Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.9 LAccepted-AOC TUTICORIN | VIRUDHUNAGAR | TAMIL NADU | 626202 | ₹23.9 L Quoted ₹28.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹29.4 LRejected-AOC | ₹29.4 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | PARVATHI ENTERPRISES L2 | ARASU CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for Cleaning the spilled and accumulated coal on the conveyor floor, head and tail end areas, deck sheets, walkways and disposal through the running conveyors including cost of consumables, hire charges for T&Ps leads & lifts etc., complete. | 350 | Activity | 4,72,500 ₹5.6 L | 4,21,750 ₹5.0 L |
| 2.00 | Charges for operation of the two way tripper gate A&B at Stage-III bunker floor according to the desiring of coal feeding either to Unit-4 or 5 or to Unit-1 to 3 - round the clock monitoring of the equipments in the Conveyor-74 and its connected chutes like adjusting belt train up and skirt rubber, renewal of defective idler frame/ idlers, and condition monitoring of chute liner plates and deflector plates- patch up work and welding work including cost of consumables, hire charges for T&Ps all leads and lifts etc., complete. | 350 | Activity | 15,05,000 ₹17.8 L | 14,42,700 ₹17.0 L |
| 3.00 | Charges for assisting works for belt joint in slope conveyor 74 including arresting the belt by providing clamps lifting the counter weight dismantling the idlers and idler frames and skirt board assembly and re-fixing the same after vulcanizing the joint including T&P hire charges cost of consumables etc., complete. | 2 | No. | 1,20,000 ₹1.4 L | 1,19,540 ₹1.4 L |
| 4.00 | Charges for assisting works for pulley lagging works in conveyor 74 including arresting the conveyor belt lifting the counter weight and normalizing the system after pulley lagging, trail operation including T&P hire charges cost of consumables etc., complete. | 4 | No. | 2,40,000 ₹2.8 L | 2,39,080 ₹2.8 L |
| 5.00 | Charges for overhauling and inspection of pulley bearings and replacement if necessary in tail pulley / tail snub pulley / bend pulley and take up moveable pulley in conveyor 74 including arresting the conveyor belt lifting the counter weight and normalizing the system after bearing overhauling, trial operation including the cost of consumables, T&P hire charges etc., complete. | 4 | Operation | 3,84,000 ₹4.5 L | 3,80,000 ₹4.5 L |
| 6.00 | Charges for overhauling and inspection of pulley bearings and replacement if necessary in head pulley / head snub pulley / drive pulley in conveyor 74 including arresting the conveyor belt lifting the counter weight and normalizing the system after completing bearing overhauling, trial operation including T&P hire charges and cost of consumables etc., complete. | 2 | Operation | 2,14,000 ₹2.5 L | 2,13,650 ₹2.5 L |
Tender Value
Refer Docs
EMD Value
₹19,900
Closing Date
2 Jan 2026, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
ICHP- Attending preventive maintenance and monitoring works to avoid breakdown in Conveyor-74.
2025_EB_632981_1
CE/SE/MI/TTPS/18/2026-2027
Open Tender
Miscellaneous Works
365 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹19,900
Yes
23 Mar 2026
17 Dec 2025
3 Jan 2026
17 Dec 2025
2 Jan 2026
17 Dec 2025
Charges for Cleaning the spilled and accumulated coal on the conveyor floor, head and tail end areas, deck sheets, walkways and disposal through the running conveyors including cost of consumables, hire charges for T&Ps leads & lifts etc., complete.
Charges for operation of the two way tripper gate A&B at Stage-III bunker floor according to the desiring of coal feeding either to Unit-4 or 5 or to Unit-1 to 3 - round the clock monitoring of the equipments in the Conveyor-74 and its connected chutes like adjusting belt train up and skirt rubber, renewal of defective idler frame/ idlers, and condition monitoring of chute liner plates and deflector plates- patch up work and welding work including cost of consumables, hire charges for T&Ps all leads and lifts etc., complete.
Charges for assisting works for belt joint in slope conveyor 74 including arresting the belt by providing clamps lifting the counter weight dismantling the idlers and idler frames and skirt board assembly and re-fixing the same after vulcanizing the joint including T&P hire charges cost of consumables etc., complete.
Charges for assisting works for pulley lagging works in conveyor 74 including arresting the conveyor belt lifting the counter weight and normalizing the system after pulley lagging, trail operation including T&P hire charges cost of consumables etc., complete.
Charges for overhauling and inspection of pulley bearings and replacement if necessary in tail pulley / tail snub pulley / bend pulley and take up moveable pulley in conveyor 74 including arresting the conveyor belt lifting the counter weight and normalizing the system after bearing overhauling, trial operation including the cost of consumables, T&P hire charges etc., complete.
Charges for overhauling and inspection of pulley bearings and replacement if necessary in head pulley / head snub pulley / drive pulley in conveyor 74 including arresting the conveyor belt lifting the counter weight and normalizing the system after completing bearing overhauling, trial operation including T&P hire charges and cost of consumables etc., complete.
PARVATHI ENTERPRISES (BID ID -1551178)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_757291.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid