Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 CrAccepted-AOC KUKUHAWA POST GAURABADSHAHPUR JANPAD JAUNPUR | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.7 Cr+₹21.2 L (2.83%)Rejected-AOC S 10 2 1 L RAM SINGH KATRA HUKULGANJ VARANASI | VARANASI | UTTAR PRADESH | L2 | Rejected-AOC L2 |
Tender Value
₹7.9 Cr
EMD Value
₹15.9 L
Closing Date
4 Oct 2024, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office Superintending Engineer 14th Circle Irrigation Work Azamgarh
Demarcation and restoration work of Shahganj Dy. in Sharda Sahayak Khand-36 Jaunpur.
2024_UPIDC_960026_1
05/SE/2024-25
Open Tender
Civil Works
Item Rate
180 days
JAUNPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,614
₹15.9 L
Yes
AZAMGARH
27 Nov 2024
28 Sept 2024
4 Oct 2024
28 Sept 2024
4 Oct 2024
28 Sept 2024
30 Sept 2024
Amount
Jungle Clearance with Cutting and removing of Sarpat etc.
Earth work in correcting internal section of canal including side slope cutting at required slope with all lead and lift in all type of soil with disposal on outer slope of bank as directed by site incharge including spreading and dressing.
Earth work in correcting outer section of canals with mannual compaction and dressing including making outer slope and daula with all lead and lift in all type of soil as directed by site incharge.
E/W in foundation in all kind of soil with all lead and lift and including filling, watering, remain of excavated earth into the trenches and removal and disposal of surplus earth as directed by Engineer-in-charge within a distance of 30M from the foundation trenches.
Laying of C.C. 1:3:6 in foundation with cement corace sand and stone ballast 20mm to 40mm size including cost of all material and labour T&P etc.
B/W with 1:4 cement mortor with brick class 150, cement ,coarse sand including cost of all material and labour T&P etc.
B/W with 1:3 cement mortor with brick class 150, cement ,coarse sand including cost of all material and labour T&P etc.
Centering and shuttering for R.C.C slab,bed block including cost of all material ,labour T&P etc.
Carriage,cutting,bending,binding, placing in position of steel bar including cost of all material,labour , T&P etc.
Laying R.C.C. 1:1.5:3 in slab and bed block with cement dalla stone grit 10mm to 20mm size and coarse sand including cost of all material and labour T&P etc.
Laying of C.C. 1:1.5:3 inWearing coat with cement dalla stone grit 10mm to 20mm size and coarse sand including cost of all material and labour T&P etc.
Cement pointing stuck deep in 1;2 C.M. with cement coarse sand including cost of all material, labour T&P etc.
E/W in making ramp and road diversion in all kind of soil with all lead and lift and manual compaction and dressing etc.
Running of 5 H.P Generater set diesel pump for dewatering work arrangment of pump suction and delivery pipi, fule & lubricant for pump.
Providing and fixing sign board/caution board including cost of carriage and all charge
S/F PVC pipe 50mm dia 0.50m. Long for drainage spout pipe .
Dismentling B/W in cement mortor including stacking of material within a distance of 60M.
Dismentling cement concrete work in 1:2:4 mortor including stacking of material within a distance of 60M .
12 mm thick cement plaster work with 1:4CM including all cost of material, labour and T&P etc. Complete.
Laying CC 1:2:4 for collar jointing
S/Laying RCC pipe 150mm Dia.
Fabrication of mild steel/Iron work in gate including cutting, drilling, welding and fixing in position including cost of all material, labour and T&P required for proper completion of work.
Painting with snowcem. in two coats with cost of all materials labour and T&P etc..
Writting letter on boundry stone pillar above 50MM
C.C. Work 1:4:8 in foundation with brick ballast including all cost of material labour and T&P etc.
S/F Km stone.
Earth work in clearance of syphon by mannual labour including all lead and lift in all types of soil with disposal as directed by site incharge.
Providing and laying LDPE Film including cost of all material labour and T&P
Filling 100mm Thick Coarse Sand on Bed
Filling sealing compound between construction joint and contraction joint in Groove
20MM Thick 1:2 CM plaster with C-Sand and floating coat of neat Cement.
S/F Wheel guard.
Brick on edge with M 150 Brick Laid Dry joints Sand filling including preparation of Base to Proper Slope and its Ramming including supply of all material, Labour and T&P required for proper completion of work.
VINOD KUMAR SINGH
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .