Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.8 LAccepted-AOC | L1 | Accepted-AOC BEING L1 | |
| 2 | L2₹28.9 L+₹73,213.33 (2.60%)Rejected-AOC HOUSE NO 2 4 136 LINGREDDY MANSION BLOCK NO IV OPP HANUMAN TEMPLE TADBUND SECUNDERABAD 500009 | SECUNDERABAD | HYDERABAD | TELANGANA | 500009 | L2 | Rejected-AOC BEING NO L1 | |
| 3 | L3₹28.9 L+₹76,823.43 (2.73%)Rejected-AOC | L3 | Rejected-AOC BEING NO L1 | |
| 4 | L4₹30.4 L+₹2.3 L (8.06%)Rejected-AOC | L4 | Rejected-AOC BEING NO L1 | |
| 5 | L5₹31.0 L+₹2.9 L (10.2%)Rejected-AOC | L5 | Rejected-AOC BEING NO L1 |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
14 Feb 2023, 6:00 pmClosed
GE (UTILITY) SECUNDERABAD
GE UTILITY SECUNDERABAD MUDFORT SECUNDERABAD-500003
REPAIR/REPLACEMENT OF PUMP CONTROL PANEL, EARTHING, COPPER CABLE, AVIATION LIGHT, WATER LEVEL INDICATORS, PIPE LINE REPLACEMENT AND REPAIR AND ALLIED WORKS AT MH SECUNDERABAD AND ADJOINING AREA UNDER GE (U) SECUNDERABAD
2023_MES_576074_1
GE(U)/SEC/TOKEN/63 OF 2022-2023
Open Tender
Civil Works - Water Works
Item Rate
180 days
SECUNDERABAD
AS PER NIT
7 documents required · 7 mandatory
₹500
GE (UTILITY) SECUNDERABAD
₹70,000
Yes
11 Aug 2023
19 Jan 2023
21 Feb 2023
19 Jan 2023
14 Feb 2023
2 Feb 2023
Amount
Repair/rectification of leakages to water supply distribution lines 15 mm bore to 25 mm bore GI/PPR tubing with provision of necessary excavation,cutting of hard standing , returning and filling in as required, tightening of loose joints of union, elbow, sockets etc, threading if required including replacement of GI unions/sockets/nipples as required at site complete all as specified and directed.
All as per item No 1 above but for GI tubing 40 mm bore to 50 mm bore
All as per item No 1 here-in-before but for GI tubing 80 mm bore to 100 mm bore.
Attending routine compaints of external water supply including rectification of minor defects by taking down of existing GI/PPR tubing up to 25 mm bore, cutting/threading and making joints and cleaning for any blockages, opening of float valve of service tanks, cleaning and fixing the same in its position, replacement of jumper valve/ packing sheet of gate valve and including replacement of GI unions/sockets/nipples etc as required at site complete all as specified and directed.
All as per item No 4 here-in-before but for GI tubing 40 mm bore to 50 mm bore.
Attending compaints of BLOCKAGE OF WATER PIPE LINES / NO WATER SUPPLY AT ANY kind of ACCOMODATION ( MARRIED / OTM/ single / multi story building), IDENTIFY THE FAULTS including rectification by taking down of existing GI/PPR tubing up to 80 mm bore, cutting/threading and making joints and cleaning for any blockages, opening of float valve of service tanks, cleaning and fixing the same in its position, replacement of valve/ packing sheet of gate valve and including replacement of GI unions/sockets/nipples etc as required at site TO RESTORE WATER SUPPLY complete all as specified and directed.
Notes for Sl item No 1 to 6 :- (a) The contractor will be alloted complaints at MES complaint cell on requirement basis on all working days including Sundays and holidays and sufficient tradesman / resources will be deployed by him/her for completion of day to day comaplaints within 12 hours from the time of reporting. Any delay beyond above mentioned time limit without intimation of genuine cause, penalties will be recovered twice of the quoted rate for each un-attended complaint. (b) A detailed log book of complaints with completion/non-completion remarks from users/MES will be maintained by the contractor and the same will be updated on daily basis in consulatation with JE E&M/Engineer-in-Charge. (c) The contractor will make suitable arrangment for emergency complaints and will notify authorised representive/Engineer-in-Charge about extraordinary circumstances for probable non-completion or delay in rectification of complaints beyond stated time limit set for disposal of complaint. In case of any dispute the decision of accepting officer will be final and binding in this regard.
(d) The contractor will intimate MES authority well in advance if electric shutdown is required during rectification of complaints. (e) The quoted rate is deemed to be inclusive of transportation and other expenses required for the resource deployment at the complaint site around scattered Military station at Secunderabad. (f) The contractor will maintain location wise record of each spare/fittings utilized as per inventry format given by AGE E/M, Secunderabd and the same shall be submitted to E/M No II store yard on requirement basis. (g) The stationery required for the job work such as complaint slip books, gate pass book, job card and T&P shall be arranged and maintained by the contractor. (h) The cost of excavation / earth work above 1 CUM mesured and paid separately under relivent items . (j) Contractor is responsible for repair/replacement of any damages to the existing structures, Under Ground HT/LT/OFC Cables etc during the course of execution. (k) Spares/GI fittings required to be replaced and shall be measured and paid separately under respective items.
Rectification of lekages in pumping /delivery lines(CI/DI/PPR/MS) of size 80 mm to 100 mm at Military area / Military Roads /civil Roads /PWD Roads /Cantt board roads by taking necessary permission from respective authorities by excavating PCC/RCC/pavement/soft&hard soil/rock of any depth by using necessary T&P(Excavator/hammer drill)as per the requirement , De-watering from the trenches by using pump sets, rectification of leakages, fixing of CI/ DI specials such as collars, bends/tail peaces,any type of gasket , welding work etc as required to arrest the leakages completely and making joints, filling the trenches , site clearences and PCC at the top portion as required complete all as specified and as directed. Note:- (i) CI specials, lead Joints, D-Joints, Clamp joints, DI/CI/PPR/MS Pipe etc shall be measured and paid separately under respective items of BOQ. (ii) Excavation and PCC will be measured and paid separately under relivent items. (iii) Rate of any kind of gasket and Lead joint , necessary barrication for safety of worker etc as required , deemed to be included in the quoted rate. (iii) Rate of any kind of gasket and necessary barrication for safety of worker etc as required , deemed to be included in the quoted rate. (iv) The contractor is responsible for obtaining the approval from Police Department for Traffic Diversion and related works if required in consultation with the MES deparatment. (v) Contractor is responsible for repair/replacement of any damages to the existing structures, Under Ground HT/LT/OFC Cables etc during the course of execution.
Rectification of lekages in pumping /delivery lines(MS/CI/DI/PPR) of size 150 mm to 400 mm at Military area / Military Roads /civil Roads /PWD Roads /Cantt board roads by taking necessary permission from respective authorities by excavating PCC/RCC/pavement/soft&hard soil/rock of any depth by using necessary T&P(Excavator/hammer drill)as per the requirement , De-watering from the trenches by using pump sets, rectification of leakages, fixing of CI/ DI specials such as collars, bends/tail peaces,any type of gasket, welding work etc as required to arrest the leakages completely and making joints,filling the trenches , site clearences and PCC at the top portion as required complete all as specified and as directed. Note:- (i) CI specials, lead Joints, D-Joints, Clamp joints, DI/CI/PPR/MS Pipe etc shall be measured and paid under respective items of BOQ. (ii) Excavation exceeding 2 CUM and PCC will be measured and paid separately under relivent items. (iii) rate of any kind of gasket and necessary barrication for safety of worker etc as required , deemed to be included in the quoted rate. (iv) The contractor is responsible for obtaining the approval from Police Department for Traffic Diversion and related works if required in consultation with the MES deparatment. (v) Contractor is responsible for repair/replacement of any damages to the existing structures, Under Ground HT/LT/OFC Cables etc during the course of execution.
M&L for attending break down of water supply pipe line at Military area / Military Roads /civil Roads /PWD Roads /Cantt board roads and repair s to CI/DI/PPR/MS water mains of size 80 mm to 300 mm bore at a given notice including necessary excavation in mud, in any type of soil , PCC,RCC, hard rock etc by manual or using special T&P such as JCB etc. De-watering from the trenches by using pump sets, rectification of leakages, fixing of CI specials such as collars, bends/tail peaces etc and making joints complete all as specified and as directed including making good of disturbed surfaces. Note:- (i) CI specials, lead Joints, D-Joints, Clamp joints, DI/CI/PPR/MS Pipe etc shall be measured and paid under respective items of sch 'A'. (ii) Excavation and PCC will be measured and paid separately under relivent items. (iii) Rate of any kind of gasket and necessary barrication for safety of worker etc as required , deemed to be included in the quoted rate. (iv) The contractor is responsible for obtaining the approval from Police Department for Traffic Diversion and related works if required in consultation with the MES deparatment. (v) Contractor is responsible for repair/replacement of any damages to the existing structures, Under Ground HT/LT/OFC Cables etc during the course of execution.
Excavation in trenches not exceeding 1.5 m width and not exc 1.5 m in depth and getting out in hard/dense soil for removing/laying of pipe line complete all as specified and directed.
Returning, filling in, including spreading, leveling, watering and well ramming in layers not exc 25 cm in any type of soil complete all as specified and directed.
Removing excavated material (soils) n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point complete all as specified and directed.
Taking up or down steel tubing and connections, including cleaning the pipes free from scaling for for re-fixing or removal complete with all fittings and connections of the following sizes :-
15 mm dia
20 mm dia
25 mm dia
40 mm dia
50 mm dia
80 mm dia
Refixing of old steel tubing and connection in new or old position including cutting threads if required , fittings with old/new bends, elbows, socket, nipple, tapers, and reducers etc as per site requirement and laid in trenches and testing for leakages complete all as specified and directed for the following sizes:-
15 mm dia
20 mm dia
25 mm dia
40 mm dia
50 mm dia
80 mm dia
Notes for item No 14.01 to 14.06 :- (a) Excavation and Earth work shall be measured and paid separately.
Refixing of old steel tubing and connection in new or old position including , cutting threads if required , fittings with old/new bends, elbows, socket, nipple, tapers, and reducers etc as per site requirement and laid in floors, walls and ceilings and testing for leakages complete all as specified and directed for the following sizes:-
15 mm dia
20 mm dia
25 mm dia
40 mm dia
50 mm dia
Supply and laying steel water tubing medium grade, galvanised laid in trenches and testing for leakages complete all as specified and directed and directed by Engineer-in-Charge for the following sizes:-
15 mm dia
20 mm dia
25 mm dia
40 mm dia
50 mm dia
80 mm dia
Notes for item No 16.01 to 16.06 :- (a) Excavation and Earth work shall be measured and paid separately. (b) Requisite fittings required shall be measured and paid separately.
Supply and laying steel water tubing medium grade, galvanised fixed to wall and ceilings or laid in floor and testing for leakages complete all as specified and directed for the following sizes:- Notes : Requisite fittings required shall be measured and paid separately.
15 mm dia
20 mm dia
25 mm dia
40 mm dia
50 mm dia
Taking up or down PPR pipe and connections, including cleaning the pipes free from scaling for for re-fixing or removal complete with all fittings and connections of the following sizes :-
32 mm dia
63 mm dia
Refixing of old PPR Pipe and connection in new or old position including fittings with old/new bends, elbows, socket, nipple, tapers, and reducers etc as per site requirement and laid in trenches and testing for leakages complete all as specified and directed for the following sizes:-
32 mm dia
63 mm dia
Notes for item No 19.01 to 19.02 :- (a) Excavation and Earth work shall be measured and paid separately.
Refixing of old PPR Pipe and connection in new or old position including fittings with old/new bends, elbows, socket, nipple, tapers, and reducers etc as per site requirement and laid in floors, walls and ceilings and testing for leakages complete all as specified and directed for the following sizes:-
32 mm dia
63 mm dia
Supply, laying and testing of polypropylene random copolymer (PP-R) (PN-10-SDR-11) 3 layer pipes ISI marked as per IS-15801, UV stabilized and anti microbial fusion welded having thermal stability for hot and cold water supply all PPR plain and brass thread polypropylene random fittings laid in trenches of following sizes including all fittings. Make : SFMC/WETFLOW/SAFE.
32 mm dia
63 mm dia
Notes for item No 21.01 to 21.02 :- (a) Excavation and Earth work shall be measured and paid separately.
Supply, laying and testing of polypropylene random copolymer (PP-R) (PN-10-SDR-11) 3 layer pipes ISI marked as per IS-15801, UV stabilized and anti microbial fusion welded having thermal stability for hot and cold water supply all PPR plain and brass thread polypropylene random fittings fixed complete to walls, ceilings or in floors etc of following sizes including all fittings. Make : SFMC/WETFLOW/SAFE.
32 mm dia
63 mm dia
Taking up unserviceable/ defective CI/DI/MS/PPR water mains (including all fitting ) with spigot/ socketed / flanged ends including disconnecting pipes and fittings in any position complete all as specified and directed for the following sizes:-
80 mm Dia
100 mm Dia
150 mm Dia
200 mm Dia
Refixing of old CI/DI/MS Pipe and connection in new or old position including fittings with old/new bends, elbows, socket, nipple, tapers, and reducers etc as per site requirement and laid in trenches and testing for leakages complete all as specified and directed for the following sizes:-
80 mm dia
100 mm dia
150 mm dia
200 mm dia
Notes for item No 24.01 to 24.04 :- (a) Excavation and Earth work shall be measured and paid separately.
S&F ductile iron pressure pipes, class K7, centrifugally cast with spigot and socket ends as per following conforming to IS 8329/2000 with cement mortar lining inside the pipes with outside zinc coating suitable for push-on-joint (rubber gasket D jointing) in any length including DI specials as required at site confirming to IS 8329/2000 and all jointing materials and making good for disturbed surfaces of roads, path ways etc while laying the pipe line at site, site clearance for the route of pipe line, welding, cutting the existing CI/DI/MS pipe line of any size up to 400 mm dia for inserting branch connections etc complete all as specified and directed for the following sizes:- Notes:- (a) Quoted rates are deemed to be inclusive of Push on Joints / D-Joints as required (b) The contractor is responsible for obtaining the approval from Police Department for Traffic Diversion and related works if required in consultation with the MES deparatment if required. (c) Contractor is responsible for repair/replacement of any damages to the existing structures, Under Ground HT/LT/OFC Cables etc during the course of execution.
100 mm Dia
150 mm Dia
200 mm Dia
Notes for item No 25.01 to 25.03 :- (a) Excavation and Earth work shall be measured and paid separately.
Cutting existing CI /di/ms/ppr pipe line for insertion of new tees, collars for branch connections complete all as specified and directed for the following sizes:- Note: CI /DI specials, Joints and Earth work shall be measured and paid sperately under relevant items of this schedule.
80 mm Dia
100 mm Dia
150 mm Dia
200 mm Dia
S&F GI fittings 15 mm bore, medium grade, ISI marked, smooth finished and make embossed on fittings complete all as specified and directed for the following fittings:-
Union
All equal Tee
Socket
Nipple 75mm Long
Nipple 100mm Long
Nipple 150mm Long
Elbow
Hex Nipple
All as per item No 27 here-in-before but for 20 mm bore.
Union
All equal Tee
Reducer Tee 20 x 20 x 15 mm
Socket
Reducer Socket 20 x 15 mm
Nipple 75mm Long
Nipple 100mm Long
Nipple 150mm Long
Reducer Elbow 20 x 15 mm
Elbow
Hex Nipple
All as per item No 27 here-in-before but for 25 mm bore.
Union
All equal Tee
Socket
Reducer Socket 25 x 20 mm
Reducer Socket 25 x 15 mm
Nipple 75mm Long
Nipple 100mm Long
Nipple 150mm Long
Elbow
Reducer Elbow 25 x 20 mm
Reducer Elbow 25 x 15 mm
Reducer tee 25mm x 25 mm x 20mm
Reducer tee 25mm x 25 mm x 15mm
Hex Nipple
All as per item No 27 here-in-before but for 40 mm bore.
Union
All equal Tee
Socket
Reducer Socket 40mm x 25 mm
Nipple 75mm Long
Nipple 100mm Long
Nipple 150mm Long
Elbow
Reducer elbow 40mm x 25mm
Reducer tee 40mm x 40mm x 25mm
Reducer tee 40mm x 40mm x 20mm
Hex Nipple
Reducer Socket 40mm x 20 mm
Reducer elbow 40mm x 20mm
All as per item No 27 here-in-before but for 50 mm bore.
Union
All equal Tee
Socket
Nipple 75mm Long
Nipple 100mm Long
Nipple 150mm Long
Reducer Socket 50mm x 40mm.
Reducer Socket 50mm x 25mm.
Elbow
Reducer elbow 50mm x 40mm
Reducer elbow 50mm x 25mm
Reducer tee 50mm x 50 mm x 40mm
Reducer tee 50mm x 50 mm x 25mm
Reducer tee 50mm x 50 mm x 20mm
Hex Nipple
All as per item No 27 here-in-before but for 80 mm bore.
Union
All equal Tee
Socket
Reducer Socket 80mm x 50mm.
Reducer Socket 80mm x 40mm.
Nipple 75mm Long
Nipple 100mm Long
Nipple 150mm Long
Elbow
Reducer elbow 80mm x 50mm
Reducer elbow 80mm x 40mm
Reducer tee 80mm x 80mm x 50mm
Reducer tee 80mm x 80mm x 40mm
Hex Nipple
Supply and fix in replacement of unserviceable Gun metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipes and fixed complete all as specified and directed for the following sizes:-
15mm dia bore
20mm dia bore
25mm dia bore
40mm dia bore
50mm dia bore
65mm dia bore.
Supply and fix in replacement of unserviceable ball brass valves, high pressure with polythene float and flynut alongwith socket/reducer of suitable size, screwed for iron pipe or brass ferrule and fixed complete all as specified and directed for the following sizes:-
20mm dia bore
25mm dia bore
50 mm dia bore
M&L for Arresting leakages of sluice valves by replacing Gland packing, gland bush, gland falange, nutbolts, gasket, packing material as required after dismantling in existing position including testing on completion complete all as specified and directed for the following sizes:- Note: Quoted rates are deemed to be inclusive of the materials mentioned above like Gland packing, gland bush, gland falange, nutbolts, gasket, packing materia etc as required to arrest the leakages.
80 mm Dia
100 mm Dia
150 mm Dia
200 mm Dia
300 mm Dia
S&F CI / DI specials such as bends (any type, radius or angle) tapers any type (Straight, bend, increase, decrease or double socket etc) tee pieces, single 'Y' branch, double branch cross (all sockets, socket and spigots, collars, cap plugs etc up to 150 mm bore complete all as specified and directed.
All as per item No 36 here-in-before but for 200 mm bore to 300 mm bore.
Burning out lead joint in position for following sizes of CI/DI pipe, removing old lead complete all as specified and directed :-
80 mm Dia
100 mm Dia
150 mm Dia
200 mm Dia
300 mm Dia
M&L for run lead joint for CI pipe/DI pipe including spun yarn etc for spigot and socket pipes and fittiings complete all as specified and directed for the following bore of pipes:-
80 mm Dia
100 mm Dia
150 mm Dia
200 mm Dia
300 mm Dia
S&F in repairs CAST IRON OR DUCTILE IRON MECHANICAL COUPLING / MECHANICAL JOINT / D JOINT heavy duty INCLUDING ALL JOINTING MATERIAL , ISI marked, split type with long collar, suitable rubber rings, bolts, nuts and washers etc suitable for MS/CI/DI/GI /PVC pipes of following sizes AS REQUIRED FOR REPAIRING OF ANY KIND OF LEAKAGES COMPLETE all as specified and as directed:- Notes:- (a) Excavation and Earth work shall be measured and paid separately. (b) Quoted rates are deemed to be inclusive of cutting of any kind of pipes and all ITEMS as required for fixing and proper functioning of Joints. (c) Quoted rates are deemed to be inclusive of necessary T&P for cutting the pipe line, Pump sets for De-watering, JCB for Excavation (if required) etc and no extra payment shall be admissible on this account.
80 mm Dia
100 mm Dia
150 mm Dia
200 mm Dia
Sypply and fixing in rereplacement of DI D/F Gate valve (Soft Sealed) Resilient Seated Soft Sealing gate valves( Sluice valves RAISING TYPE ) with body bonnet of ductile cast iron of grade GGG-40/SG- 400/15 or GGG-50/SG-500/7 or equivalent grade as per IS 3896 - Part 2- 1985 and subsequent revisions, Wedge fully rubber lined with EPDM Food grade quiality and Seals of NBR and the valve should be vacuum tight and 100 % leak proof with face to face dimention as per BS 5163-89/IS 14846-2000/DIN 3202 F 4. and Valves should be electrostatic powder coating both inside and outside pocket less body passage class PN 1.6 including all jointing materials ( Gasket , Nutbolts ets) connecting and testing complete all as specified and directed.
80 mm Dia
100 mm Dia
150 mm Dia
200 mm Dia
Supply and fix NRV including making provisions in existing pipeline of CI/DI/MS of the following sizes completed all as directed. Note : Quoted rates are deemed to be inclusive of all arrangement required for the above
150 mm Dia
Cutting the existing road straight by manual, depth and width not less than 30 cm for pipes up to 100 mm dia and 60 cm for pipes from 150 mm to 150 mm dia and 75 cm for pipes above 250 mm dia and filling back with excavated soil up to 75 % road portion and 25 % shall be made with cement concrete 1:2:4 type B1 (using 20 mm graded stone aggregate complete all as specified and directed.
M&L for Construction of new PCC solid Masonry valve chamber of size 1500 X 1500 X 1500 mm (Internal dimensions) with PCC foundation 1:4:8 type D2 using 40 mm graded stone aggregate 150 mm thick 150 mm wide off sets around over 100 mm thick hard core , 200 mm thick PCC solid block walls built in CM 1:6, 50 mm thick PCC 1:2:4 Type B1 coping finished even and smooth, rendering 10 mm thick in cement mortar (1:6) finished even and smooth, with out using extra cement internally including top of floor including excavation earth work in hard/Dense soil 3 mm thick MS sheet cover fixed on 40 mm X 40 mm X 6 mm thick angle iron frame with hold fasts embedded in PCC coaping with locking arrangement, mild steel handle and painting to steel surfaces with two coats of synthetic enamel paint over one coat of primer including disposal of surplus soil to a distance not exceeding 50 m etc complete all as specified and directed.
Supply and fixing PP-R Pipe fittings and accessories 32 mm bore, smooth finished and make embossed on fittings complete all as specified and directed for the following fittings:-
Reducer Socket 32 x 25 mm
Socket
All equal Tee
Union
Gate Valve
All as item No 45 here-in-before above but 63 mm bore :-
Reducer Socket 63 x 32 mm
Socket
All equal Tee
Reducer Tee 63 x 63 x 32 mm
Union
Gate Valve
M&L for replacement of cross arms, bracings, supports, clamps and back plates fabricated from structural steel sections including welding, bending cold or hot, drilling holes for hinged, in any shape or size as indicated for valve chamber top cover, 4 mm thick MS sheet cover fixed on 40 mm X 40 mm X 6 mm thick angle iron frame with locking arrangement, mild steel handle, and painting to steel surfaces with two coats of synthetic enamel paint over one coat of primer including disposal of surplus soil to a distance not exceeding 50 m etc complete all as specified and directed.
M&L for road crossing/drain crossing by adopting trench less tunneling work through specified pipe jacking method by erecting the equipment to true to the allignment and gradient by haidrolic pipe jacking technique complete including tunneling, excavation in any type of soils including hard rock, TO CROSS WATER PIPE LINE UP TO 200 mm dia in any length including jointing materials and necessary conveyance charges of machinery and other required materials in co-ordination with the concerned authorites complete all as specified and as directed including making good of distrubed surfaces. Note: Pipe will be measured and paid separately under relevant items of BOQ.
M&L PCC 1:3:6 type C1 using 20 mm graded stone aggregate for coping & platering of valve chamber complete all as directed
M&L PCC 1:2:4 type B1 using 20 mm graded stone aggregate for FILLING / FOOTHPATH/ ROAD complete all as directed
M&L for replacement of existing water level indicator in OHT of any size , capacity and height by by Float and board types levelGuage using rope, ball valve, pully, necessary support , PCC ,display board ,indicator/pointer , necessary painting and numbering complete all as required for proper functioning of level indicator complete all as specified and directed. (All area under AGE E/M No -II) Note : Quoted rates are deemed to be inclusive of all arrangement required for the above.
M&L for painting of water distribution header including all control valves and all exposed pipe of any size by using synthetic enamelled spray painting after scrapping /cleaning complete all as directed .
Repairing of Sluice valves raising / non raising types after dismentling the same by replacing stem , gate/ disc , stuffing box,Seat, Gland packing, gland bush, gland falange, nutbolts, gasket, packing material, threading , welding as required for proper functioning of Sluice valves complete all as directed. Note: Quoted rates are deemed to be inclusive of all the materials mentioned above like stem , gate/ disc , Seat stuffing box Gland packing, gland bush, gland falange, nutbolts, gasket, packing materia etc as required for proper functioning of the valves
80 mm Dia
100 mm Dia
150 mm Dia
200 mm Dia
Supply and lay Pipes MS black Steel including specials having nominal dia 100 mm of thickness 6.0 mm as per IS 3589 - 2001, Grade - 330 with plain ends and specials by welding, leak testing of line laid in trenches / floors/ walls /ducts complete all as specified and directed. Note: Quoted rates are deemed to be inclusive of supply and fixing of flange of suitable size as required , bends welding and cutting etc as required for fixing of pipe .
Supply and lay Pipes MS black Steel including specials having nominal dia 150 mm of thickness 6.0 mm as per IS 3589 - 2001, Grade - 330 with plain ends and specials by welding, leak testing of line laid in trenches / floors/ walls /ducts complete all as specified and directed. Note: Quoted rates are deemed to be inclusive of supply and fixing of flange of suitable size as required , bends,welding and cutting etc as required for fixing of pipe .
Supply and lay MS black tubing including specials , having outside dia of 212 mm and 6 mm thick ISI marked conforming to IS 3589 - 2001 with plain ends complete including connecting of MS pipes and specials by welding, leak testing of pipe line laid in trenches / floors / walls / ducts complete all as specified and as directed by the Engineer-in-charge. Note: Quoted rates are deemed to be inclusive of supply and fixing of flange of suitable size, bends as required , welding and cutting etc as required for fixing of pipe .
Core cutting / drilling of Bldg Roof / Wall for passing of GI Pipe up to 40 mm dia incuding necessary mechinaries complete all as specified and directed
Material & labour for properly cleaning and disinfecting clear water storage tank/ reservoir, underground sump/semi underground sump of any size and any height of staging by using mechanical means and scientific cleaning by carry out the following stages of cleaning process for disinfection of surfaces:- (a) First stage: drain out the water by using exit valve or own high capacity dewatering system. (b) Second stage : Removal of algae by scrubbing the walls of the tanks and cleaning of walls, ceiling and floor by using cleaning agent appropriate for tank cleaning like TERBAC G5/Inchlor-5/NB10 or govt approved laboratory tested chemical. (c) Third stage : fresh water cleaning by high speed jet pump with pressure 5 PSI. (d) Fourth stage : first bacteria screening is Sterilization the tank inner surface from all harmful pathogens by spraying non toxic, 100% biodegradable in nature, eco friendly, antibacterial agent by using TERBAC G65 / Inoxi60 / NB69 or govt approved laboratory certified. Test certificate from government laboratory mentioning suitability for sterilization should be submitted to the office before using for sterilization. (e) Fifth stage : Wet and dry vacuum cleaning by heavy duty industrial vacuum cleaner. (f) Sixth stage: Second bacteria screening and sterilizing method by using ultra violet radiation having bactericidal wave length to kill any possible residual bacteria in the reservoir walls/floor/ceiling/space inside the reservoir for minimum 1 hour. (g) Seventh Stage : Cleaning and third bacteria screening is to sterilize reservoir by using laboratory certified branded strong oxidizing agent safe for drinking water. Test certificate From Government Laboratory mentioning suitability for sterilization should be submitted to the office before using for Sterilization. (h) The wire mesh of ventilaters of the tank shall be replaced with new GI wire mesh. (j) Cleaning of external surfaces, lid wall of the tank, structure for all scales and other particles any algae, hives and any type of vegetation or any other unwanted matters, complete all as directed. (k) A sticker of appropriate size and colour as directed by Engineer-in-Charge and of non degradable material with printed details as under:- (i) CA No. (ii) Name of Applicant (iii) Name of the Contractor (iv) Columns for date of cleaning and expiry date will be written or printed on the sticker by permanent marking ink.
(k) Painting of angle iron ladder for UG sump after scrapping of old paint by emery paper or any other means with two coat of enamelled black paint over a coat of red oxide primer including arrangement of scrap folding/ bamboo structure required for entire work. (l) Painting of any type of pipe in side / outside the tank with suitable colour coding. Note: - (1) Contractor will submit Government laboratory test certificate and deploys 30 % of skilled sterilization team with minimum 3 months certificate holder in water tank sterilization . (2) Testing of raw and clear water from the reservoir as per physicochemical analysis of HMWS& SB by the contractor without any extra cost to department . (3) Contractor will make alternate arrangement to make sure of water supply to consumer or cleaning of tank in alternate days to avoid hampering of water supply, the same will be done as per instruction and as directed by Engineer-in-Charge. (4) Labour, Engineer, Supervisor, plant & Tools required for executing the work and for accommodation, safety of persons deployed on the work shall be contractors arrangement and responsibility. (5) In case the work in each stage of cleaning, disinfecting, finishing etc is found carried out inferior to the contract specifications & provisions and the work is still found to be technically, hygienically acceptable, the work will be devalued and recovery from contractor shall be made as to be decided by the competent authority in terms of condition 46 of IAFW-2249 amended up to date. (6) Before completion of work in each reservoir, writing letters or figures for date of cleaning and capacity of tank with synthetic enamel paint with black background & letters/numbers in white colour & words size 10 cm height on the tank with Date of cleaning and due date for next cleaning shall be marked on the reservoir by the contractor without any extra cost to department and also provide certificate confirming the completion of sterilization of water tanks, mentioning the name of station and date of cleaning. all the cleaning & Sterilization staffs should be under accidental insurance coverage and copy of the same to be submitted to the Engineer-in-Charge. (7) Contractor will not be allowed more than one day to do the work inside of the each OH Tank / UG Sump to prevent interruption of water supply to the users. (8) Work to be executed any area in the AOR of AGE E/M No -II (U)
All as per item No 58 here-in-before but the capacity of the tank is 500000 gallon (5 LG)
All as per item No 58 here-in-before but the capacity of the tank is 200000 gallon (2 LG)
All as per item No 58 here-in-before but the capacity of the tank is 50000 gallon
All as per item No 58 here-in-before but the capacity of the tank is 25000 gallon
All as per item No 58 here-in-before but the capacity of the tank is 10000 gallon
Syupplying and fixing twin LED Aviation light 6 watt Material: Aluminium Alloy IP Rating: IP- 65 Frequency: 50 - 60 Hz Input Voltage: 180 - 280V AC complete all as specified and directed. Note: Lights to be fitted at the top of over head tank. quoted rates inclusive of all arrangements required for fixing at the top of OHT including PCC and GI pipe etc
omsai thermax engineers
vvcenterprises
SN POWER TECH
Srinivash Engineers
THE DECAN ENGINEERING AND REFRIGERATION COMPANY
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .