| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹11.9 L+₹1.9 L (19.2%)Rejected-Finance | L2 | Rejected-Finance L2 Bidder |
Tender Value
₹11.9 L
EMD Value
₹23,800
Closing Date
6 Jul 2019, 5:30 pmClosed
EXECUTIVE ENGINEER PHE MAINTANANCE
PHE MAINTANANCE DASHEHRA MAIDAN
Complete Repairing and Rewinding of 2000 KVA 33/6.6 KV Crompton make transformer at Intake well, Gambhir
2019_UAD_33463_1
PHE/E-TENDER 88/2019
Open Tender
Civil Works - Water Works
Item Rate
30 days
at Gambhir plant ujjain
please refer tender documents
4 documents required · 4 mandatory
₹2,000
CMC UJJAIN
₹23,800
28 Jul 2020
22 Jun 2019
8 Jul 2019
22 Jun 2019
6 Jul 2019
22 Jun 2019
Amount
Disconnecting, discharging the 33 KV supply opening the connection HV & LV side of 2000 KVA 33/6.6 KV crompton make transformer
Complete opening all radiators and drain out old oil, lifting transformer from plinth and loading and lifting trnsformer from plinth and loading lifting by Crain and putting on truck
Openning the top cover of transformer, lifting and tacking out core from tank, dismantling the stamping of core and removing all damaged 3 phase coil HV & LV side of transformer
Manufacturing of new HV side coils using TPC copper conductor/dual coat SE copper conductor and applying suitable class of insulation and complete heating and processing work of coil
Manufacturing of new LV side coils using TPC copper conductor/dual coat SE copper conductor and applying suitable class of insulation and complete heating and processing work of coil
Refixing of all HV and LV side coil into the core making all the connection of coils and connection of coils and applying proper insulation to core , HV and LV coil and connection leads and reassemble the core complete heating the for better I.R. valve.
Fixing the core of into tank, complete replacing of HV bushing of transformer, also replacing new gas kit packing, complete refitting checking testing and oven heating of transformer at work shop etc. complete job.
Filling of new fresh insulation transformer oil i/c filtration oil complete job
Complete checking testing and repairing of OLCT wiring and components for proper operation of OLCT rais and lower of transformer taping of 2000 KVA 323/303 KV transfomer and complete providing and fixing of new contractor etc. along with wiring fuse of OLCT of 2000 KVA 33/6.6 KV transformer and complete job i/c testing at site Gambhir T.P.
Complete checking and testing of transformer only routine test.
Loading unloading and transportation of repaired transformer upto site and installation of transformer at substation complete reconnection LV and HV side connection as per I.E. rule complete cheking, testing and trail of transfromer at site.
Complete cheking testing of 2000 KVA 33/6.6 KV transformer RTCC panel complete cheking the wiring and repairing of wiring of panel and repairing remote control system of 2000 KVA 33/6.6 KV transfomer and complete job. Including testing of RTCC panel at site new contractor etc. along with wiring fuse in
Making arrange of silica jell breather i/c cutting and welding pipe.
Cleaning and painting of transformer i/c two coat of heart and oil testing insulation paint inside the tank.
Replacing of all hardware materials like nut-bolt, uper and bottom wall.
Providing and fixing of bucolz relay.
Providing and fixing of surge relay.
Providing and fixing of winding temperatue meter and oil temperature indication meter with senser.
Filling of insulation transformer oil i/c filtration oil complete job
Providing and fixing of 33 KV annuciator relay of 12 channel of proton make complete with wiring & testing
Providing and installation of master relay complete wiring & testing
Providing , replacing and fixing of 33 KV PT of one phase and testing complete job.
Providing , replacing and fixing of 33 KV PT of one phase and testing complete job.
Repair of battery charger including providing and fixing all the required material like fuse its base, connector, volt meter, SS, relay etc
Complete diconnecting supply AC & DC from panel, checking and testing of fault, repairing work of 110 V DC panel battery charger installed at 6.6 KV panel room. providing and replacing of resistance silicon diod TSR & Electronic plate and replacing of relay 1 No, changing of terminal point complete opening and reparing decarbonising of panel
T R JAISWAL
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .