| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 CrAccepted-AOC | ₹3.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.7 Cr+₹43.0 L (13.0%)Rejected-Finance | ₹3.7 Cr+₹43.0 L (13.0%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| 5 | Rejected-Technical 01 KHUMRIYAL KUPWARA KHUMRIYAL KUPWARA KUPWARA JAMMU KASHMIR 193223 | KUPWARA | JAMMU AND KASHMIR | 193223 | - | - | Rejected-Technical Non Responsive |
Tender Value
₹4.0 Cr
EMD Value
₹7.9 L
Closing Date
24 Jan 2020, 4:30 pmClosed
Superintending Engineer PMGSY (JKRRDA) Circle Sgr
Engineering Complex Block C, Rajbagh Srinagar 190008
Upgradation and Maintenance of road From T04 - Lokebawan Larikipora to Fathepora, Stage-U, Length 3.3Kms, Carriageway 5.5m PMGSY-II (2019-20), Package No. JK01-2011
2019_KSRRD_86737_1
JK012011
Open Tender
CIVIL
Item Rate
365 days
Anantnag
Please refer Tender documents.
18 documents required · 18 mandatory
₹10,000
Accounts Officer PMGSY Kashmir
₹7.9 L
Superintending Engineer PMGSY (JKRRDA) Circle Sgr
5 Apr 2021
28 Dec 2019
25 Jan 2020
28 Dec 2019
24 Jan 2020
28 Dec 2019
1 Jan 2020
Amount
PART A: SITE CLEARANCE
Clearing & grubbing road land including uprooting wild vegetation , grass, bushes ,shrubs, saplings & trees of girth up to 300mm , removal of stumps of such trees cut earlier & disposal of unserviceable materials up to a lead of 1000M including removal & disposal of top organic soil not exceeding 150mm in thickness as per technical specifications clause 201 (in area of non thorny jungle) by Mechanical means including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Uprooting of stumps and roots of trees ( Complete job)
300 - 600 mm Girth
600-900mm Girth
900-1800mm Girth
PART A: EARTHWORK
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.50 m, transporting to site, spreadind, grading to required slope and compacting to meet the requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Soecifications Clause 301.5 including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Construction of unlined surface drain of average cross sectional area 0.4 sqm in soil to specified lines, grades,levels and dimensions Excavated material to be used in embankment with a lift upto 3m and lead of 50m (average lead 25 m) .as per technical specificaions clause 307. Mechanical means including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
PART C: CROSS DRAINAGE WORKS
SECTION 1: PIPE CULVERT
Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matte and disposal upto a lead of 50mr, dressing of sides and bottom and backfilling with approved material complete job .(Finished work to be measured)
Laying Type B (First Class) Bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106 including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. PCC Grade M-10 including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job (Finished work to be measured).
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M-15 Grade including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job (Finished work to be measured).
Backfilling behind abutment,wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Behind abuts/wing walls including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
SECTION 2: i). 1 X 5M SPAN SLAB CULVERT (01 No.) ii). 1 X 2M SPAN SLAB CULVERT (03 No.)
Dismantelling of R.C.C work (slab)
Dismantelling of stone masonary in cement sand mortar(abuts)
Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matte and disposal upto a lead of 50mr, dressing of sides and bottom and backfilling with approved material complete job .(Finished work to be measured)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. PCC Grade M-10 including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. PCC Grade M-15 including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Plain/reinforced concrete in substructure complete as per drawings and technical specifications Clause 802, 804,805,806,807, 1202 & 1204. PCC Grade M-15 including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Providing and laying reinforced cement concrete in superstructure as per drawings and technical specification clause 800, 1205.4 and 1205.5. R.C.C Grade M-25 including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Supplying , fitting and placing TMT bar reinforcement (Fe 415) in superstructure complete as per drawing and technical specification clauses 1002, 1010 and 1202 including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job (Finished work to be measured).
Providing fitting and fixing in position pipe railing consisting of IS Rolled steel joist posts designation IS MB 100 (100x75) at 2.5m interval and three rows of 50mm dia steel pipes (light) including fixing in position on bridge deck complete as per drawing and technical specifications clause 1208.2.
Providing weep holes in plain/reinforced cement concrete abutment, wing wall & return wall with 100mm dia AC pipe extending through the full width of the structures with slope of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204. 3.7 including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Backfilling behind abutment,wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Behind abuts/wing walls including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Diversion of nallah & dewatering of trenches during excavation of work complete Job
SECTION 3: PIPE BED DIVERSIONS (04 Nos.)
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. (500 mm dia.) including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Backfilling behind abutment,wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Behind abuts/wing walls including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
PART D: PROTECTION WORKS
Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matte and disposal upto a lead of 50mr, dressing of sides and bottom and backfilling with approved material complete job .(Finished work to be measured)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. PCC Grade M-10 including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M-15 Grade including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Providing plums in the PCC work vide including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M-20 Grade (Flooring) including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Providing weep holes in plain/reinforced cement concrete abutment, wing wall & return wall with 100mm dia AC pipe extending through the full width of the structures with slope of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204. 3.7 including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8.Material available at site (Granular material) including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
PART E: SIDE DRAIN
Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matte and disposal upto a lead of 50mr, dressing of sides and bottom and backfilling with approved material complete job .(Finished work to be measured)
Laying Type B (First Class) Bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. PCC Grade M-10 including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M-15 Grade including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Providing concrete for plain/reinforced concrete in substructure complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 RCC M-20 Grade including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job ( Finished work to be measured).
Supplying , fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawing and technical specification clauses 1002, 1010 and 1202 including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job (Finished work to be measured).
PART F: PAVEMENT
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
Scarifying existing bituminous surface to a depth of 150mm and disposal of scarified material with a lift upto 3m and lead upto 1000m as per T.S. clause 301.4. @ 20% of surface area including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Construction of water bound macadam using locally available material Providing, laying spreading and compacting local material in block or large discrete particles, such as kankar, Laterite, Dhandla etc. as per Table 400.13 to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming requisite type of screening /binding materials to fill-up the interstices of laid material watering and compacting to the required density as per Clause 405.3 and Technical Specification Cluase 408.bincluding cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Providing ,laying ,spreading and compacting graded stone aggregate to Wet Mix Macadam specification as per techinical specification Clause 406.Including premixing the material with water at OMC in Mechanical Mix plant , cost and carriage of all materials from approved plant to site with all leads and lifts and octori etc Laying in uniform layers with paver in sub-base/ base course on well prepaired surface and compacting with vibratory Roller to achieve the desired Density including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Prime Coat: Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (Low Porosity) including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Bituminous Macadam : Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504 including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Tack Coat: Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surfaces cleaned with Hydraulic broom as per Technical Specification Clause 503 including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
20mm thick OGPC: Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.(By Mechanical Means) Bitumen S-90 including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Seal Coat: Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 (By Manual Means) including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Hard Shoulder: Construction of hard shoulders using WBM material as per Technical Specifications Clause 405.3 & 408 including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
PART G: ROAD FURNITURE
Providing and fixing Retro-Refllectorised cautionary , mandatory and Informatory Sign as per IRC :67 made of encapsulated lense type reflective sheeting wide clause 1701, 2.3 fixed over aluminum sheeting 1.5mm thick supported on a mild steel angle iron post 75 x75 x6mm steel tube firmly fixed to the ground by properly designed foundation with M-15 grade cement concrete 450 x450 x 600mm , 600mm below round level as per drawing and technical clause 801 including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Reinforced cement concrete M15 grade boundary pillar/local stone of standard design as per IRC:25 fixing in position including finishing and lettering , painting , concreting, ercting,loading, unloading, haulage etc. as per drawings and technical specifications cluase 1704 including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Providing & fixing PMGSY Citizen Information Boards as per drawings and technical specifications .
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured). Ordinary Kilometer Stone (Precast)
a). Ordinary Kilometer Stone (Precast)
b). 200 mtr stones
Construction of job piller/bench mark as per Fig. 1600.1( d) as per drawing and Technical Specification Clause 1602.4 including cost & carriage of material from source to work site with all leads & lifts including loading unloading haulage octri complete Job( Finished work to be measured).
Maintenance Cost of 1st year
Maintenance Cost of 2nd year
Maintenance Cost of 3rd year
Maintenance Cost of 4th year
Maintenance Cost of 5th year
The Contractor has to quote the rates for Construction part without GST and GST @12% shall be added at the time of Allotment.
tawseef builders
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .