Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹6.9 L+₹23,840.45 (3.57%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹7.0 L+₹34,473.43 (5.16%)Admitted-Fee/PreQual/Technical/Finance 135 135A PALANISAMY TOWER DHARMARAJ LAYOUT SOWRIPALAYAM CROSS ROAD RAMANATHAPURAM COIMBATORE 641 045 | COIMBATORE | TAMIL NADU | 641045 | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹7.1 L+₹41,735.91 (6.25%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹7.7 L+₹99,114.09 (14.8%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | ANANDKUMAR L5 | Viya Enterprises L7 | SRI MARUTHAMALAYAAN ENGINEERS L4 | TECTUS INFRA PVT LTD L3 | R.R. ENTERPRISES L2 | ANANDKUMAR T L1 | SRI BUILDERS L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling the existing damaged Plain cement concrete wall drain including all labours etc., complete | 31 | m3 | 570 ₹17,672.14 | 572 ₹17,734.15 | 400 ₹12,401.5 | 481 ₹14,912.8 | 453.51 ₹14,060.51 | 200 ₹6,200.75 Lowest | 520 ₹16,121.95 |
| 2.00 | Dismantling the existing damaged RCC Slab in Culvert including all labours etc., complete | 9 | m3 | 5,000 ₹45,000 | 5,071.34 ₹45,642.06 | 4,000 ₹36,000 | 4,265 ₹38,385 | 519 ₹4,671 Lowest | 2,000 ₹18,000 | 4,500 ₹40,500 |
| 3.00 | Earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including cost of all labour charges etc., complete as per standard specification 23 & 24 VI (S2) VII.9,10 | 90 | m3 | 220 ₹19,799.17 | 219 ₹19,709.18 | 150 ₹13,499.44 | 185 ₹16,649.31 | 50 ₹4,499.81 Lowest | 150 ₹13,499.44 | 220 ₹19,799.17 |
| 4.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 17 | m3 | 4,300 ₹73,100 Lowest | 5,962.42 ₹1,01,361.14 | 4,300 ₹73,100 Lowest | 5,014 ₹85,238 | 6,000 ₹1,02,000 | 5,000 ₹85,000 | 5,850 ₹99,450 |
| 5.00 | Centering with steel centering for revetment, drain and culvert upto 1.20m depth using MS
sheet of size 0.90X0.60m 10 gauge thick and stiffened with MS 'L' angle wood runners of size
0.075 X 0.05 three rows with support by casurina pullys 0.075 cm at 0.45 m length including
cost of nails etc., Area. 10.80 sq.mtr (upto 4 Feet) | 273 | m2 | 500 ₹1,36,500 | 534.1 ₹1,45,809.3 | 455 ₹1,24,215 | 450 ₹1,22,850 | 390 ₹1,06,470 Lowest | 440.43 ₹1,20,237.39 | 534 ₹1,45,782 |
| 6.00 | Plain Cement Concrete 1:3:6 (one cement, three four aggregates and six coarse aggregates) using 20mm aggregates and six coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 49 | m3 | 6,200 ₹3,03,800 | 6,721.56 ₹3,29,356.44 | 6,200 ₹3,03,800 | 5,653 ₹2,76,997 Lowest | 6,700 ₹3,28,300 | 6,000 ₹2,94,000 | 6,500 ₹3,18,500 |
| 7.00 | Plastering with cement mortar 1:4 (One part of Cement and Four part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete asper standard specifications
M2 314.06 | 63 | m2 | 314 ₹19,782 | 313 ₹19,719 | 200 ₹12,600 | 264 ₹16,632 | 240 ₹15,120 | 100 ₹6,300 Lowest | 309 ₹19,467 |
| 8.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams
,etc.,including strutting 3m high using mild steel sheets of size 90cm X
60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X
3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at
about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia
(spaced of 75cm C/C) complying with standard specification and directed
- 10 m 2 (P & D)Data 38 | 22 | m2 | 1,000 ₹21,998 | 1,181 ₹25,979.64 | 950 ₹20,898.1 | 993 ₹21,844.01 | 798 ₹17,554.4 | 1,000 ₹21,998 | 700 ₹15,398.6 Lowest |
| 9.00 | Reinforced Cement concrete in 1:1.5:3 (one cement, one and half sand and three metal) using 20mm hard broken metal to the standard specifications etc complete | 6 | m3 | 9,740 ₹58,435.13 | 9,744 ₹58,459.13 | 8,543 ₹51,253.73 | 8,196 ₹49,171.9 | 7,700 ₹46,196.15 Lowest | 8,000 ₹47,996 | 8,493 ₹50,953.75 |
| 10.00 | Supply and fabrication of RTS rods of various diameters including bending, cutting, placing in position including the cost of binding wire, labour charges etc., complete as directed | 6 | Q | 9,540 ₹57,235.23 | 9,542 ₹57,247.23 | 8,550 ₹51,295.72 | 8,025 ₹48,145.99 | 7,700 ₹46,196.15 Lowest | 8,000 ₹47,996 | 9,571 ₹57,421.21 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
27 Aug 2026, 3:00 pmClosed
Assisstant Commissioner-West Zone
West Zone, Coimbatore Corporation
Reconstruction of storm water drain and culvert at Cheran Nagar main road and cut roads in ward No 17 of west zone.
2026_MAWS_691167_2
E2/WESTZONE/2026
Open Tender
Civil Works
Works
90 days
West Zone, Coimbatore Corporation
As per the tender document attached
4 documents required · 4 mandatory
₹0
₹10,000
Yes
26 Sept 2026
5 Aug 2026
28 Aug 2026
5 Aug 2026
27 Aug 2026
5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the existing damaged Plain cement concrete wall drain including all labours etc., complete | 31 | m3 | - | - |
| 2 | Dismantling the existing damaged RCC Slab in Culvert including all labours etc., complete | 9 | m3 | - | - |
| 3 | Earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including cost of all labour charges etc., complete as per standard specification 23 & 24 VI (S2) VII.9,10 | 90 | m3 | - | - |
| 4 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 17 | m3 | - | - |
| 5 | Centering with steel centering for revetment, drain and culvert upto 1.20m depth using MS
sheet of size 0.90X0.60m 10 gauge thick and stiffened with MS 'L' angle wood runners of size
0.075 X 0.05 three rows with support by casurina pullys 0.075 cm at 0.45 m length including
cost of nails etc., Area. 10.80 sq.mtr (upto 4 Feet) | 273 | m2 | - | - |
| 6 | Plain Cement Concrete 1:3:6 (one cement, three four aggregates and six coarse aggregates) using 20mm aggregates and six coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 49 | m3 | - | - |
| 7 | Plastering with cement mortar 1:4 (One part of Cement and Four part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete asper standard specifications
M2 314.06 | 63 | m2 | - | - |
| 8 | Centering for soffits of RCC slabs of plane surface like lintels, beams
,etc.,including strutting 3m high using mild steel sheets of size 90cm X
60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X
3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at
about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia
(spaced of 75cm C/C) complying with standard specification and directed
- 10 m 2 (P & D)Data 38 | 22 | m2 | - | - |
| 9 | Reinforced Cement concrete in 1:1.5:3 (one cement, one and half sand and three metal) using 20mm hard broken metal to the standard specifications etc complete | 6 | m3 | - | - |
| 10 | Supply and fabrication of RTS rods of various diameters including bending, cutting, placing in position including the cost of binding wire, labour charges etc., complete as directed | 6 | Q | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
SWD.pdf
Tender Documents • 0.87 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
BOQ_831064.xls
BOQ • 0.26 MB
E2EMD.pdf
PDF • 0.08 MB
E2EMD.pdf
PDF • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .