 L
19 Nov 2025
18 Sept 2025
26 Sept 2025
18 Sept 2025
25 Sept 2025
18 Sept 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .