Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹30.6 LAccepted-AOC 13 1 SIDCO INDUSTRIAL ESTATE METTUR DAM 636402 | SALEM | TAMIL NADU | 636402 | ₹30.6 L Quoted ₹29.2 L | 1 | Accepted-AOC L1 |
| 2 | 2₹33.2 LRejected-AOC M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹33.2 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | KUMAR ERECTORS L1 | THIAGARAJAN ENGINEERING CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for renewal of defective boiler tubes of size above 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test | 300 | Joints. | 7,161 ₹21.5 L | 8,138 ₹24.4 L |
| 2.00 | Charges for fin welding: Charges for fin welding by cleaning, surface preparation and welding. | 500 | Mtrs. | 818 ₹4.1 L | 912 ₹4.6 L |
| 3.00 | ARC FILLING: Grinding of Boiler tubes for Arc filling of size 150 x 25 MM area for 3 Layers | 50 | Nos. | 3,688 ₹1.8 L | 4,116 ₹2.1 L |
| 4.00 | ARC FILLING: Charges IBR Welder for Arc filling of area 150 x 25 MM by 3 layer | 50 | Nos. | 1,671 ₹83,550 | 1,865 ₹93,250 |
| 5.00 | Cutting gas Oxygen & Acetylene | 4 | Sets | 4,134 ₹16,536 | 4,614 ₹18,456 |
| 6.00 | Argon gas for Tig welding | 5 | Nos. | 3,304 ₹16,520 | 3,688 ₹18,440 |
| 7.00 | Welding electrode Supratherm special 2.5mm with material/ manufacturer's test certificate | 2,100 | Nos. | 8.14 ₹17,094 | 9.27 ₹19,467 |
| 8.00 | Welding electrode Supratherm special 3.15mm with material/ manufacturer's test certificate | 3,500 | Nos. | 11.98 ₹41,930 | 12.48 ₹43,680 |
| 9.00 | T &P and consumables | 1 | LS | 2,040 ₹2,040 | 21,250 ₹21,250 |
Tender Value
Refer Docs
EMD Value
₹28,200
Closing Date
9 Jun 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Unit I Boiler pressure parts AOH 2025 Rectification Replacement of defective tubes in water wall area S panel area Water wall reducer tubes etc
2025_EB_561619_1
CE / MTPS-I / SE / M-I / BM /OT.100/ 2025-26
Open Tender
Power/Energy Projects/Products
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
₹28,200
Yes
26 May 2026
26 May 2025
10 Jun 2025
26 May 2025
9 Jun 2025
26 May 2025
Amount
Charges for renewal of defective boiler tubes of size above 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test
Charges for fin welding: Charges for fin welding by cleaning, surface preparation and welding.
ARC FILLING: Grinding of Boiler tubes for Arc filling of size 150 x 25 MM area for 3 Layers
ARC FILLING: Charges IBR Welder for Arc filling of area 150 x 25 MM by 3 layer
Cutting gas Oxygen & Acetylene
Argon gas for Tig welding
Welding electrode Supratherm special 2.5mm with material/ manufacturer's test certificate
Welding electrode Supratherm special 3.15mm with material/ manufacturer's test certificate
T &P and consumables
THIAGARAJAN ENGINEERING CONTRACTOR (BID ID -1361105)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid